• Title/Summary/Keyword: 작업공간간섭

Search Result 21, Processing Time 0.028 seconds

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

Workspace Generation and Interference Optimization Algorithm by Work-type using 3D Model Object in a Construction Project (건설프로젝트의 작업유형별 3차원 작업공간 생성 및 간섭 최적화 방안)

  • Kim, HyeonSeung;Moon, HyounSeok;Kim, ChangHak;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1911-1918
    • /
    • 2014
  • The increase of input resources, such as labor and equipment, in a construction project causes workspace interference between activities and it influences on the productivity and quality of construction activities. To solve this problem, many studies related to the workspace interference have been performed, however they verified the workspace concerning with only the geometric location of activities or generated the shape of workspace by a whole object concept not separated units of detailed operations. It is difficult for project manager to reasonably analyze the workspace conflict, because the size of workspace cannot reflect the characteristics of an activity and input time of a resource. This paper presents a methodology that can generate three-dimensional models in order to optimize the workspace shape and size by considering with the characteristics of each activity and input time of each resource. The suggested method can be used for the active BIM system that optimizes the workspace conflict without additional construction duration and for the searching algorithm of optimized moving path for construction equipment.

Main Cause of the Interference between Visual Search and Spatial Working Memory Task (시각 탐색과 공간적 작업기억간 상호 간섭의 원인)

  • Ahn Jae-Won;Kim Min-Shik
    • Korean Journal of Cognitive Science
    • /
    • v.16 no.3
    • /
    • pp.155-174
    • /
    • 2005
  • Oh and Kim (2004) and Woodman and Lurk (2004) demonstrated that spatial working memory (SWM) load Interfered concurrent visual search and that search process also impaired the maintenance of spatial information implying that visual search and SWM task both require access to the same limited-capacity mechanism. Two obvious possibilities have been suggested about what this shared limited-capacity mechanism is: common demand for attention to the locations where the items f9r the two tasks were presented (spatial attention load hypothesis), and common use of working memory to maintain a record of locations have been processed(SWM load hypothesis). To test these two hypothetical explanations, Experiment 1 replicated the mutual interference between visual search and SWM task in spite of difference of procedure with preceding researches; possible areas where the items for two tasks were presented were not separated. In Experiment 2, we presented the items for visual search either in the same quadrants where the items for SWM task had appeared (same-location rendition) or in the different quadrants (different-location condition). As a result, search efficiency was more impaired in the different-location condition than in the same-location condition. The memory accuracy was worse in the different-location rendition than in the same-location rendition. Overall results of study indicate that the mutual interference between SWM and visual search might be related to the overload of spatial attention, but not to that of SWM.

  • PDF

The Design of Robot for Live-line Maintenance of the Distributed Power Line (배전선로 활선작업용 로봇 설계)

  • Kim, Chang-Hoi;Lee, Sung-Uk;Shin, Ho-Cheol;Kim, Sheung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.120-122
    • /
    • 2006
  • 배전선로의 활선작업은 무전전의 고품질 전력 공급을 위한 필수적인 기술이나 매년 안전사고가 발생하고 있는 위험한 작업 분야이다. 이러한 위험한 활선 작업을 로봇이 대신하여 수행하기 위한 연구가 외국에서는 오래 전부터 추진되고 있다. 본 연구에서는 배전선로 상에서 활선작업을 수행하기 위한 로봇을 설계하였다. 선로 상에서 최대한의 작업공간을 확보하면서 작업을 수행토록 하기 위하여 로봇의 탑재 위치에 따른 로봇의 작업성능을 분석하여 로봇의 구조를 설계하였으며 로봇의 기구학적 해석 및 전주 및 완금 등의 부속물과의 간섭을 그래픽 시뮬레이션을 통하여 설계의 타당성을 검증하였다. 개발될 로봇은 배전선로의 애자교체, COS 교체 등의 다양한 분야에서 작업자를 대신하여 활선작업을 수행 수 있을 것으로 예상된다.

  • PDF

Private Virtual Computing for the Secure Surrogate in Ubiquitous Computing (유비쿼터스 컴퓨팅에서 안전한 위탁을 위한 Private Virtual Computing)

  • Park, Jong-Youl;Lee, Dong-Ik;Kim, Hyoung-Chun;Park, Joong-Gil;Lee, Jin-Seok
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2003.11c
    • /
    • pp.1847-1850
    • /
    • 2003
  • 유비쿼터스 컴퓨팅의 발전은 사용자에게 컴퓨터가 단순한 도구가 아닌 삶의 일부가 되는 커다란 변화이다. 하지만 대부분의 사용자는 자신이 악의적인 주변의 컴퓨팅 자원에 의해서 위협 받고 있다는 사실을 모르고 있다. 사용자가 수행하는 작업을 안전하게 완료하기 위해서는 자신의 작업공간이 주변의 컴퓨팅 자원에 의해서 간섭 받거나 훼손되지 않아야 한다. 본 논문에서는 이러한 안전한 작업공간을 제공하기 위해서 Private Virtual Computing을 제안한다.

