Reliability evaluation of power distribution system is the evaluation for all customers supplied from one power source as main transformer located in substation. However, power sources include not only the main transformer but distributed generations. Typical reliability evaluation has focused on configuration of power system with one source including failure rates of equipment. In this paper, we focus on not only configuration but power sources as distributed generations. New reliability evaluation method using power supplied probability (PSP) is proposed. The proposed evaluation method are proved through case studies.
As a general radial configuration of power distribution system, the various researches have being studied to change a radial configuration to network one such as smart, intelligent and micro grid for loop operation. If a radial configuration changes to network, protective coordination comes to the biggest problem. When a typical protective algorithm is applied to loop distribution system protection, the interrupted section is expanded, therefore, reliability grows worse. This paper presents the new protective method being able to apply to loop distribution system with Distribution Automation System (DAS) which separate the minimal faulted section. Through contingency analysis of the sustained and momentary fault, we analyzed the influence for radial configuration and loop configuration using interrupted area and proved the effectiveness of proposed method.
The structure of a power distribution system will change in a loop configuration such as in the case of a smart grid. If power distribution system changes radial to loop form, the structure may have to be changed significantly. Therefore, we analyzed the reliability indices and calculated a CIC(Customer Interruption Cost) for the loop power distribution system. The power distribution system reliability depends on the protection scheme. This study is applied to the current protection scheme method and is compared with each model. When the CIC was evaluated, most studies performed calculations only for sustained interruptions. However, in actuality, momentary interruption frequencies occurred more than sustain interruptions. Thus, it is occurred the CIC additively. Therefore, we evaluated a CIC including momentary interruption, for each model, and then compared with MAIFI(Momentary Average Interruption Frequency Index)
This paper presents an active and reactive power compensator for the wind power system with multi-polar synchronous generator. The proposed compensator is composed of a charge/discharge PWM converter and battery. The output power of a wind power system changes irregularly according to the variation of wind speed. The developed system is able to continuously compensate the active and reactive power. The operational feasibility of the proposed model was verified by simulations with PSCAD/EMTDC.
The purpose of smart grid is the low $CO_2$ through expansion of renewable energy. To achieve the purpose of smart grid, typical radial power distribution system will be changed to loop power distribution system. The loop power distribution system have many advantages such as low power loss, low voltage drop, and increase of connection of renewable energy. In this paper, the algorithm for minimization of interrupted section of power distribution system is proposed through communication between circuit breaker and recloser in loop power distribution system. The proposed algorithm is proved through case studies about reliability evaluation
Protection system is important part in distribution system. Protection system in power systems can fail either by not responding when they should(failure to operate) or by operating when they should not(false tripping). Customers has dissatisfied that due to the failure of protection system. The reliability of distribution system also has influenced. However, the failure of protection system can reduced by the maintenance. This paper has focused on malfunction of protection system. The approach is based on Markov models.
The domestic power distribution system is operating in an open loop mode; however, it already has a loop structure. Power distribution systems must be changed for bi-directions power supply for smart networks due to a changing of paradigm in electric power industry. The simplest bi-directions distribution networks can make it closing of normally open switch. However, bi-directions power supply is very difficulty to be operated and there are many parts which it must study. This paper presented various models that are able to change a radial system for loop structures. Further, we compared the reliability index for each model by evaluating the amount of improvement reliability required in radial power distribution system. In addition, we calculated CIC(Customer Interruption Cost) for each model by comparing and analyzing.
본 논문에서는 부하설비의 정전 시간을 최소화하기 위한 전력량계 무정전 교체 장치를 고안하여 개발하였다. 개발된 교체 장치는 전력량계 교체 시 정전을 피하기 위해 시행되고 있는 단순 우회회로 결선방법, UPS 사용법 등, 다른 방법들에 비해 간편하여 효율성을 증대하였다. 그리고 교체 작업동안 안전성을 확보하기 위하여 보호 요소들을 구성함으로써 신뢰성 또한 증대하였다. 본 장치의 적용으로 고객에게 정전 시간을 단축하여 신뢰성 있는 전력공급을 보장할 수 있게 되었다.
In this paper, the Time-varying Failure Rate (TFR) of power distribution system equipment is extracted from the recorded failure data of Korea Electric Power Corporation (KEPCO). For TFR extraction, it is used that the fault data accumulated by KEPCO during 10 years. The TFR is approximated to bathtub curve using the exponential (random failure) and Weibull (aging failure) distribution function. In addition, Kaplan-Meier estimation is applied to TFR extraction because of incomplete failure data of KEPCO. Finally, Probability plot and regression analysis is applied. It is presented that the extracted TFR is more effective and useful than Mean Failure Rate (MFR) through the comparison between TFR and MFR.
Now there is utilization of elevator increasing continuously, it is one of electrical facilities taking a serious view safety. However, elevator comfortable ride is researched generally Recently aging condition, equipment life, malfunction, other applicancies of power electronics and equipment disturbance effect on power quality and prevention measures are much researches in advanced nation. but awareness is lacking real condition up to now in domestic. Voltage sag, swell, harmonics, surge etc of elevator system is important problem about human safety. and there are many quality compensation to solve these problem of elevator. So to evaluate these problem, in this paper, displayed result through computer simulation for converter of problem, and inverter part by power quality problem in power distribution system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.