• Title/Summary/Keyword: 입찰 배점 기준

Search Result 4, Processing Time 0.016 seconds

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.

A Study on the Product Qualification Criteria through Monte-Carlo Simulation and Association Rule Analysis (군수품 조달을 위한 물품적격심사기준의 조달특성 및 심사분야 배점의 적절성에 관한 연구)

  • Ahn, Namsu;Yeo, Yongheon
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.4
    • /
    • pp.65-72
    • /
    • 2020
  • The purpose of this study is to analyze the adequacy of product qualification criteria through Monte-Carlo simulation and association rule analysis. We first surveyed the similar procurement systems, then we simulated the bid situation that randomly generated several vendors participated in a bid, and they obtained the score according to the product qualification criteria's judgement area. Then, the company with the highest score will win the bid, and further analysis was performed in terms of performance indicator and satisfaction ratio. The results of this study can be summarized as follows; Although the items related to the credibility accounted for the largest number items, it did not affect the actual bid results. It was analyzed that it is desirable to increase the allocation points in the area of business status and technical capability review than the current one.

A Critical Review on Japan's Offshore Wind Bidding System (일본의 해상풍력 입찰제도에 관한 비판적 고찰)

  • Son Bumsuk
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.70-77
    • /
    • 2024
  • This study examines the issues regarding the selection competition process of offshore wind power operators conducted in Japan in 2020. It also explores the implications of the findings on the legal system of Korea for the introduction of offshore wind power in the future. Drawing on Japan's example, Korea must reconsider the importance of the price aspect when introducing offshore wind power and adopt policies that prioritize balanced industrial development and focus on regional and domestic economic ripple effects.

Improvement of Technical Proposal Tendering Evaluation Criteria for Small and Medium sized Construction Projects (중·소형 건설공사를 위한 기술제안입찰 평가기준 개선)

  • Yu, Jun-Hyeok;Hyun, Chang-Taek;Moon, Hyun-Seok;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.95-105
    • /
    • 2012
  • The government introduced the technical proposal drafting system in September 2007, as a new method to stimulate technical competence among construction companies to require ingenuity, creativity, artistic sense, and high-level technology. However, an examination of instances has shown that this system has been applied only to large scale constructions worth 30 billion won or more, and not to small and medium constructions worth less than 30 billion won. This is because the evaluation criteria of the system is structured in a manner that makes it difficult to apply to small and medium constructions. This study presented methods to improve the evaluation factors, categories, and scoring scheme of the technical proposal creation system for medium to small scale constructions to be able to further apply the current system to small and medium constructions. The technical proposal evaluation criteria presented in this study was significant in that it enabled the technical proposal creation system that was mainly used for large scale constructions to be further applied to medium to small scale constructions. And it also contributes to the establishment and settlement of a new technical proposal tendering for medium to small scale constructions.