  • PDF

Development of a Soil Distribution Method and Equipment Operation Models Using Worker's Heuristics (작업자의 휴리스틱을 적용한 토량배분 및 장비운영 모델 개발)

  • Lim, So-Young;Kim, Sung-Keun;Ahn, Seo-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.551-564
    • /
    • 2016
  • Earthworks are the fundamental steps in a construction job, and are mainly comprised of smaller tasks performed by construction machinery. The productivity of the construction job can be improved by optimizing excavation, filling, and other such operations. Earthworks involve a lot of mechanical work performed by the collaboration between various kinds of construction equipment, which in turn leads to higher fuel consumption. Actual earthworks depend mostly on the intuition and experience of the driver of the machines, thus leading to inefficiency and environmental problems caused by unnecessary emission of carbon, Recently automated and information-oriented technologies are consistently being researched towards the improvement of efficiency of earthworks in the construction industry. The present research involves the introduction and understanding of the decision-making elements of heuristics which can be applied to the earthwork planning. A method is also suggested for creating an effective work path for construction machine to perform task packages (TP) for cutting and filling processes. A simulation test is performed to verify the effectiveness of suggested methods in terms of space interference and total moving distance of construction equipment.

Analysis of the Workspace of Cubic Parallel Manipulator (육면형 병렬기구의 작업공간 해석)

  • Choi, Woo-Chun;Jung, Tae-Joong
    • Proceedings of the KSME Conference
    • /
    • 2000.11a
    • /
    • pp.795-800
    • /
    • 2000
  • In a parallel manipulator, there are three constraints that determine workspace: link length constraint, passive joint angle constraint, and interference among links. Generally, the link length constraint is the most dominant. The interference among links is, however, also an important parameter in designing a desired parallel manipulator. In this study, the interference among links is mathematically modeled by considering the links as a line and a cylinder of radius of twice the link radius, and a new algorithm is suggested to check if arbitrary two links interfere each other or not. The workspace of a cubic parallel manipulator is illustrated in a 2D space satisfying the three constraints.

  • PDF

A Study on the Improvements of Interior Space regarding the Characteristics of Architectural Design Studio (설계스튜디오의 특성에 따른 실내공간 개선에 관한 연구)

  • Song, Byung-Ha
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.1
    • /
    • pp.454-463
    • /
    • 2013
  • Upon changing architectural education system into 5-year program, the design studio in university should meet the requirement in order to acquire the accredition. This study investigates on student' perceptions and responses, according to the configuration(open, mixed, closed), to their studio environment. Results and suggestions are as follows for all types: First, there should be space for individual activities for the student: Second, excluding space for excluding space for the individual work, seperated area must be provided for co-operative work, such as making models; Third, a clear territorial distintion between the individual and the co-work space should be able to set by the students, using. for instance, movable partition or corridor; Fourth, however, in line with the types, a seperated lecture or seminar room in the open type, a device to prevent distraction such as noise in the mixed type, and more space for co-work in the closed type are also suggested.

A Study on the Secure method of Construction Workspace by using Building Information Modeling (BIM을 활용한 작업공간 확보 방안에 관한 연구)

  • Song, Dong-Hyeon;Lee, Sang-Beom;Song, Ho-San
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.9-10
    • /
    • 2011
  • Domestic construction industry suffered from the IMF and makes a great effort to improve in 'cost management', 'strengthening the competitiveness of the construction industry'. Therefore, the industry has become interested in improving the productivity of construction and ongoing research is being progressed in various angles. In such circumstances, the needs for a study of concepts and space of the actual construction work place is emerging. This study were utilized BIM to understand the types and causes of problems in space during the finishing work in construction and categorize importance and frequency of occurence through a survey of experts and AHP to analyze the realtive effects of importance then modeling to them to aware of issues and give direction for efficient management. This study is anylize the problem which is caused by same time process in finishing work progress of apartment applied by BIM. and categorize the type of work interference management in finishing work, and anylize by the type of occurence then predict the work interference management through in BIM 3D VIEW and suggest the solutions.

  • PDF

Prediction of Principal Frequency of Ground Vibration from Delayed Blasting (지연시차에 따른 발파진동의 주파수 특성 예측)

  • Chung, Doo-Sung;Kang, Choo-Won;Ko, Jin-Seok;Chang, Ho-Min;Ryu, Pog-Hyun
    • Tunnel and Underground Space
    • /
    • v.20 no.2
    • /
    • pp.112-118
    • /
    • 2010
  • Before blasts that can have direct impacts on human bodies or structures, it is necessary to assess impacts of ground vibration. Therefore, frequency has been recognized as an important factor in order to assess impact on ground vibration and damages. There have been many studies on impacts of frequency. But, there have been no studies on relations between vibration and frequency according to delay time difference. In this study, we examined the relations between delay time difference and frequency according to each frequency with which reinforcement and destructive intervention repeat through delay time difference obtained using superposition modeling of single hole blasting waveform based on the theory of time difference developed by Langefors.