Korean Journal of Computational Design and Engineering
/
v.21
no.3
/
pp.242-251
/
2016
Around the world, BIM application has been mandated. In Korea, an announcement was made in 2016 that BIM application will be required for all public constructions ordered by the Public Procurement Service. However, BIM cannot be used for building permits as Seumter, a building permit system, doesn't support BIM, even if it was used for building design. To utilize BIM for permit application, this study introduces a method of management for BIM-used permit application information. It was done by analyzing the data entered for new building permit application in Seumter. For the analysis, the permit application information is classified as internal BIM information and external BIM information and the required information is defined. To easily create and utilize the data types at the design stage, this study introduces a method of creating and utilizing a permit template. Also, this study developed a tool for combining the area information to add up all the related information such as gross floor area and floor area ratio. This study is significant in that it analyzes the required information for new building permit application among all the permit application types in Korea.
Korean Journal of Computational Design and Engineering
/
v.20
no.1
/
pp.1-10
/
2015
Using BIM (Building Information Modeling)-based design information to analyze various engineering processes has been widely adopted in construction projects. However, since typical building permit processes often require traditional 2D-based design information for submission and to obtain building approval, there are some challenges in delivering such data thru BIM-based design information. This paper proposed a methodology to generate and meet information requirements for permit applications and approvals based on BIM-based design information. To that end, we analyzed the required information necessary to make submissions for building approvals using the Seumter system. We then suggested a process to collect the required information from BIM-based data, and classified this into two types: BIM-internal and BIM-external information requirements. In addition, we proposed three algorithms to extract and to match between extracted BIM data and BIM-internal information requirements using IFC(Industry Foundation Classes). The proposed methodology enables to ensure the efficiency and the accuracy when providing data for building permit review and approval.
Kim, Jin-Uk;Kim, Young-Jin;Ok, Hyun;Yang, Sung-Hoon
Proceedings of the Korean Society of Computer Information Conference
/
2015.07a
/
pp.301-303
/
2015
국내 건설행정 투명화 및 경쟁력 향상 목적으로 개발된 건설사업정보시스템에 정부와 운영주체는 다양한 기능개선 방안과 관련 연구를 수행하며 시스템 성능을 개선시켜왔다. 그러나 기 추진된 성능향상 방안이 공공업무 처리에 중점 되어 대국민 사용자를 위한 콘텐츠 및 기능 등의 서비스가 미흡한 상황이다. 이에 본 논문에서는 건설사업정보 건설인허가시스템의 도로점용장소별 허가현황 기능을 중심으로 빅 데이터를 이용한 허가현황 정보 제공 방안을 제안하였다. 제안한 기능개선 방안은 기 구축된 비정형 데이터를 빅 데이터 기반으로 재분석하여 구글 맵에 가시화함으로써 공공업무 데이터 처리 뿐만 아니라 대국민 서비스를 위한 콘텐츠 제공이 가능하도록 하였다. 뿐만 아니라 그동안 축적된 15TB이상의 건설관련 데이터의 재활용 가능성을 시사함으로써 시스템 활용성 증대 및 개편 방향에 도움이 될 것으로 판단된다.
원자력 발전소 및 동위원소 사용기관에서 발생되는 가연성 고체 폐기물 및 유기폐액의 소각기술의 활용에 있어서 이의 안전성 확보를 위한 기술적 기준의 설정을 위한 고려인자들을 조사하였다. 국내외의 소각기술 활용현황을 알아보았고 본 기술의 국내 도입시 필요한 기술적 안전지침에 관한 외국의 사례를 조사하고 국내 관련 규정도 검토, 비교, 분석하여 주요 고려항목을 도출하였다. 안전성 확보를 위한 고려 항목을 크게 일반산업시설 적용항목, 원자력시설 상 안전조건, 소각시설의 기술적 요구사항, 기타 제반사항으로 나누어 제시할 수 있었다. 이들 내용은 기존 원자력 및 환경시설에 적용되는 안전성분석보고서 및 환경영향평가서로 작성될 수 있다고 보았으며 시설의 개요, 시설의 기술적 사항과 이에 따르는 안전을 위한 조건, 폐기물의 인수조건 등이 포함되며 기존 관련 법규의 적용 및 확인이 필요하였다. 기술적 사항에는 공정의 제염계수, 연소효율, 소각재의 형상, 배기가스의 방출농도, 작업자 및 인근주민의 피폭등이 확인되어야 하며 소각재의 처리방법 및 조건이 제시되어야 하고 소각재의 침출특성 등이 주요한 인자라고 보았다. 아울러 소각대상폐기물의 인수조건이 명시되어 소각성능에 따른 이의 안전성이 입증되어야 한다. 따라서 인허가 후 건설된 시설에서의 사용전 시험소각절차의 제시 및 이에 대한 관련 규제기관의 검사제도가 있어야 하며 품질보증절차 역시 관련지침에 따라 실시되어야 한다. 이와 같은 내용을 포함하는 안전기술지침의 설정이 절대적으로 필요하며 본 연구조사 결과의 활용이 기대된다.
The Journal of the Korea institute of electronic communication sciences
/
v.14
no.4
/
pp.693-700
/
2019
This paper studies on the optimum design space of solar power plant, application of efficiency improvement facility using various examples, lack of power cost, lack of land development and difficulty of permission. We analyze economic factors and profitability by deriving analysis factors according to the conditions of construction examples and variables by applying efficient facilities that can utilize idle space of individuals and public more efficiently through various cases.
