• Title/Summary/Keyword: 입찰과정

Search Result 84, Processing Time 0.023 seconds

Effects of the Methods for Generating and Selecting Multiple Preliminary Prices on Budget Prices in Bidding Processes (복수예비가격 생성 및 추첨방법이 예정가격에 미치는 영향)

  • Kang, Minseok;Riew, Moon Charn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.89-97
    • /
    • 2015
  • In bidding processes conducted by government agencies, local governments or public agencies, budget prices are critical to both ordering bodies and bidders since budget prices are bases for selecting a successful bidder. Since a high budget price goes against ordering bodies and a low one goes against bidders, most ordering bodies adopt a system using multiple preliminary prices for determining a budget price to ensure fair and transparent manners. Discussed are how budget prices change depending on the methods of sampling 15 preliminary prices and the methods of sampling 4 out of 15 prices. Computer simulation is conducted to analyze budget prices for various methods to determine multiple preliminary prices. It is more likely for budget prices to be close to base prices when splitting a range of generating preliminary prices into 15 intervals and taking 4 preliminary prices from 15 intervals than when taking 4 preliminary prices from a whole range. In cases when splitting a range of generating preliminary prices, if we take 2 preliminary prices out of intervals above 100% and take 2 out of intervals below 100%, the expected budget prices are equal to a base price and the standard deviations are about half in comparison with those when taking 4 out of 15 intervals.

Digital-hospital Research on the Factors that Lead to the Success of the Overseas-hospital Export Business through an Analysis of the Bidding Documents (해외병원 입찰분석을 통한 디지털병원 수출사업 성공요인)

  • Cha, Maengkyu;Kim, Jung Ok;Yu, Kiyun
    • KIISE Transactions on Computing Practices
    • /
    • v.23 no.6
    • /
    • pp.359-370
    • /
    • 2017
  • In overseas-hospital construction, the digital hospital is a trend that is based on the developments of the information and communication technologies, state-of-the-art medical equipment, smart health, and telemedicine. Along with the increasing proportion of IT, this has resulted in the spreading of the concept throughout city-like hospitals and their transformation into digital hospitals. In the hospital-construction business, IT is a key element that will link the modernization of the mechanical, electrical, and equipment systems, construction, and medical equipment for efficiency maximization through integration. The purpose of this study is the analysis of the market-expansion success factors through the construction of a success-story-based, IT-driven overseas-hospital business. The digital-hospital concept and the development process are analyzed through a literature review, and the success factors are analyzed in terms of the cost, time, and quality that are proposed in the project-management body of knowledge. The main contributions of this study regarding the success factors are as follows: First, a cost-side need exists regarding the establishment of strategic-value engineering in terms of increasing the value from the perspectives of the IT and operational infrastructures; second, in terms of the construction time, all of the hospital systems must comply with the established deadlines for the integrated test and commissioning; and lastly, in terms of quality, it is important to ensure that the System Integration digital-hospital services are delivered according to the user requirements.

