Journal of the Korean Recycled Construction Resources Institute
/
v.9
no.3
/
pp.383-388
/
2021
In this study, constant head water permeability test was adopted to evaluate self-healing performance of mortars containing inorganic healing materials which consist of blast furnace slag, sodium sulfate and anhydrite. Clinker powder and sand replaced for a part of cement and fine aggregates. On constant head water permeability test for self-healing mortars, unit water flow rate of mortar specimens were measured according to crack width and healing period. As a result of evaluating the healing performance of self-healing mortar, it was confirmed that with the initial crack width of 0.3mm, the healing rate at healing period of 28 days increased by more than 30%p compared to plain mortar, greatly improving the healing performance. Furthermore, the coefficient(α) which was estimated from the relationship between crack width and unit water flow rate was used for calculating equivalent crack width. By analyzing the correlation of healing rate and equivalent crack width, the time and initial crack width attaining healing target crack width were predicted.
When issuing forecasts and alerts for agricultural drought, the relevant ministries only rely on the observation data from the reservoirs managed by the Korea Rural Community Corporation, which creates gaps between the drought analysis results at the local (si/gun) governments and the droughts actually experienced by local residents. Closing these gaps requires detailed local geoinformation on reservoirs, which in turn requires the information on reservoirs managed by local governments across Korea. However, installing water level and flow measurement equipment at all of the reservoirs would not be reasonable in terms of operation and cost effectiveness, and an alternate approach is required to efficiently generate information. In light of the above, this study validates and calibrates the parameters of the TANK model for reservoir basins, divided them into groups based on the characteristics of different basins, and applies the grouped parameters to unmeasured local government reservoirs to estimate and assess inflow. The findings show that the average determinant coefficient and the NSE of the group using rice paddies and inclinations are 0.63 and 0.62, respectively, indicating better results compared with the basin area and effective storage factors (determinant coefficient: 0.49, NSE: 0.47). The findings indicate the possibility of utilizing the information regarding unmeasured reservoirs managed by local governments.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.12
/
pp.60-66
/
2020
Torrential rain causes landslide damage every year. In particular, the 2011 downpour caused landslides at numerous points throughout Mt. Woomyeon, which resulted in considerable damage to people and property. Because it occurred in an urban area, this case became a major social issue and received public attention. Measures were quickly implemented for multilateral investigations and recovery. Landslides caused by heavy rain are greatly affected by rainfall at the time. Landslides from the upper part erode the flow path, increasing the size, causing much damage to the lower part. This study selected a rural village area among the damaged areas of Mt. Woomyeon, and analyzed the change in terrain profile before and after a landslide using the DSM data obtained from airborne LiDAR. This area can be divided into three hydrological basins. For each basin, the analysis was performed on the average slope of each part of the flow path, as well as the erosion and deposition due to soil flow. As a result of the analysis, it was estimated that the total amount of soil from the Jeonwon village was 15,300㎥. These field data based on GIS can be used as basic information to predict damage in the case of a similar disaster, and it can be helpful in analyzing the results of various debris flow simulations.
This study presents the geochemical characteristics of cave water to evaluate its origin and flow path. From June 2022 to may 2023, river water was collected at two sites (WE1 and WE2) in the Donggang River around Baengnyongdonggul Cave, and cave water was collected at four sites (WE3 to WE6) inside Baengnyongdonggul Cave. Water samples were analyzed for major dissolved components. Both river and cave waters were classified as Ca-HCO3 type. All cave water samples were supersaturated in carbonate minerals, suggesting that carbonate minerals would precipitate within the cave. Due to differences in the source of cave water and the degree of water-rock interaction, the geochemical characteristics of water from sites where the flow of cave water is observed (WE3 and WE6) and rimstone pools (WE4 and WE5) could be clearly distinguished. The cave water at WE6 flows in from the Donggang River, then passes through WE3 and flows back out into the Donggang River. The cave water at WE4 and WE5 is supplied from precipitation, but the flow path of cave water at WE4 and WE5 is different.
