• Title/Summary/Keyword: 인양공법

Search Result 12, Processing Time 0.013 seconds

Development and Implementation of a Low-noise and Safe Dismantling Method for Full-Span Aluminum Slab Formwork Supported by Filler Supports (필러겸용 스포터로 지지되는 전구간 알루미늄 슬래브 거푸집의 저소음 안전낙하 공법개발 및 적용연구)

  • Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.261-271
    • /
    • 2024
  • The widespread adoption of aluminum slab formwork in modern construction, evident in both domestic and international projects, offers numerous advantages. However, a critical challenge persists regarding the dismantling process for these slabs. The current industry standard involves dropping the slabs to the ground floor upon removal. This practice raises several concerns, notably the generation of significant noise pollution that disrupts nearby communities. More importantly, the risk of worker injuries due to falls from height during the dismantling process is a serious safety hazard. Additionally, the impact from dropping the slabs can damage the aluminum itself, leading to increased replacement costs. These drawbacks necessitate the exploration of alternative dismantling techniques that prioritize worker safety, material sustainability, and overall process efficiency. Accordingly, in this study, when the entire first-generation slab formwork of an apartment house is simultaneously lowered to a reachable position for workers, it is then disassembled and lifted for transport to the next floor. This approach has the potential to demonstrate improvements in safety, quality, economy, and process efficiency.

Closing Step Analysis in Cable-Stayed Bridges to Produce Initial Equilibrium Condition (초기평형상태 구현을 위한 사장교의 폐합단계 해석)

  • Park, Yong Myung;Yun, Jae Sun;Cho, Hyun Jun;Park, Chung Gon
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.191-199
    • /
    • 2007
  • This paper presents a closing method for a cable-stayed bridge erected by the free cantilever method to produce the initial equilibrium configuration at the final construction stage. To realize the initial equilibrium condition in cable-stayed bridge by the cantilever method, compatibility conditions for vertical displacements, rotational angles, and axial displacements at the closing section of both side girders should be satisfied. In this paper, it was shown that it can be accomplished by using some applicable loads during construction such as the pull-up force of the derrick crane, some cable tension forces, and jacking force at the pylon. The proposed method was applied to a construction stage analysis of a sample bridge to demonstrate its validity, and it was acknowledged that the tower was considerably affected by the compatibility condition for axial displacement in the closing step.