우리나라 최초공모주(最初公募株)의 과도한 저가발행(低價發行)에 대한 원인분석과 개선방향

  • Jeong, Seong-Chang
    • The Korean Journal of Financial Management
    • /
    • v.9 no.2
    • /
    • pp.149-168
    • /
    • 1992
  • 본 연구의 목적은 우리나라에서 발행가격 결정을 발행회사와 주간사회사에게 완전 자율화 하였음에도 불구하고 우리나라의 최초공모주(最初公募株)는 왜 이처럼 과도하게 저가발행(低價發行)되고 있는가에 대하여 원인을 규명하고 그에 따른 해결책을 제시하고자 함에 있다. 발행가격결정 자율화 기간동안의 자료를 이용하여 실증적 분석을 한 결과, 우리나라의 저평가는 미국보다 통계적으로 유의하게 큰 것으로 확인되었다. 이러한 이유를 규명하기 위하여 이론적 모형을 제시하고, 우리나라와 미국을 중심으로한 다른 국가들의 발행가격 결정과정에 대한 제도적인 차이점을 검토하였다. 이론적 모형에서는 발행기업과 주간사회사가 수요의 크기를 예측하여 수요의 불확실성 정도가 낮으면 저평가의 크기가 적어진다는 것을 보였다. 제도적인 차이점들을 검토해 본 결과, 우리나라의 발행가격결정이 일반투자자들의 수요를 전혀 고려하지 않는 공급자의 사전가격결정방식을 택하고 있음에 반해, 미국에서는 발행가격대를 표기한 예비사업설명서와 로드쇼우(Road Show) 둥을 통해 투자자들의 수요예측을 하고 있으며 일본이나 프랑스는 발행주식의 일부를 경쟁 입찰에 부침으로써 투자자들이 발행가격결정에 참여하여 발행가격결정의 합리성을 유지하고 있다. 따라서, 우리나라의 저평가의 크기가 다른 국가들에 비하여 큰 이유는 우리나라의 공모주 발행가격 결정과정에서 투자자의 수요를 전혀 고려하지 않기 때문일 수 있으며, 이러한 저평가의 크기를 줄이기 위해서는 어떠한 형태로든지 발행가격 결정과정에 실수요자인 일반투자자가 참여하는 방식이 채택되어야 한다.

  • PDF

A Study on Acquisition Processes in Public Libraries (공공도서관 도서구입 실태에 관한 조사연구)

  • Chang, Durk-Hyun
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.45 no.3
    • /
    • pp.345-364
    • /
    • 2011
  • This paper strives to examine the acquisition process in public libraries. It specifically attempts to survey the budget allocation, duties and organizational structures of acquisition departments in public libraries, and the overall process of book selection and acquisition. Data was drawn from a survey of 545 public libraries in the country. Specific statistics were gathered through literature and interviews to be analyzed, even though they were not very detailed in nature. In looking at the actual acquisition process, a thorough comparison on the backgrounds, outlines and characteristics of current projects and an analysis on the specifics of each project was also conducted.

A Design and Implementation of Bidding and Scheduling System for Ship Repair (선박수리를 위한 입찰 및 일정관리 시스템의 설계 및 구현)

  • Kang, Hyo-woon;Kim, Jindeog
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.7
    • /
    • pp.1585-1592
    • /
    • 2015
  • Currently, the existing schedule management of ship repair has depended on hand-written notes of engineering manager in the repair ship yard. Simple management based on the hand-written notes is inefficient because current states of equipments and staff are not graspable in real-time. To solve this problem, the ICT based scheduling method is required in ship repair industry. In this paper, we propose a system based on ICT which manages schedules for repairing ships. The proposed system solves the problem occurred by the management to use the hand-written notes. Because the system has a function to report the current state of ship repair, it is able to cope with various problems, such as delay, wrong repair and so on. Moreover, the system is able to maximize the efficiency of ship repair process due to efficient management to staff and equipment.

Development of Fairness Evaluation Index for the Construction Industry (건설산업의 공정성 평가지수 개발)

  • Lee, Chijoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.16-27
    • /
    • 2022
  • This study analyzed both the legal system regarding fair trade and the types of unfair trade in the construction industry. Then, it derived the factors with which to evaluate the level of fairness. These factors were classified by each type of participant in the construction industry, such as general contractors and subcontractors, and each construction stage, such as bidding, contracting, and construction. The perceived fairness level of factors was analyzed using a survey of 238 employees of general contractors and subcontractors. Next, the study developed a fairness index for the construction industry. The index showed that subcontractors perceived the level of fairness more negatively than general contractors, but both perceived the construction stage of the industry as having the lowest level of fairness. General contractors perceived the bidding and contracting stages as having the highest fairness levels, and subcontractors perceived the contracting stage as having the highest level of fairness. The developed fairness index identified the evaluation factors that need improvement and the fairness level perceived by each type of participant at each stage of construction. The results of this study can contribute to establishing measures that improve the level of fairness in the construction industry.

