• Title/Summary/Keyword: 자연정화식 처리

Search Result 9, Processing Time 0.026 seconds

Environmental Pollution and Reclamation in the Abandoned Mines in Korea (국내 폐 광산 환경오염 실태 및 처리 현황)

  • Cheong Young-Wook;Min Jeong-Sik
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2001.09a
    • /
    • pp.75-89
    • /
    • 2001
  • There are 334 coal mines and about 900 metal mines abandoned. The environmental problems such as acid mine drainage from adits etc. and the subsidence has occurred in the abandoned mines. In addition, soil has been contaminated by tailings. According to analysis of mine drainages, some of them from adits in the abandoned coal and metallic mines were acidic and polluted by heavy metals. Especially, water quality of coal mine drainages were different by areas. Treatment of mine drainage by conventional chemical treatment has the drawback because the operating cost is very expensive. The treatment system used in mine drainage is the natural treatment system such as anoxic limestone drain in adits and the constructed wetland. The method of reclamation for abandoned waste rocks and tailings impoundments are mainly landfilling.

  • PDF

Characteristics of By-product Ochre from Acid Mine Drainage (AMD) Treatment and Its Potential Use (산성광산배수 (AMD) 처리 부산물 ochre의 특성과 활용)

  • Jeong, Jung-Hwan;Kim, Ho-Jin;Kim, Young-Nam;Nam, Kwang-Soo;Kim, Kye-Hoon
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.43 no.3
    • /
    • pp.304-314
    • /
    • 2010
  • This study was carried out to find out potential use of ochre as an agent to reduce phosphorus content in water. Ochre is a by-product from treatment of acid mine drainage (AMD) which is composed mostly of $Fe_2O_3$, $Fe_2O_3{\cdot}H_2O$, $FeO{\cdot}OH$ and $Fe(OH)_3$. Three ochre samples (ochre-H, ochre-D and ochre-S) were collected from three treatment facilities in Gangwon province. Physico-chemical characteristics of three ochre samples including pH, electrical conductivity, total phosphorus, available phosphorus, particle size distribution were analyzed. Scanning electron microscopy (SEM) energy dispersive spectroscopy (EDS), X-ray diffraction (XRD) and X-ray fluorescence (XRF) analysis were also carried out. In addition, experiments for phosphorus removal from water was performed. Calcium content of ochre-H was higher than that of ochre-D and ochre-S, whereas iron content of ochre-H was lower than that of ochre-D and ochre-S. All the phosphorus in water up to maximum 191,411 mg $kg^{-1}$ per unit mass of ochre was removed with ochre-H. Ochre has immense potential as an agent to reduce phosphorus content in water.

A Study on the Application of Manganese Oxidizing Bacteria for Manganese Treatment in Acid Mine Drainage (산성광산배수의 망간처리를 위한 MOB 적용에 관한 연구)

  • Lee, Kang Yu;Jang, Min;Park, In Gun;Um, Tae Young;Lim, Kyeong Ho
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.8
    • /
    • pp.564-570
    • /
    • 2013
  • Domestic treatment facilities for acid mine drainage (AMD) mostly used a passive treatment process. But some passive treatment facility discharged high manganese concentrations because it is required high pH (>9) for abiotic oxidation of Mn(II) to Mn(IV). This study was focused on the feasibility of biological manganese treatment using the manganese-oxidizing bacteria (Pseudomonas sp. MN5) from AMD and economical application method of it. To investigate the various conditions of water quality the most part of the experiments were based on batch test. And result of it showed that maximum manganese oxidation rate were $10.4mg/L{\cdot}h$ at the pH7. We also performed small column tests in which MOB were attached to the functional polyurethane (FPU) media containing alkaline chemicals. Manganese concentration decreased 42 mg/L to below 6 mg/L. But anaerobic condition formed by excessive bacterial respiration in column resulted in increasing effluent manganese concentration.

Parameter Estimation of the Aerated Wetland for the Performance of the Polluted Stream Treatment (오염하천 정화를 위한 호기성 인공습지의 운영인자 평가)

  • Kim, Dul-Sun;Lee, Dong-Keun
    • Clean Technology
    • /
    • v.25 no.4
    • /
    • pp.302-310
    • /
    • 2019
  • A constructed wetland with the aerobic tank and anaerobic/anoxic tank connected in series was employed in order to treat highly polluted stream water. The aerobic tank was maintained aerobic with a continuous supply of air through the natural air draft system. Five pilot plants having different residence times were employed together to obtain parameters for the best performances of the wetland. BOD and COD removals at the aerobic tank followed the first order kinetics. COD removal rate constants were slightly lower than BOD. The temperature dependence of COD (θ = 1.0079) and BOD (θ = 1.0083) was almost the same, but the temperature dependence (θN) of T-N removal was 1.0189. The SS removal rate was as high as 98% and the removal efficiency showed a tendency to increase with increasing hydraulic loading rate (Q/A). The main mechanism of BOD and COD removal at the anaerobic/anoxic tank was entirely different from that of the aerobic tank. BOD and COD were supplied as the carbon source for biological denitrification. T-P was believed to be removed though the cation exchange between orthophosphate and gravels within the anaerobic and anoxic tanks. The wetland could successfully be operated without being blocked by the filtered solid which subsequently decomposed at an extremely fast rate.

