• Title/Summary/Keyword: 입찰

Search Result 932, Processing Time 0.029 seconds

Positive Discrimination Policy in U.S. Construction Industry and Its Implications (미국 건설산업의 상대적 약자 배려 정책 고찰 및 시사점)

  • Chang, Chul-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.285-292
    • /
    • 2020
  • Despite the government's constant exertions on making a win-win environment through positive discrimination for small and medium-sized companies and local companies, they are suffering from order polarization, weak competitiveness to win a project, and low profitability in highly competitive market situations resulting from the contraction of the construction market. This study examined the U.S. policy and regulations on protecting the relatively weak entities in the construction industry, focused on a goaling program, setting aside the bid preference for small and middle-sized companies and local companies. From benchmarking, some implications were drawn to reconsider the goal of policy and regulations for small and medium-sized companies and local companies. In conclusion, unlike domestic positive discrimination regulations, which are based on the concept of market sharing that can allow a paper company to survive, those of the U.S. are based on the principle of fair competitiveness, and also provide a certain degree of advantage for small and medium-sized companies and local companies. Therefore, the domestic positive discrimination policy and regulations for small and medium-sized companies and local companies need to be reconsidered toward the direction of not only protecting them but also to strengthen their competitiveness in the market.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

Identifying Key Factors to Affect Bus Headway Deviation using Hierarchical Linear Model (Seoul Case Study) (HLM을 이용한 버스차두간격 편차에 미치는 요인분석 (서울시사례를 중심으로))

  • Lee, Ho-Sang;Kim, Do-Gyeong;Kim, Yeong-Chan;Hwang, Gyeong-Su
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.6
    • /
    • pp.119-127
    • /
    • 2009
  • It has been known that bus route and company related characteristics have influences on punctuality, but fewer research have been conducted. Independent variables used in this study were selected using correlation analysis, and OLS(Ordinary Least Square) and HLM(Hierarchical Linear Model) were employed to identify factors affecting bus punctuality(headway deviation). The results showed that ICC(intraclass Correlation Coefficient) is 0.10, indicating that hierarchical linear models are more adequate for these data because there is effective variation in the subjects between companies. Punctuality was found to be negatively associated with the number of vehicles, the number of persons per vehicle, and total travel time. On the other hand, average headway and company size have a positive relationship with punctuality. Therefore, the number of vehicles per route, average headway, and the number of vehicles managed by a company should be considered for more accurately evaluating the management of piunctuality.

Influencing Factors on the Duration of Offset Agreement (절충교역 계약 소요기간 영향요인)

  • Hong, Seok-Soo;Joung, Tae-Yun;Seo, Jae-Hyun;Hong, Moon-Hee
    • Journal of Technology Innovation
    • /
    • v.20 no.1
    • /
    • pp.1-15
    • /
    • 2012
  • Republic of Korea has been applying offset to defense acquisition program for some benefits such as modernization of defense industry and enhancement of R&D capabilities since 1983. But in point of implementation, there is the possibility of delay of offset agreements based on the value of proposed technologies. As it often happens that the delay of offset agreement negatively affects the time schedule of main defense deal, it is necessary to prepare for this issue. The purpose of this study is to extract some factors affecting the duration of offset agreement by statistical analysis. Reviewing existing papers and contract process, nationality of enterprise, the number of project participants, properties of project, the number of technologies in the first proposal, level of domestic defense technology in each weapons system, the amount of main contract were used as independent variable and duration of agreement as dependent variable. To hypothesis testing, correlation and multiple regression analysis were conducted using the previous 25 contract cases. As a result of correlation analysis, the amount of main contract, the number of technologies in the first proposal and properties of project have positive relationships with dependent variable. In multiple regression, the amount of main contract and the number of project participants have significant effect on the duration of offset agreement.

  • PDF

Estimation of Software Development Efforts and Schedule Based on A Ballpark Schedule Estimation Table (개략적 일정추정표 기반 소프트웨어 개발노력과 일정 추정)

  • Park, Young-Mok
    • Journal of Internet Computing and Services
    • /
    • v.8 no.4
    • /
    • pp.105-117
    • /
    • 2007
  • In order to succeed in a bid or development, the project manager should estimate its cost and schedule more accurately in the early stage of the project. Usually, the nominal schedule of most projects can be derived from rule of thumb, first-order estimation practice, or ball-park schedule estimation table. But the rule-of-thumb models for the nominal schedule estimation are so various, and the first-order estimation practice does not provide sufficient information. So they do not help much to decide on the proper development effort and schedule for a particular size of project. This paper presents a statistical regression model for deciding the development effort and schedule of a project using the ball-park schedule estimation table. First, we have redefined such words suggested in the ballpark schedule estimation table as shortest possible schedule, efficient schedule and nominal schedule, Next, we have investigated the relationship between the development effort and the schedule. Finally, we have suggested a model for estimating the development effort and the more accurate schedule of such particular sizes of software as are not presented in the ball-park schedule estimation table. The experimental results show that our proposed regression analysis model decreases the mean magnitude of relative error by 2% at maximum. Also this model can estimated the development effort and schedule for a particular size of software.