Journal of the Architectural Institute of Korea Planning & Design
/
v.35
no.8
/
pp.111-122
/
2019
The purpose of this study was to understand the timing of Gentrification by the study through the analysis of licensing data for food service businesses under the correlation with regional policies and systems. In addition, by analyzing the change in location patterns of the food service business in the district unit plan zones, the cause, development patterns and regional differences were identified. Starting with the Seoul hanok declaration in 2008, the approval of the food service business began to increase, and the floating population increased with the restoration of the Suseong Valley in 2012, and the concentration of food service business increased significantly on the waterway (Jahamun-ro 7-gil). Since the designation of Ikseon-dong as an urban environment readjustment zone in 2004, the approval of new food service business has been very low until around 2014, when the cooperative establishment committee is dissolved, and as the district unit plan for the preservation of hanok and regional management is being established, the number of new permits has exploded to date and restaurants in hanok conservation zones has been active.
As an at-reactor(AR) storage method o( spent fuel, there are horizontal concrete module type, metal storage cask type, concrete storage cask type, dual purpose (transportation and storage) cask type and multi-purpose (transportation, storage and disposal) cask type. All other types except multi-purpose one have been already used for AR dry storage of spent fuels after obtaining operation license in various foreign countries. Also the development of multi-purpose type has been continued for operation license. In America, Japan, Germany, Canada, Spain, Switzerland, and Czech Republic, etc., AR dry storage facilities are under operation or on propulsion, and spent fuels are transported to interim storage facility or reprocessing plant after dry storage at reactor temporarily. At Wolsung site, in case of Korea, concrete silo type has already been introduced, and it is believed to be inevitable to store spent fuels at reactor temporarily, considering the reality that storage capacity of spent fuel is approaching to the limit in some nuclear power plants. In this report, the system characteristics, design requirements, technical standards and status of AR storage system, which is suitable for domestic site such as Kori, have been studied. In most cases, the licensed period of storage cask is limited up to 20 years and the integrity of material and maintenance of leaktightness are required during the whole service life.
Hwang, Won Tae;Jeong, Hae Sun;Jeong, Hyo Joon;Kim, Eun Han;Han, Moon Hee
Journal of Radiation Protection and Research
/
v.39
no.2
/
pp.89-95
/
2014
In potential accident consequence assessments for the licensing approval of LWRs, the ground deposition of radionuclides released into the environment is not allowed into the models, as recommended in the U. S. Nuclear Regulatory Commission's regulatory guide. Meanwhile, it is allowed into the assessment models for the licensing approval of PHWRs with consideration of more detailed physical processes of radionuclides in the atmosphere. Under these backgrounds, importance of exposure dose by ground deposition was quantitatively evaluated and comprehensively discussed. For potential accidental releases of $^{137}Cs$ and $^{131}I$, total exposure doses were more conservative in case of without consideration of ground deposition than in case of with its consideration. It was because of that the depletion of air concentration resulting from ground deposition is more influential in the contribution to total exposure doses than additional doses from contaminated ground. The exposure doses by the inhalation of contaminated air showed the contribution of more than 90% in total exposure doses, depending on atmospheric stability, release period of radionuclides and distance from a release point. The exposure doses from contaminated ground showed less than 10% at most in contribution of total exposure doses. The ratios of total exposure doses in case of with consideration of deposition to without its consideration for $^{131}I$ were distinct than those for $^{137}Cs$. As the atmosphere is more stable, release duration of radionuclides is longer, distance from a release point is longer, it was more distinct.
Yoon, Byung Ku;Kim, Ji Yung;Kim, Byong Wan;Sung, Kyung Il
Journal of The Korean Society of Grassland and Forage Science
/
v.42
no.1
/
pp.32-40
/
2022
In this study, the appropriate unit cost in grassland establishment was redeveloped by the grassland establishment method and work criteria. The grassland establishment method was divided into tillage establishment (all logging) and no-tillage establishment (all logging and partial logging). The price for the work criteria by the establishment method was presented for each permission/authorization and establishment work. In permission/authorization for grassland establishment, the cost of each work criteria was of environmental impact (small scale environmental impact) assessment, disaster impact assessment, cadastral serving fee, forest survey, and connection fee for control of mountainous districts. In establishment was of logging, cleaning/gruffing, plowing/soil preparation, seeding, fertilization, livestock manure compost, seed, herbicide, labor cost (fertilizer, seed and herbicide), soil consolidation, cattle trail, and fence. The unit cost of grassland establishment was KRW 115,894,212 for the tillage establishment, and KRW 110,281,572 and KRW 106,680,122 for the all and partial logging of the no-tillage establishment, respectively. The current study redeveloped the establishment method, work criteria, and estimation of the unit cost of grassland establishment. It can be usefully used to carry out government projects to support related to establishment and maintenance of grassland.
Proceedings of the Korean Nuclear Society Conference
/
1996.05d
/
pp.529-534
/
1996
본 논문은 현재까지 수행된 신규 핵연료가공시설의 안전성 평가 내용, 안전심사의 경험을 통해 도출된 문제과 해결 현황 등을 제시한다. 이를 위해 신규 핵연료가공시설의 인허가에 관련된 국내의 관련 원자력법령체계의 특성을 고찰하고, 관련되는 국내외 규제요건 및 기술기준과의 비교를 통해 적용가능한 규제기준을 도출하여, 본 적용 기준에 따른 신규 핵연료가공시설의 안전설계 특성 평가 결과를 제시한다. 이러한 과정에서 도출된 주요 문제점과 그 해결을 위한 개선방향을 제언한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.