Proceedings of the Korea Water Resources Association Conference
/
2021.06a
/
pp.453-453
/
2021
도시지역 비점오염원관리, 물순환 회복, 침투 및 증발산량 증가, 열섬현상 저감을 위한 주요한 방안으로 저영향개발(low impact development, LID)과 그린인프라 기법의 적용되고 있다. LID 시설은 소규모 분산형 시설로써 넓은 지역에 많고 다양한 시설들이 적용되어 시설의 개수가 많으며, 수질 및 토양 내 기성제품에 대한 센서들의 가격은 고가로 형성되어 있어 기기의 경제성 및 유지관리 등 적용하는데 제한적이다. 따라서 과거 모니터링 자료를 기반으로 오염물질들과의 상관성 분석을 통하여 계측이 어려운 항목들을 계측가능한 항목들로부터 예측 가능하며, 선정된 항목들에 대한 비용효율적인 센서를 개발하여 실시간 LID 모니터링이 가능한 비용효율적 모니터링을 개발하였다. 공주대학교 천안캠퍼스의 LID 시설들은 2013년에 조성되어 현재까지 시설이 운영되고 있으며, 5년이상의 과거 강우시 모니터링 자료들을 이용하여 오염물질 상관성 분석을 수행가능 하기에 대상지로 선정하였다. 오염물질 상관성 분석은 2013년부터 2017년도에 침투도랑에서 수행된 강우시 모니터링 자료를 활용하여 각 오염물질들의 상관성을 분석을 수행하였다. 침투도랑 내 유입되는 평균 유입수는 TSS 286.1±318.3 mg/L, BOD 22.6±39.5 mg/L, TN 8.96±5.85 mg/L, TP 1.01±1.11 mg/L로 나타났다. 겨울철에 비해 여름철에서의 오염물질의 유입농도가 높은 것으로 분석되었다. 이는 여름철 고온건조로 인한 노면 내 차량의 주행으로 인한 중금속, 폐타이어 등과 장마철 강우 시 유출된 토사로 인하여 유입수의 농도가 높은 것으로 분석되었다. 오염물질 부하량은 TSS와 COD 0.66으로 유의성이 높은 것으로 나왔으며, COD와 TSS, TP, TN 등 유의성이 높은 것으로 분석되었다. Arduino와 Raspberry PI를 활용하여 저비용 센서와 LTE 모뎀통신과 데이터 베이스 연결하여 개발된 프로그램을 통해서 무선으로 LID 시설에 대한 모니터링을 침투화분2와 식생체류지에 조성하였다. 전력공급이 어려운 식생체류지의 경우 태양열(Solar system) 시스템과 보조 전력 배터리를 조성하여 장마철이나 장기적인 악천후로 인한 전력을 생산하지 못할 경우 보조전력배터리에서 전력을 제공하여 지속적인 모니터링이 이루어지도록 설계하였다. 토양함수량, 토양온도와 Conductivity 등 3종류의 센서를 적용하였으며, 프로그램은 현재 2단계를 통한 2차수정을 통하여 프로그램을 구축하였다. 오차, 오작동, 계측값에 대한 검·보정 작업이 필요하다. 또한 대기자료의 구축을 통해 보다 토양과 LID 시설에 대한 영향분석이 필요한 것으로 사료된다.
