Browse > Article

Closing Step Analysis in Cable-Stayed Bridges to Produce Initial Equilibrium Condition  

Park, Yong Myung (부산대학교 토목공학과)
Yun, Jae Sun (부산대학교 토목공학과)
Cho, Hyun Jun (부산대학교 토목공학과)
Park, Chung Gon (부산대학교 토목공학과)
Publication Information
Journal of Korean Society of Steel Construction / v.19, no.2, 2007 , pp. 191-199 More about this Journal
Abstract
This paper presents a closing method for a cable-stayed bridge erected by the free cantilever method to produce the initial equilibrium configuration at the final construction stage. To realize the initial equilibrium condition in cable-stayed bridge by the cantilever method, compatibility conditions for vertical displacements, rotational angles, and axial displacements at the closing section of both side girders should be satisfied. In this paper, it was shown that it can be accomplished by using some applicable loads during construction such as the pull-up force of the derrick crane, some cable tension forces, and jacking force at the pylon. The proposed method was applied to a construction stage analysis of a sample bridge to demonstrate its validity, and it was acknowledged that the tower was considerably affected by the compatibility condition for axial displacement in the closing step.
Keywords
cable-stayed bridges; cantilever method; closing analysis; displacement compatibility conditions; tower;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 이민권, 이해성 (2006) 대칭형 강 사장교의 폐합해석과 시공오차 의 예측, 대한토목학회논문집, 제26권, 제1-A호, pp.55-65
2 Nazmy, A.S., and Abdel-Ghaffar, M.A. (1990) Three- Dimensional Nonlinear Static Analysis of Cable- Stayed Bridges, Computers & Structures, Vol.34, No.2, pp.257-271   DOI   ScienceOn
3 TDV(2004) RM2004 User Guide
4 김제춘, 장승필 (1999) 초기부재력을 이용한 사장교의 초기형상 및 캠버량 결정, 대한토목학회 논문집, 제19권 제1-3호, pp.377-386
5 Gimsing, N.J. (1997) Cable Supported Bridges, concept and design, second ed., John Wiley
6 Fleming, J.F. (1979) Nonlinear Static Analysis of Cable- Stayed Bridge Structures, Computers & Structures, Vol.10, No.4, pp.621-635   DOI   ScienceOn
7 Kim, Ki-Seok, and Lee, Hae-Sung (2001) Analysis of target configurations under dead load for cablesupported bridges, Computer & Structures, Vol.79, No.29, 2001, pp.2681-2692   DOI   ScienceOn
8 부산광역시 건설본부 (2005), 화명대교 구조계산서
9 김제춘, 장승필 (2000) 시공단계를 고려한 사장교의 케이블 긴장 력 결정, 대한토목학회논문집, 제20권, 제3-A호, pp.385 -393
10 Wang, P.H., Tseng, T.C., and Yang, C.G. (1993) Initial Shape of Cable-stayed Bridges, Computers & Structures, Vol.46, No.6, pp.1095-1106   DOI   ScienceOn
11 박용명, 조현준 (2005) 최소자승법을 이용한 사장교의 적정 케이 블 장력 결정, 한국강구조학회논문집, 제17권, 제6호, pp. 727-736
12 Wang, P.H., Tang, T.Y., and Zheng, H.N. (2003) Analysis of Cable-Stayed Bridges during Construction by Cantilever Methods, Computers & Structures, Vol.82, No.4, pp.329-346   DOI   ScienceOn