• 제목/요약/키워드: 임성

검색결과 334건 처리시간 0.022초

상시개방점 양단전압 측정값을 이용한 배전선로 루프운전 가능 여부 판단 방법 (Loop Current Calculation based on Voltage Angle Difference at Tie Switch for Switching Plan Validation in Distribution System Operation)

  • 손주환;임성일
    • 조명전기설비학회논문지
    • /
    • 제29권7호
    • /
    • pp.14-21
    • /
    • 2015
  • Distribution systems are operated in radial structure, but temporal loop structure could be founded the live load transfer. Main purposes of reconfiguration of distribution network are load balancing, loss minimization and voltage drop maintaining. In the loop structure, huge loop current can be flowed between two substations in case of large voltage angle difference. Protection devices of distribution line can be triped by this huge loop current. So, precise calculation of loop current is very important for secure switching. This paper proposes a novel calculation method of loop current using the voltage angle differences measured at the tie switches. Feasibility of the propose method has been verified by various case studies based on Matlab simulation.

배전 실증시험장에서의 배전자동화 실증시험 결과 (The result on field test of distribution automation in distribution test center)

  • 하복남;윤태상;정영호;조남훈;임성일;강문호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.182-184
    • /
    • 2000
  • There are several facilities in Kochang distribution test center such as artificial fault generator(AFG), new distribution automation system(NDAS), communication networks (wireless and optic), lumped constant circuit, switches for distribution automation, overhead and underground distribution line. We have been field testing on remote control, data acquisition. remote metering, feeder automation and so on for distribution automation using those equipment.

  • PDF

IEC 61850기반 변전소 자동화 시스템에서 IED의 결함 극복 방법 (Fault Tolerant of IED in IEC61850 based Substation Automation System)

  • 이동욱;진용우;이덕수;임성일;이승재
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.152-154
    • /
    • 2005
  • This paper proposes new methods which are used for trouble detecting and tolerance of IED in IEC61850 based Substation Automation System. There are three point devices for construction of this system: Trouble Detection IED, Backup IED and Engineering Unit. Trouble Detection IED tests trouble of Bay IED and sends the result to Engineering Unit. And then Engineering Unit is able to control the system. When fault occurs in Bay IED, Backup IED will be substitute the troubled Bay IED. If this proposed scheme can be used in this system, the reliability of the Power System would be greatly improved.

  • PDF

IEC61850기반 변전소 자동화 시스템의 신뢰도 향상 방안 (Reliability Enhancement Scheme of IEC61850 Substation Automation System)

  • 이동욱;진용우;임성일;이승재
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.70-72
    • /
    • 2005
  • 변전소 내 IED의 신뢰도는 전력계통 운용과 보호에 매우 중요한 주제가 되었다. 또한, 서로 다른 회사에서 제작된 다른 기술을 이용한 IED들을 사용할 경우 신뢰도 유지에 힘든 것이 사실이다. 이를 해결하기 위하여 변전소 자동화의 구조 및 충신을 정의한 IEC61850이 제안되었다. 본 논문에서는 IEC61850기반의 변전소 자동화 시스템을 위한 새로운 신뢰도 향상 기법에 대해 제안한다 제안하는 방법은 패턴 검사를 통해 IED의 고장을 검출하고, 백업 IED와 소프트웨어 이동을 이용하여 결함을 극복하는 것이다.

  • PDF

메주 유래의 Syncephalastrum racemosum PDA 132-2가 생산하는 Protease의 정제 및 특성 (Purification and Characteristics of Protease Produced by Syncephalastrum racemosum PDA 132-2 from Korean Traditional Meju)

  • 유진영;임성일
    • 한국식품영양과학회지
    • /
    • 제28권5호
    • /
    • pp.1010-1016
    • /
    • 1999
  • Protease related mold was isolated and selected as a starter culture for commercial production of meju. Isolated microorganism was identified as Syncephalastrum racemosum PDA 132 2. To obtain basic data about protease for production of soybean peptides and application of the strain in meju fermentation, we extrated and purified protease and charateristics of the enzyme were investigated. The optimum condition for the production of enzyme was pH 4.0, 30oC, 5 days. The protease was purified 19.7 folds by gel filtration and ion exchange chromatography and specific activity was 12.4unit/mg. The purified enzyme was 34kDa in size, thiol protease(100% inhibited by PCMB), and was acidic protease(stable between pH 2.0~5.0). Vmax of the enzyme was 2.14 g/min which was lower(1/50) than that of by Asp. wentti and B. subtilis.