A Study of Fluoride Adsorption in Aqueous Solution Using Iron Sludge based Adsorbent at Mine Drainage Treatment Facility (광산배수 정화시설 철 슬러지 기반 흡착제를 활용한 수용액상 불소 흡착에 관한 연구)

  • Lee, Joon Hak;Kim, Sun Joon
    • Economic and Environmental Geology
    • /
    • v.54 no.6
    • /
    • pp.709-716
    • /
    • 2021
  • In this study, an adsorbent prepared by natural drying of iron hydroxide-based sludge collected from settling basin at a mine drainage treatment facility located in Gangneung, Gangwon-do was used to remove fluoride in an artificial fluoride solution and mine drainage, and the adsorption characteristics of the adsorbent were investigated. As a result of analyzing the chemical composition, mineralogical properties, and specific surface area of the adsorbent used in the experiment, iron oxide (Fe2O3) occupies 79.2 wt.% as the main constituent, and a peak related to calcite (CaCO3) in the crystal structure analysis was analyzed. It was also identified that an irregular surface and a specific surface area of 216.78 m2·g-1. In the indoor batch-type experiment, the effect of changes in reaction time, pH, initial fluoride concentration and temperature on the change in adsorption amount was analyzed. The adsorption of fluoride showed an adsorption amount of 3.85 mg·g-1 16 hours after the start of the reaction, and the increase rate of the adsorption amount gradually decreased. Also, as the pH increased, the amount of fluoride adsorption decreased, and in particular, the amount of fluoride adsorption decreased rapidly around pH 5.5, the point of zero charge at which the surface charge of the adsorbent changes. Meanwhile, the results of the isotherm adsorption experiment were applied to the Langmuir and Freundlich isotherm adsorption models to infer the fluoride adsorption mechanism of the used adsorbent. To understand the thermodynamic properties of the adsorbent using the Van't Hoff equation, thermodynamic constants 𝚫H° and 𝚫G° were calculated using the adsorption amount information obtained by increasing the temperature from 25℃ to 65℃ to determine the adsorption characteristics of the adsorbent. Finally, the adsorbent was applied to the mine drainage having a fluoride concentration of about 12.8 mg·L-1, and the fluoride removal rate was about 50%.

Removal Velocities of Pollutants under Different Wastewater Injection Methods in Constructed Wetlands for Treating Livestock Wastewater (인공습지 축산폐수처리장에서 주입방법에 따른 오염물질의 제거속도 평가)

  • Kim, Seong-Heon;Seo, Dong-Cheol;Park, Jong-Hwan;Lee, Choong-Heon;Lee, Seong-Tea;Jeong, Tae-Uk;Kim, Hong-Chul;Ha, Yeong-Rae;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.2
    • /
    • pp.272-279
    • /
    • 2012
  • In order to effectively treat livestock wastewater in constructed wetlands by natural purification method, removal velocities of pollutants under different injection methods in constructed wetlands were investigated. The removal velocities of chemical oxygen demand (COD), suspended solid (SS), T-N and T-P by continuous injection method were slightly rapid than those by intermittent injection method in full-scale livestock wastewater treatment plant. The removal velocity (K; $day^{-1}$) of COD by continuous injection method was $0.38\;d^{-1}$ for $1^{st}$ bed, $0.13\;d^{-1}$ for $2^{nd}$ bed, $0.17\;d^{-1}$ for $3^{rd}$ bed, $0.05\;d^{-1}$ for $4^{th}$ bed and $0.17\;d^{-1}$ for $5^{th}$ bed. The removal velocities (K; $day^{-1}$) of COD in $1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$ and $5^{th}$ beds by intermittent injection method were $0.210\;d^{-1}$, $0.086\;d^{-1}$, $0.222\;d^{-1}$, $0.053\;d^{-1}$ and $0.137\;d^{-1}$, respectively. The removal velocity (K; $day^{-1}$) of SS by continuous injection method was $0.750\;d^{-1}$ for $1^{st}$ bed, $0.108\;d^{-1}$ for $2^{nd}$ bed, $0.120\;d^{-1}$ for $3^{rd}$ bed, $0.086\;d^{-1}$ for $4^{th}$ bed and $0.292\;d^{-1}$ for $5^{th}$ bed. The removal velocities (K; $day^{-1}$) of SS in $1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$ and $5^{th}$ beds by intermittent injection method were $0.485\;d^{-1}$, $0.056\;d^{-1}$, $0.174\;d^{-1}$, $0.081\;d^{-1}$ and $0.227\;d^{-1}$, respectively. The removal velocity (K; $day^{-1}$) of T-N by continuous injection method was $0.361\;d^{-1}$ for $1^{st}$ bed, $0.121\;d^{-1}$ for $2^{nd}$ bed, $109\;d^{-1}$ for $3^{rd}$ bed, $0.047\;d^{-1}$ for $4^{th}$ bed and $0.155\;d^{-1}$ for $5^{th}$ bed. The removal velocities (K; $day^{-1}$) of T-N in $1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$ and $5^{th}$ beds by intermittent injection method were $0.235\;d^{-1}$, $0.071\;d^{-1}$, $0.171\;d^{-1}$, $0.058\;d^{-1}$ and $0.126\;d^{-1}$, respectively. The removal velocity (K; $day^{-1}$) of T-P by continuous injection method was $0.803\;d^{-1}$ for $1^{st}$ bed, $0.084\;d^{-1}$ for $2^{nd}$ bed, $0.076\;d^{-1}$ for $3^{rd}$ bed, $0.118\;d^{-1}$ for $4^{th}$ bed and $0.301\;d^{-1}$ for $5^{th}$ bed. The removal velocities (K; $day^{-1}$) of T-P in $1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$ and $5^{th}$ beds by intermittent injection method were $0.572\;d^{-1}$, $0.049\;d^{-1}$, $0.090\;d^{-1}$, $0.112\;d^{-1}$ and $0.222\;d^{-1}$, respectively.