Kim, Jeong Soo;Park, Sung Chun;Park, Su Ho;Lee, Woo Bum
Proceedings of the Korea Water Resources Association Conference
/
2021.06a
/
pp.441-441
/
2021
우리나라의 홍수조절용댐은 총 5개소로 영산강유역에 두 개소와 한강유역에 세 개소가 있다. 한강유역에 있는 세 개소의 홍수조절지용댐은 한강상류의 북한지역에서 발생하는 집중호우에 대비하기 위한 댐으로, 임진강 하류지역의 수해방지를 위한 한탄강댐과 군남홍수조절지(군남댐)가 있으며 북한강 하류와 수도권의 홍수예방을 위한 평화의 댐이 있다. 영산강유역에 있는 두 개소의 홍수조절지는 2006년에 수립한 영산강치수종합대책에서 계획이 수립된 시설로 2011년 4대강 사업의 일환으로 설치하여 K-water에서 운영 중에 있다. 4대강 사업 이전의 영산강유역은 홍수량을 조절할 수 있는 홍수조절용량이 전무했던 실정으로 하도에서 홍수량의 전량을 수용해야했던 홍수에 매우 취약한 하천이었다. 그러나 4대강 사업을 통하여 영산강유역의 4대호를 비롯한 농업용댐의 숭상을 통한 홍수조절용량의 확보와 더불어 나주천변저류지와 담양홍수조절지, 화순홍수조절지를 설치하여 홍수로부터 상대적으로 안전한 하천으로 변모할 수 있었다. 그러나 영산강유역의 다른 하나의 과제는 여전히 남아있다. 우리나라의 하천 중에서 가장 수질이 악화되어 있는 하천이라는 불명예이다. 홍수조절지는 1년 중 3개월에 해당하는 홍수기에 사용할 수 있는 시설로 1년 중 9개월에 해당하는 비홍수기에는 홍수조절지의 효율적인 공간활용을 위하여 주민지원사업 등 다각도로 고민하여 사용하고 있으나 하천 외적인 문제를 수용하는 범주에 머무르고 있다. 하천이 가지고 있는 문제점을 다소라도 해소할 수 있는 목적으로 사용될 수 있다면 하천 외적인 문제를 수용하는 것 보다 하천 내적인 문제를 해소하는 목적으로 사용하는 것이 보다 바람직할 것으로 판단된다. 이를 위하여 영산강의 내적인 가장 큰 문제점은 수질악화로 인한 수질개선이라 할 수 있다. 따라서 홍수기로 한정되어 사용하는 홍수조절지를 해당하천의 내적인 문제를 다소라도 해소할 수 있는 공간으로 비홍수기에 기여할 수만 있다면 비홍수기의 활용목적을 확대하여 다목적조절지로의 변모가 필요하다고 판단한다. 따라서 본 연구에서는 영산강유역에 있는 담양홍수조절지와 화순홍수조절지의 두 개소 홍수조절지를 활용하여 영산강 수질개선에 기여할 수 있는 정도를 파악하였다. 비홍수기에 유출량의 일부를 조절지에 담수해 두었다가 수질개선 목적의 희석수로 방류하는 시나리오를 마련하여 시나리오별로 영산강의 수질개선효과를 분석하여 제시하였다. 수질개선효과를 분석하기 위하여 EFDC모델을 구축하고 모델 수행을 위한 시나리오는 조절지의 담수율과 방류량 그리고 조절지의 관리수질조건 등을 이용하여 작성하고 수질예측 결과에 따라 TOC, CHl-a, T-P 수질항목을 대상으로 수질개선효과를 분석하여 제시하였다.
Future runoff analysis is influenced by climate change scenarios and hydrologic model parameters, with uncertainties. In this study, the uncertainty of future runoff analysis according to the shared socioeconomic pathway (SSP) scenario and hydrologic model parameters was analyzed. Among the SSP scenarios, the SSP2-4.5 and SSP5-8.5 scenarios were used, and the soil and water assessment tool (SWAT) model was used as the hydrologic model. For the parameters of the SWAT model, a total of 11 parameter were optimized to the observed runoff data using SWAT-CUP. Then, uncertainty analysis of future estimated runoff compared to the observed runoff was performed using jensen-shannon divergence (JS-D), which can calculate the difference in distribution. As a result, uncertainty of future runoff was analyzed to be larger in SSP5-8.5 than in SSP2-4.5, and larger in the far future (2061-2100) than in the near future (2021-2060). In this study, the uncertainty of future runoff using future climate data according to the parameters of the hydrologic model is as follows. Uncertainty was greatly analyzed when parameters used observed runoff data in years with low flow rates compared to average years. In addition, the uncertainty of future runoff estimation was analyzed to be greater for the parameters of the period in which the change in runoff compared to the average year was greater.
