Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

Mobile Control of working robot for a Installed Trolley Cable (전동차 트로이선 가설 작업 로봇의 이동제어)

  • Kim, Sil-Keun;Hong, Soon-Ill;Hong, Jeong-Pyo
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.30 no.8
    • /
    • pp.934-940
    • /
    • 2006
  • The aims of this study is to develop working robot for a installed trolley cable of an electric train and objective of this paper is to implement mobile control of working robot. In this paper an approach to method for scheme of a mobile control system is presented in a dynamic hybrid velocity/tension control of working robot. The working robot is composed the velocity and tension controllers using the concept of two-degrees-of-freedom servo-controller. This robot moved at same time a certain distance to constrain a constant tension and installed a trolley cable of an electric train. To move the robot the velocity control system have design and implemented. Simulation and experimental results are presented to illustrate the validity of designed mobil scheme.

오리축사 현대화시설 선도 농가

  • 한국오리협회
    • Monthly Duck's Village
    • /
    • s.225
    • /
    • pp.2-9
    • /
    • 2022
  • 매년 찾아오는 가축 질병과 강화되는 정부 규제 등 생산기반이 위축되는 상황에서 현 오리사육 농가가 생산성을 높여야 할 필요가 있다고 느낀 청정오리농장 황문주 대표는 고상식 오리사를 도입했다. 고상식 오리사는 깔짚을 사용하지 않아 작업자가 오리사에 들어갈 필요가 없어 작업자로 인한 가축질병 감염 위험이 특히 적다. 또 단위면적당 사육수수 증가로 더 많아 소득에도 도움이 될 것으로 기대된다. 특히 최근 정부에서 가설건축물에 대한 축산업 허가를 불허하고 기존 가설건축물도 5년 이내 건축허가를 받아야만 한다. 청정오리농장은 기존 비닐하우스 축사를 보강해 무창 오리사로 리모델링을 통해 정식 건축허가를 받았다는 점도 주목할만하다. 기존 축사를 리모델링할 경우 신축 대비 비용도 1/3로 절감 가능하다는게 황 대표의 설명이며 축사에 대한 투자 여력이 부족한 오리농가들에게 대안으로 주목받고 있다. 이 뿐만 아니라 황문주 대표는 최근 새로운 도전에 나서고 있다. 축사 1동을 고상식 축사로 개조해 사육실험을 하고 있는 것이다. 고상식 축사는 깔짚이 필요없을 뿐만 아니라 환경개선으로 질병차단은 물론 생산성 향상에도 크게 도움이 되고 있다는 것이 황 대표의 설명이다.

  • PDF

6m 파이프써포트의 내력에 관한 연구

  • 노민래;최순주;김대영
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.11a
    • /
    • pp.191-196
    • /
    • 2002
  • 건설현장에서 발생하는 중대재해에서 한 건에 여러 명의 사상자를 내는 대표적인 재해는 콘크리트 타설공사중 발생하는 붕괴재해이다. 특히, 가설기자재 성능검정규격이 정해지지 않은 6m 파이프써포트는 비검정품으로써 생산 및 사용이 금지되어 있는 가설재이지만, 체육관ㆍ상수도 배수지공사ㆍ건축물의 지하진입로 등에서 주로 사용되고 있으며, 이들을 사용한 콘크리트 타설작업에서 중대재해가 발생하는 경우가 많다.(중략)

  • PDF

6m 파이프써포트의 개발에 관한 실험적 연구

  • 노민래;이근배;최순주;이기태;김대영
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.321-326
    • /
    • 2003
  • 건설현장에서 발생하는 중대재해에서 한 건에 여러 명의 사상자를 내는 대표적인 재해는 콘크리트 타설공사중 발생하는 붕괴재해이다. 특히, 가설기자재 성능검정규격이 정해지지 않은 6m 파이프써포트는 비검정품으로써 생산 및 사용이 금지되어 있는 가설재이지만, 체육관·상수도 배수지공사·건축물의 지하진입로 등에서 주로 사용되고 있으며, 이들을 사용한 콘크리트 타설작업에서 중대재해가 발생하는 경우가 많다.(중략)

  • PDF

Study under productivity measurement and verification of the underground temporary material installation work by simulation technique (시뮬레이션을 활용한 지하가설물 설치작업의 생산성 측정 및 검증에 관한 연구)

  • Bae Yeon-Jin;Park Sang-Hyuk;Han Seung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.427-432
    • /
    • 2004
  • As it is keen competition of a construction market and the recognition that increases construction productivity for maintaining competitiveness, it is increased importance of an interest about productivity and efficiency in the construction industry. This study measures productivity through the instance of investigation that the existing productivity measurement method was utilized and presented a work improvement matter based on the measured contents. The proposed improvement matter is verified through a simulation technique. The purpose of this paper is for a field supervisor to have presented the way that a selection does the most suitable work method to be suitable for a situation, and can forecast production, though a simulation technique is not the most alternative that considered field condition in analyzing productivity measurement.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