A Comparative Analysis on Safety Evaluation System in the PQ Process of Public Construction Projects - Focus on PQ process in Korea and Los Angeles, California, USA - (공공공사의 PQ 심사 시 안전평가체계 비교분석 - 한국과 미국 캘리포니아 주 LA지역의 PQ 제도를 중심으로 -)

  • Park, Heetaek;Oh, ChiDon;Park, Chansik;Choi, Jinwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.3-13
    • /
    • 2013
  • The converted accident rates that included in Pre-Qualification (PQ) are to evaluate the results of accidents which have occurred. Therefore, it is demanded the development of proactive evaluation contents to evaluate the safety management activities and efforts on construction companies. The purpose of this study is to provide basic data for the establishment of proactive evaluation contents at public construction project in Korea through the collected and analyzed the PQ documentation applied by public agencies in Los Angeles, USA. The results indicated that diverse reactive safety evaluations are implemented to examine accidents which occurred in past projects such as occupational health insurance, regulation violation. And also, when the accidents occurred, it is evaluated the proactive safety management actions such as safety education, accident prevention programs, and safety management plans are reflected on the evaluation. Thus, if proactive safety related evaluation contents are established and reflected in PQ examinations together with diverse existing reactive safety evaluations considering converted accident rates, not only the existing function of converted accident rates can be reinforced but also businesses' active safety management activities can be induced and decreases in the construction industry's accident rate can be expected.

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

A design and implementation of a case-based system for successful bids (사례베이스 기반 적정낙찰가 추천 시스템의 설계 및 구현)

  • 양승진;권기항;왕성현;곽종섭
    • Proceedings of the Korea Multimedia Society Conference
    • /
    • 2002.11b
    • /
    • pp.303-306
    • /
    • 2002
  • 정보통신 기술의 비약적인 발전과 인터넷 이용의 증가로 인하여 전자 상거래 (Electronic Commerce), 그 중에서도 인터넷 경매에 대한 일반인의 관심과 참여가 높아지고 있다. 전통적인 경매에서 시공간의 제약으로 인한 문제점들을 인터넷 경매에서는 누구나 쉽게 경매에 참여하여 경쟁할 수 있도록 개선시켰다. 인터넷 경매에서 구매자가 원하는 상품을 구입하기 위해서는 구입물품의 가격정보, 상품정보 등이 필요하며 이러한 정보를 수집하는데는 많은 시간과 반복된 작업이 필요하다. 따라서 이러한 문제점을 해결하기 위해서 본 논문에서는 구매상품에 대한 상품정보와 적정 낙찰가를 제공하여 구매자가 입찰액을 정하는데 있어서 참고자료로서 활용할 수 있으며 부적당한 가격에 상품을 구매하거나 경매가 유찰되는 것을 피할 수 있어서 보다 효율적인 경매를 할 수 있도록 도와준다. 본 논문은 기존의 단순한 가격 정책에서 벗어나 사례베이스를 활용하여 실시간 상품의 특성에 따라 다양하게 적정낙찰가를 제시하는 적정낙찰가 추천 시스템을 설계하였으며, 몇 가지 사례를 구현을 통해 적정낙찰가를 제시하는 과정을 보여준다.

  • PDF

Development of an Analytic Hierarchy Process Model for the Bidder Selection of a Large Construction Project (대형공사의 최적입찰자 선정을 위한 계층분석과정(AHP) 모형의 개발)

  • 정병호;조권익
    • Korean Management Science Review
    • /
    • v.16 no.1
    • /
    • pp.75-85
    • /
    • 1999
  • In recent, an unfaithful construction bring about many social problems. The bidding process considering bidding price firstly is one of the reasons raising an unfaithfull construction work. Thus, we should consider many other criteria including bidding price in the bidder selection process. This paper suggests an analytic hierarchy process(AHP) model for selecting the best bidder of a large construction project. A questionnaire was used to obtain domain experts' opinion about criteria to be considered in the bidding process. A hierarchical structure of the AHP model is formed using criteria obtained in the survey. The model consists of bidding price, construction capability, financial status, faith, and their 17 sub-attributes. The relative importance of bidders are judged by pairwise comparison or absolute measurement. An illustrative example is given to show the process selecting the best bidder using the suggested AHP model.

  • PDF