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.2B
/
pp.177-185
/
2008
Accurate monitoring of snow cover is a key component for studying climate and global as well as for daily weather forecasting and snowmelt runoff modelling. The few observed data related to snowmelt was the major cause of difficulty in extracting snowmelt factors such as snow cover area, snow depth and depletion curve. Remote sensing technology is very effective to observe a wide area. Although many researchers have used remote sensing for snow observation, there were a few discussions on the characteristics of spatial and temporal variation. Snow cover maps were derived from NOAA AVHRR images for the winter seasons from 1997 to 2006. Distributed snow depth was mapped by overlapping between snow cover maps and interpolated snowfall maps from 69 meteorological observation stations. Model parameters (Snow Cover Area: SCA, snow depth, Snow cover Depletion Curve: SDC) were built for 7 major watersheds in South Korea. The decrease pattern of SCA for time (day) was expressed as exponentially decay function, and the determination coefficient was ranged from 0.46 to 0.88. The SCA decreased 70% to 100% from the maximum SCA when 10 days passed.
Climate change is expected to amplify the future flooding risks in rural areas which could have devastating implications for the sustainability of the agricultural sector and food security in South Korea. In this study, spatially disaggregated and statistically bias-corrected outputs from three global circulation models (GCMs) archived in the Coupled Model Intercomparison Project Phases 5 and 6 (CMIP5 and 6) were used to project the future climate by 2100 under medium and extreme scenarios. A hydrological model was developed to simulate the flood phenomena at the Shindae experimental site located in the Chungcheongbuk Province, South Korea. Hourly rainfall, inundation depth, and discharge data collected during the two extreme events that occurred in 2021 and 2022 were used to calibrate and validate the hydrological model. Probability analysis of extreme rainfall data suggested a higher likelihood of intense and unprecedented extreme rainfall events, which would be particularly notable during 2051-2100. Consequently, the flooded area under an inundation depth of >700 mm increased by 13-36%, 54-74%, and 71-90% during 2015-2030, 2031-2050, and 2051-2100, respectively. Severe flooding probability was notably higher under extreme CMIP6 scenarios than under their CMIP5 counterparts.
Journal of Korea Spatial Information System Society
/
v.10
no.4
/
pp.77-88
/
2008
There has been growing demands to manage the water quality of west coastal region due to the large scale urbanization along the coastal zone, the possibility of application of TMDL(Total Maximum Daily Loadings) to Han river, and the natural disaster such as oil spill incident in Taean, Chungnam. However, no system has been developed for such purposes. In this background, the demand of GIS based effective water quality management has been increased to monitor water quality environment and propose best management alternatives for Han river and Kyeonggi bay. This study mainly focused on the development of integrated water quality management system for Han river bas in and its estuary are a connected to Kyeonggi bay to support integrated water quality management and its plan. Integration was made based on GIS by spatial linking between water quality attributes and location information. A GIS DB was built to estimate the amount of generated and discharged water pollutants according to TMDL technical guide and it included input data to use two different water quality models--W ASP7 for Han river and EFDC for coastal area--to forecast water quality and to suggest BMP(Best management Practices). The results of BOD, TN, and TP from WASP7 were used as the input to run EFDC. Based on the study results, some critical areas which have relatively higher pollutant loadings were identified, and it was also identified that the locations discharging water pollutant loadings to river and seasonal factor affected water quality. And the relationship of water quality between river and its estuary area was quantitatively verified. The results showed that GIS based integrated system could be used as a tool for estimating status-quo of water quality and proposing economically effective BMPs to mitigate water pollution. Further studies need to be made for improving system's capabilities such as adding decision making function as well as cost-benefit analysis, etc. Also, the concrete methodology for water quality management using the system need to be developed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.