Main Cause of the Interference between Visual Search and Spatial Working Memory Task (시각 탐색과 공간적 작업기억간 상호 간섭의 원인)

  • Ahn Jae-Won;Kim Min-Shik
    • Korean Journal of Cognitive Science
    • /
    • v.16 no.3
    • /
    • pp.155-174
    • /
    • 2005
  • Oh and Kim (2004) and Woodman and Lurk (2004) demonstrated that spatial working memory (SWM) load Interfered concurrent visual search and that search process also impaired the maintenance of spatial information implying that visual search and SWM task both require access to the same limited-capacity mechanism. Two obvious possibilities have been suggested about what this shared limited-capacity mechanism is: common demand for attention to the locations where the items f9r the two tasks were presented (spatial attention load hypothesis), and common use of working memory to maintain a record of locations have been processed(SWM load hypothesis). To test these two hypothetical explanations, Experiment 1 replicated the mutual interference between visual search and SWM task in spite of difference of procedure with preceding researches; possible areas where the items for two tasks were presented were not separated. In Experiment 2, we presented the items for visual search either in the same quadrants where the items for SWM task had appeared (same-location rendition) or in the different quadrants (different-location condition). As a result, search efficiency was more impaired in the different-location condition than in the same-location condition. The memory accuracy was worse in the different-location rendition than in the same-location rendition. Overall results of study indicate that the mutual interference between SWM and visual search might be related to the overload of spatial attention, but not to that of SWM.

  • PDF

An Analysis on the Factors of Risk Behavior of Foreign Workers in Construction SitesSites (건설현장 외국인 작업자의 위험행동 요인에 관한 분석)

  • Choi, Hyun-Jun
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.211-212
    • /
    • 2022
  • 본 연구에서는 경기도 일대 2곳의 대형 아파트 현장의 외국인 작업자 165부의 유효 설문지를 바탕으로 외국인 작업자들의 습관적 행위, 공격성, 상황회피, 심리불안 요인이 위험행동과 안전사고 위험지수에 미치는 영향 관계를 가설검증을 통해 습관적 행위, 공격성, 상황회피 및 심리불안 요인은 위험행동에 영향을 미치는 것으로 나타났으며, 습관적 행위 요인은 안전사고 위험지수에도 영향을 주는 것으로 나타났다. 하지만 공격성, 상황회피, 심리불안 요인은 안전사고 위험지수에 유의한 영향을 미치지 않는 것으로 나타났다. 그러나 위험작업 행동은 안전사고 위험지수에 유의한 영향을 미치는 것으로 나타나 개인적인 성향과 연관이 있는 습관적 행위, 공격성, 상황회피 및 심리불안의 상태가 위험작업으로 발전할 수 있고, 이러한 위험작업행동은 안전사고로 이어질 수 있는 결과를 알 수 있었다. 따라서 외국인 건설현장 작업자의 증가로 인한 안전사고의 증가 문제는 외국인 작업자 때문이기 보다는 외국인 작업자 개인의 성향에 초점을 둘 필요성이 있다고 판단되며, 각 사업장에 직접 투입된 외국인근로자의 성향분석과 그에 따른 개선방안을 도출하면 사고를 줄일 수 있을 것으로 생각된다.

  • PDF

거푸집공사의 재해 위험성 평가에 관한 연구

  • 오준호;고성석
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.05a
    • /
    • pp.109-114
    • /
    • 2002
  • 건설공사의 공종 중 거푸집공사는 전체공사기간의 대략 25%를 차지하고 있으며 공사비 비율은 일반적으로 전체공사비의 10~15%, 철근콘크리트공사비의 20~30%를 차지하고 있어 구조물의 안전성, 경제성 및 작업성과 품질관리에 중요한 역할을 한다. 또한 거푸집은 콘크리트가 양생되면 곧 해체되는 가설구조물로써 작업상에서 많은 위험요소를 포함하고 있으며 특히, 아파트공사의 경우 전체 재해발생의 17%로 가장 높은 비율을 차지하고 있다. 이와 같이 거푸집공사는 가장 우선적으로 관리하여야 할 위험공종이며 전체공기를 좌우하는 주공정으로서 이를 재해발생의 측면에서 제어하는 것이 안전관리에 있어서 가장 효율적이며 큰 효과를 나타낼 수 있는 것으로 생각된다.(중략)

  • PDF