  • PDF

Study on Fairness Consolidation of Real Estate Auctions Secured for Bank NPLs (은행 부실채권(NPL) 담보부동산 경매의 공정성 강화방안 연구)

  • No, Han-Jang
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.11
    • /
    • pp.397-409
    • /
    • 2015
  • The Global Financial Crisis and introduction of International Financial Reporting Standards (IFRS) urged the banks to strengthen their asset qualities. The banks dispose their non performing loans(NPLs) consistently to maintain a sufficient BIS capital adequacy ratio. Accordingly, the interests in auctions, as a disposal method, of real estates that secured for NPLs are on the increasing. This study suggest an alternative for fairness consolidation of real estate auctions which secured for NPLs. First, the impartial entry barriers for NPL sales markets need to be eliminated for fair bidding competition in auctions for real estate that secured for NPLs. In addition, the portion of NPL disposal by real estate auctions need to be expanded. Second, the asymmetry of trade information in the retail markets of NPLs and the abuse of offset by NPL owners' also should be restricted. The Fairness improvement of NPL trading process and real estate auction process that secured for them would of great use in the protection of bidders. Futhermore, it would also contribute to the revitalization of real estate auction markets and the resolution of NPLs of banks through fair disposal of distressed assets.

Time Series Analysis and Forecast for Labor Cost of Actual Cost Data (시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구)

  • Lee, Hyun-Seok;Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.24-34
    • /
    • 2013
  • Since 2004, the government decided to gradually introduce Actual Cost Data into cost estimate for improving problems of below-cost tendering and to reflect fair market price through competition and carry contract efficiently. However, there are many concerns that Actual Cost Data has not reflected real market price, even that has contributed to reduce the government's budget. General construction firm's burden for labor cost is imputed to specialty contractors and eventually it becomes construction worker's burden. Therefore, realization of Actual Cost Data is very important factor to settle this system. To understand realization level and make short term forecast, this paper drew construction group of which labor cost constitutes more than 95% of direct cost, and compares their Actual Cost Data with relevant skilled workers's unit wage and predicts using time series analysis. The bid price which is not be reflected market price accelerates work environment changes and leads to directly affect such as late disbursement of wages, bankruptcy to workers. Therefore this paper is expected to be used to the preliminary data for solving the problem and establishing improvement of Actual Cost Data.

Behavior in Agricultural Markets under Environmental Uncertainty : A Theoretical Approach Based on von Thunen`s Framework (불확실한 환경조건에서 농업시장의 행동 : 튀넨 모델을 배경으로한 이론적 접근)

  • Lee, Sang-Yool;Mulligan, Gordon F.
    • Journal of the Korean Geographical Society
    • /
    • v.31 no.4
    • /
    • pp.648-661
    • /
    • 1996
  • The traditional von Thunen model has various shortcomings. Perhaps the greatest dificiency is the model's sole emphasis on the production side of the economy;that is, the agricultural markets are rarely closed for demand. In thes paoer a closed model for a three-activity, two-dimensional economy is developed. Equillibrium solutions are generated for prices, land areas, and outputs. Comparative static analysis then follows. Attention is next given to a maximum expected-return model under environmental uncertainty. Land uses for the traditional model and the closed model are then compared.

  • PDF

Standardization of the Lease Fee Assessment System of Busan Port Container Terminals (부산항 컨테이너부두 임대료 산정체계 표준화 방안)

  • Kil, Kwang-Soo
    • Journal of Korea Port Economic Association
    • /
    • v.27 no.3
    • /
    • pp.65-90
    • /
    • 2011
  • Private stevedoring companies are leasing and operating the container terminals of the Busan Port. The total amount of lease fees private stevedoring companies paid in 2010 reached 161 billion wons, an approximately 66 percent of the total revenue of the Busan Port Authority(BPA). In other words, lease fees are the most important revenue source for BPA. However, the lease fee assessment system of Busan container terminals goes against the principle of equity due to different assessment methods and criteria adopted by each container terminal. Therefore, the purpose of the study is to analyze the systematic problems of the lease fee assessment system that is used at Busan container terminals, and propose a new standardized scheme with a case study on the new system. In order to standardize the assessment system, the assessment methods need to be simplified by using the Discounted Cash Flow(DCF) method. In addition, the assessment criteria such as assessment duration, discount rates, price indexes, estimated container throughputs, sales unit price per TEU, operation costs, including labor costs, need to be standardized as well. The new standardized assessment system can be applied to estimate lease fees for new terminals. However, for existing terminals to run the new system, factors such as assessment duration, discount rates, price indexes, estimated container throughputs, investment and re-investment costs, and maintenance & repair costs of the new system should be changed slightly.