  • PDF

비접지 배전 계통에서 지락사고 시 고장구간 분리 및 복구를 위한 새로운 알고리즘 (A New Algorithm of The Line to Ground Fault Section Isolation & Restoration in Ungrounded Distribution Power System)

  • 최인선;최면송;임성일;이승재
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권10호
    • /
    • pp.550-555
    • /
    • 2004
  • Fault section isolation and service restoration are very important for function of DAS. In Japan, a progressive protection method is used for the line to ground fault section isolation and service restoration. But the progressive protection method has a drawback that the customer will experience outage time and that the rate in use of the feeder is not over 50%. This paper presents a new Service Restoration Algorithm which is for the line to ground fault section isolation and service restoration method for a ungrounded distribution system. If the proposed algorithm is used, the rate in use of the feeder can improve than before because a distribution system can change multi connection of feeder and the customer's outage time can be reduced. The proposed algorithm has been successfully tested in a distribution system.

보호계전기를 이용한 전기 품질 감시 기법 연구 (Power Quality Monitoring Algorithm Using the Protective Relay)

  • 최인선;이강석;최면송;임성일;이승재
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권11호
    • /
    • pp.581-588
    • /
    • 2004
  • Power qualify monitoring system is devoted to more concern than before, because the innovation of industrial technology needs more accurate instruments and more advanced power quality. This paper was studied on using data of the protective relay by Power Quality Monitor. This paper was proposed the wave storage condition and monitoring clauses of the protective relay as a power quality monitoring device. The protective relay will have problem to save data for PQM analysis because the protective relay memory is limited. Therefore this paper was proposed new a data compression of data got from the protective relay. This method is wave compression comparison algorithm using the DFT. The compression rate is higher than any other established method. This method can be real time storage. This algorithm is verified using the comparison among other compression rate and proved by Real Time Digital Simulator (RTDS).

배전자동화 적용선로 보호기기 자동정정 프로그램 개발 (The Development Plan of the Protection Device Auto-coordination Program in the Distribution Automation System)

  • 강문호;하복남;임성일;조남훈;이흥호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.129-131
    • /
    • 2001
  • In order to improve the reliability of power service and the effective management of distribution power system. DAS (Distribution Automation system) is widely used in KEPCO(Korea Electric Power Corporation) branch offices. Based on the present protective device coordination program which used in KEPCO. this study presents the new concept about both protective device coordination program maximizing the characteristics of DAS and development plan of protective device auto-coordination program with the merits of DAS.

  • PDF

지중 배전선로의 보호협조 개선방안 (The plan for fault coordination improvement of underground distribution line)

  • 하복남;윤태상;임성일;강문호;정창수;이흥호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.132-135
    • /
    • 2001
  • To improve the fault coordination of underground distribution line we study the several contents such as the magnitude of fault current in distribution line tripping time of CB by acting of over current relay with instantaneous trip and time delay trip. We also examine the melting time of current limiting fuse inside power fuse Through the research as above. we suggest the modification scheme of fault coordination to reduce the interruption times of power failure.

  • PDF

대규모 배전자동화 시스템의 응용프로그램 개발 방향 (The development plan of application program of large scaled distribution automation system)

  • 하복남;윤태상;임성일;강문호;조남훈;이흥호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 추계학술대회 논문집 학회본부 A
    • /
    • pp.73-75
    • /
    • 2000
  • The new distribution automation system was developed in KEPCO just recently. This system has many functions for remote control and data acquisition but it has not all functions for the full automated distribution system. This paper presents the contents of many kinds of additional application programs on the stage of developing and coming to the final completion for the large scaled distribution automation system.

  • PDF