• Title/Summary/Keyword: 자연 이자율

Search Result 4, Processing Time 0.016 seconds

Estimation the Natural Output Korea: A Bayesian DSGE Approach (한국의 자연 산출량 추정: 베이지안 DSGE 접근법)

  • Hwang, Youngjin
    • KDI Journal of Economic Policy
    • /
    • v.31 no.1
    • /
    • pp.1-25
    • /
    • 2009
  • This paper attempts to estimate the natural rates of output and interest of Korea in a simple DSGE set-up with a few stylized New Keynesian features using Bayesian methods. The major findings of this paper are as follows. First, the estimates of output gaps are less volatile than the measures from conventional approaches, although they exhibit non-negligible variations depending on the model specification. Another key finding is that the hybrid type Phillips curve with a backward-looking component and/or habit formation in consumption may play an important role in characterizing the macroeconomic dynamics of Korea.

  • PDF

Assessment of the Wetland Soil Development in Constructed Wetlands using the Soil Properties of a Reference Wetland (기준습지 토양특성을 활용한 인공습지의 토양발달 평가)

  • Lee, Ja-Yeon;Kang, Dae-Seok;Sung, Ki-June
    • Journal of Wetlands Research
    • /
    • v.12 no.1
    • /
    • pp.1-14
    • /
    • 2010
  • Changes in wetland soil properties of two constructed wetlands after their constructions were compared to those of a natural wetland to determine if they could be used for the evaluation of the success of constructed wetlands and the assessment of their functions. One natural wetland as a reference wetland and two constructed wetlands(treatment wetland and experimental wetland) with different contaminant inflow characteristics were selected for this study. Major physicochemical properties of wetland soil such as soil texture, water content, pH, CEC(cation exchange capacity), organic matter content, total nitrogen, and available phosphorus were monitored to investigate the effects of inundation and accumulation of organic matters and nutrients on the wetland soil development. There was a clear difference in soil texture between the natural wetland and the constructed ones, with the high sand content in the constructed wetlands as compared to the high clay content in the natural one. Gradual increases of silt and clay contents over time were observed in the constructed wetlands. The soil of the natural wetland was higher in water content and organic matter but lower in pH than those of the constructed wetlands. The pH of the constructed wetlands reached near neutral ranges after initial increase. CEC and nutrient concentrations of the constructed wetlands seemed to be affected mainly by outside inflows of organic matter and contaminants. Concentrations of organic matter and nutrients decreased over time in the experimental wetland where surface and deep soils with different characteristics were mixed during its construction, suggesting that changes in soil properties during wetland constructions may affect the development of wetland soils or wetland biogeochemistry. This study showed that changes in physicochemical properties of soils in constructed wetlands could be used to assess the success of constructed wetlands and their functions, and also the importance of reference wetlands for the appropriate assessment.

Effects of Kneipp therapy on HRV: the First Preliminary Validation in Forest Environment (크나이프 요법이 HRV에 미치는 효과: 산림 환경에서 적용한 최초의 예비적 검증)

  • Hong, Geum Na;Sin, Bang Sik;Song, Kyu Jin;Son, Jeong Heui;Kim, Hyun Suk;Choi, Min Joo
    • Journal of Naturopathy
    • /
    • v.11 no.1
    • /
    • pp.1-8
    • /
    • 2022
  • Background: A validation study is needed to make domestic applications of German Kneipp therapy. Purpose: The study aims to test the effect of a Kneipp therapeutic program in a domestic forest environment on the autonomic nervous system. Methods: The program was made considering the 4 key elements ('exercise', 'regulative therapy', 'nutrition', and 'phytotherapy') of the Kneipp therapy. Total 3 sessions (once a week for 5 hours in each session) were performed to 40 domestic adults divided into four groups (10 in each group). HRV was measured on the subjects before and after the intervention, and its 6 characteristic parameters (TP, VLF, LF, HF, LF/HF, CSI: Cumulative Stress Index) were compared for statistical analysis. Results: For 33 subjects excluding 7 who were disturbed by interrupt factors during measurements, significant improvements after the intervention, were observed in TP(8.64%, p < ..001), VLF(6.96%, p < .05), LF(15.86%, p < .001), HF(8.46%, p < .01), LF/HF(5.77%, p < .05) and CSI(-16.06%, p < ..001). Conclusions: The Kneipp therapy performed in the forest environment was shown to activate the autonomic nervous system and in particular the sympathetic and parasympatheric nervous to promote heart activity, and was also shown to most significantly reduce cumulative stress. The present observations would be the first preliminary evidence that the Kneipp therapeutic interventation in a domestic forest environment results in positive responses of the autonomic nervous system including stress relief.

Analysis of Fuel Marginal Price for Biomass Power Plant - On the Basis of China Biomass Power Plant - (바이오매스 발전소 연료한계단가 분석 - 중국 바이오매스 발전소를 중심으로 -)

  • Kim, Cheol;Sa, Jae-Hwan;Kim, YunSoung;Jeon, Eui-Chan
    • Journal of Climate Change Research
    • /
    • v.1 no.3
    • /
    • pp.219-226
    • /
    • 2010
  • This study is analyzed the financial feasibility of biomass power plant in China in terms of fuel marginal price of biomass power plant. The range of fuel price is 150~300 RMB and IRR(Internal Rate of Return), NPV(Net Present Value), DSCR(Debt Service Coverage Ratio) and operation time are analyzed by 10 RMB from 150 RMB. The sensitivity of IRR went down by 1.35 on average. The sensibility of NPV showed big difference by 20% on 260 RMB and 270 RMB. In addition, DSCR of loan is at 1.0 at raw cost of 242 RMB and at lower than 1.0 when the raw cost over 242 RMB. It means that the pay-off of principal and interest of the loan is expected to be difficult in that case. The operation time of power plant should be 88% against standard operation time to maintain over 1.0 of DSCR. Therefore, the factors affecting the cost of raw material to build the power plant and to operate it should be prioritized.