A Modeling of Web-service for Construction CALS/EC Standard Guideline by using Component Based Development (컴포넌트 기반 개발방법론에 의한 건설 CALS/EC 표준지침 웹서비스의 모델링)

  • 이상호;정용환;김소운
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.78-83
    • /
    • 2003
  • 본 연구에서는 건설CALS/EC 기반의 정보화 추진을 위한 정보시스템을 개발할 때 적용되는 기존의 소프트웨어 개발방법론의 문제점을 분석하고, 표준화되지 않은 개발방법론의 적용으로 시스템 개발에 비효율적인 비용을 투자하는 문제점과 특성상 입찰, 구매, 계약 등 분야별로 상이한 기능의 업무에 따라 구축되는 건설산업 정보화에 있어서 상호간에 데이터 및 프로세스를 원활히 통합하지 못하므로 인하여 발생되는 개발의 중복성, 정보 활용의 비효율성 등의 문제점을 개선하고자 하였다. 이를 위하여 최근 새로이 부각되고 있는 방법론인 컴포넌트 기반 개발방법론(CBD: Component-Based Development)을 사용하여 건선CALS/EC 표준지침 웹서비스를 위한 시스템의 업무프로세스를 모델링하여 사용자가 쉽게 재사용가능하고 타업무분야에 확대 가능한 방향을 제시하였다. 본 연구를 위하여 기존의 소프트웨어 개발 방법론의 적용상 문제점 분석을 통하여 컴포넌트 기반 개발방법론의 필요성을 증명하고 비즈니스 컴포넌트 프레임워크를 사용하여 건설 CALS/EC 표준지침 웹서비스의 업무프로세스에 적용할 기술적인 방법론을 고찰하고 업무에 효과적으로 적용할 수 있는 업무프로세스 컴포넌트를 제시하였다. 본 연구에서 도출된 컴포넌트 모델은 향후 타업무분야의 시스템을 개발할 때 사용자요구분석 단계부터 별도의 재 작업이 없이 사용될 수 있으며 시스템을 구현할 때 개발 모듈의 중복방지와 용이한 비즈니스로직의 변경 등이 가능하며, 추가의 업무 프로세스나 연관된 다른 분야의 업무프로세스의 반영 및 추가 시 컴포넌트의 활동모델을 쉽게 수정하여 정의함으로써 쉽게 시스템의 기능을 확장할 수 있다.LE 산정에 관한 지속적인 실험적 연구가 이루어져야 하겠다. 증가할 것이다. 또한 부분육을 이용한 완전제품, 적색육제품, 유기농이나 별미식 제품과 같은 형태의 다양한 포장육 제품이 도입 될 것으로 생각되어진다.e in vitro SPF test method will be able to be used as an alternative method for in vivo SPF in case of lotion and cream. replica. A statistically significant improvement of Star Fruit Leaf Extract BG30-treated site was seen in decreased wrinkles. Star Fruit Leaf Extract BG30 results in clinically visible improvement in wrinkling when used topically for 5 weeks. 또한 관계마케팅, CRM 등의 이론적 배경이 되고 있는 신뢰와 결속의 중요성이 재확인하는 결과도 의의라고 할 수 있다. 그리고 신뢰는 양사 간의 상호관계에서 조성될 수 있는 특성을 가진 반면, 결속은 계약관계 초기단계에서 성문화하고 규정화 할 수 있는 변수의 성격이 강하다고 할 수가 있다. 본 연구는 복잡한 기업간 관계를 지나치게 협력적 측면에서만 규명했기 때문에 많은 측면을 간과할 가능성이 있다. 또한 방법론적으로 일방향의 시각만을 고려했고, 횡단적 조사를 통하고 국내의 한 서비스제공업체와 관련이 있는 컨텐츠 공급파트너만의 시각을 검증했기 때문에 해석에서 유의할 필요가 있다. 또한 타당성확보 노력을 기하였지만 측정도구

  • PDF