• Title/Summary/Keyword: 인공증빙

Search Result 3, Processing Time 0.019 seconds

Artificial Sea Ice Increasing to Mitigate Global Warming (지구 온난화 경감을 위한 인공해빙증가)

  • Byun, Hi-Ryong;Park, Chang-Kyun
    • Journal of the Korean earth science society
    • /
    • v.36 no.6
    • /
    • pp.501-511
    • /
    • 2015
  • This study suggests a method of alleviating global warming by the increase of the Earth surface albedo through Artificial Sea ice Increasing (ASI) over the Available Freezing Areas (AFA). The method is developed based on the fact that the large sea surface area in or near the Arctic and the Antarctic has no ice even though both water and air temperatures are below zero and the artificial sea ice generation is thus available. The mean energy of $0.85Wm^{-2}$, which was suspected of adding to the earth by the global warming effect was calculated to offset at once when the sea ice area about $4.09{\times}10^6km^2$ was additionally increased. In addition, three techniques for producing ice plates on the sea surface (using ships, installation apparatus, and floating matter such as Green Cell Foam) for ASI were proposed. According to the result of simple analysis using the energy balance model, when ASI was maximally operated only for 3 months (September, October, and November) over AFA, it is expected that the annual mean temperature of earth surface would be decreased about $0.11^{\circ}C$ in the following year. On the other hand, in case of generating the artificial sea ice in all four seasons, a risk of triggering snowball earth was detected.

A Study on Evaluation in College Mathematics Education in the New Normal Era (뉴노멀(New Normal) 시대 대학수학교육에서의 과정중심 PBL 평가 - '인공지능을 위한 기초수학' 강좌 사례를 중심으로 -)

  • Lee, Sang-Gu;Ham, Yoonmee;Lee, Jae Hwa
    • Communications of Mathematical Education
    • /
    • v.34 no.4
    • /
    • pp.421-437
    • /
    • 2020
  • Problem/Project based learning(PBL) is a student-centered teaching method in which students collaboratively solve problems and reflect their experiences. According to the results of PBL study and the experiences of the authors in PBL instruction, this paper introduced the necessities, output and significance of learning process PBL evaluation method and sums up our PBL evaluation process. The issue of appropriate and fair evaluation has been raised in untact (non-contact) university mathematics education due to the novel coronavirus (COVID-19) of the year 2020. To this end, when we had the course on for the summer semester held at S University in the summer of 2020. To ensure the fairness in evaluation and to improve the quality of our college math education, the PBL evaluation method was fully adapted. As a result, most of the students who took the lecture have learned a wide range of related knowledge without a single exception, and students agreed it is an ideal, fair, rational, and effective evaluation method applicable to other online courses in the era of untact education. This case was summarized in detail and introduced in this paper.

Artificial Intelligence-based Real-time Risk Estimation Method of Construction Site Workers (인공지능기반 공사현장 작업자의 실시간 위험성 추정 방법)

  • Kang, Sung-Hwan ;Lee, Dong-Yeop;Cheung, Chong-Soo
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.307-308
    • /
    • 2023
  • 본 논문에서는 공사현장 작업자의 실질적 영향을 미치는 요소들을 고려하여 인공지능기반의 실시간 위험성 추정 기법을 개발하였다. 기존 재난안전학 또는 안전공학에서는 위험성평가를 실시하여 강도·빈도에 의하여 위험성을 추정하고 도출된 값을 통해 위험한 정도를 분류하는 경우가 많다. 그러나 대부분의 공사현장에서는 정적인 위험성평가를 통해 해당 유해위험요인을 근거로 형식적인 위험성평가가 이루어지고 있기 때문에 대부분의 사고 후 증빙 자료로만 활용되고 있는 것이 현실이다. 이 위험성평가를 진행하면서 변화하는 환경의 유해위험을 실시간으로 반영할 수 없게 되고, 이는 실질적인 작업자의 안전을 보장해 주지 못하는 문제를 발생시킨다. 이러한 점에서 위험성평가와 더불어 실질적인 안전한 작업장을 만들기 위해서 작업자의 건강정보 및 실시간 공사현장의 영상정보에 기반한 위험성 추정 기법은 실질적 안전사고를 예방하는 방법론 중 하나가 될 수 있다. 작업자의 건강정보는 개개인 맞춤형 건강 데이터에 근거한 해석이 가능하고 실시간 공사현장 영상은 작업 중 발생할 수 있는 돌발상황에 대비하기위해 사용된다. 이러한 위험성 추정 방법은 다양한 공사현장의 위험성 추정 기법으로 사용될 수 있다. 이로 인해 높은 정확도의 위험성 추정 수치를 얻을 수 있으며, 이는 실질적안 안전 예방활동에 있어서 매우 중요하게 작용한다. 위험성 추정 수치 예제를 통하여 본 논문에서 제시된 위험성 추정 방법론이 타당함을 확인하였다. 본 논문에는 기존 위험성평가에 더해 작업자의 건강정보 및 공사현장 실시간 영상정보를 이용하여 실질적인 작업자 안전을 위한 예방 방법을 제시하였다.

  • PDF