• Title/Summary/Keyword: 위험성분석

Search Result 5,917, Processing Time 0.035 seconds

Landslide Risk Analysis due to Development of Mountain Area (산지지역 개발에 의한 산사태 위험 분석)

  • Namgyun Kim;Yunseong Park
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.4
    • /
    • pp.67-74
    • /
    • 2023
  • In this study, the risk of landslides was analyzed for planned development sites in mountainous areas. Field survey was conducted on the research area with the slope and valley site. The criteria for evaluating the risk of landslides in the field survey were based on the risk assessment table of the Korea Forest Service Notice No. 2023-10. The research area has 13 slopes and 11 valleys. As a result of evaluating the risk area, two slopes and two valley were found to be dangerous sites in each. Numerical simulation was performed on the investigated risk areas to predict the spread of damage. The debris flow was simulated to have an affect on roads and buildings located in the lower part of the basin, and it was determined that a disaster prevention facility was nacessary to minimize damage. This information can be used to determine the impact of disasters before carrying out mountain development.

Method for determining flood risk in construction sites using artificial neural network techniques (인공 신경망 기법을 활용한 건설 현장 침수 위험 판정 방법)

  • Im Jang Hyuk;Cho Hye Rin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.344-344
    • /
    • 2023
  • 최근 기후변화에 따라 극한 강우로 전 세계적으로 국지적 홍수 피해가 증가하고 있다. 또한 극한 강우 발생시 다양한 건설 현장의 상황에 따라 침수 취약성이 나타나 인적 물적 피해로 이어질 수 있다. 특히, 시공에 따른 현장 지형 변화에 대해 실시간으로 침수 예측이 불가하여 위험 판단이 어려운 실정이며, 극한 강우 발생에 대비하기 위해 강우 정보 획득 및 분석을 효율화하여 강우예측 정확성을 높일 필요가 있다. 이러한 필요성에 따라 본 연구에서는 건설 현장의 침수 피해를 최소화하기 위해 침수 위험을 판정하고 예측하는 방법을 제시하고자 한다. 본 연구의 침수 위험 판정 방법은 건설 현장에서 실시간 지형변화 정보 확보와 침수 위험 판정의 정확도를 높이기 위한 침수심 분석에 인공 신경망 기법을 활용하였다. 또한, 침수판정 알고리즘은 지형, 강우 분석 모듈과 침수판정 모듈로 구성하였다. 지형 분석 모듈은 건설 현장이 시공진행에 따른 지형 데이터의 변화를 고려하기 위해 실시간 영상 정보의 객체 탐지를 구분하는 인공 신경망 기법을 적용해 지형 분석 모듈을 구축하였다. 강우 분석 모듈은 다양한 강우 정보를 취합할 수 있는 서버를 구축하여 강우 임베딩 정보를 실시간으로 분석하도록 고안하여 정확도를 높였다. 이러한 자료를 바탕으로 강우-유출해석에 의한 침수심 값과 실측값, 침수 지표를 활용하여 인공 신경망 기법으로 침수 위험을 판정하도록 제시하였다. 본 연구를 통해 건설 현장에서 지형 상태의 지속적인 변화와 강우데이터의 정확도 향상에 대응할 수 있는 침수 위험 판정이 가능하고 인적 물적 피해 최소화를 기대할 수 있다. 향후, 본 연구에서 제시된 방법은 건설 현장에서 분석 시스템과 실측 모니터링에 의해 검증되어야 할 것이며, 건설 현장 외에도 스마트 도시 및 지하 공간에서 확대하여 적용할 수 있을 것으로 판단된다.

  • PDF

관제구역 내 어선 조업패턴 분석 및 충돌위험성 평가에 관한 연구

  • 이영민
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2022.06a
    • /
    • pp.251-253
    • /
    • 2022
  • 관제구역내 충돌사고 예방을 위해 어선에 대한 안전관리가 중요시 되고 있으며 이들 어선들의 조업 패턴 분석 및 충돌 위험평가를 통해 위험 구역을 설정, 설정된 구역 내에서의 사고 예방을 위한 효율적 관제 방안 마련하였다.

  • PDF

Estimation of Risk and Optimal Route to Transport Hazardous Materials -Application to Metropolitan Area- (위험물 수송을 위한 위험도 및 최적경로산정 -수도권 사례를 중심으로-)

  • 조용성;오세창
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.1
    • /
    • pp.75-89
    • /
    • 1999
  • 위험물차량사고는 일반차량의 교통사고시 발생하는 인명피해, 재산피해, 교통지체 외에 부가적으로 환경적 영향에 의한 엄청난 인명 및 재산손실을 유발시킬 수 있다. 따라서 이러한 위험물차량사고를 예방하고 피해를 최소로 줄이기 위해서는 위험물수송경로의 신중하고 체계적인 결정이 필수적이라 할 수 있다. 따라서, 본 연구는 위험물차량의 수송경로를 결정할 때 고려해야 할 여러 가지의 기준 및 목표에 따라 위험물수송경로를 설정하는 모형을 제시함으로써 위험물수송에 수반되는 위험을 최소화하면서 위험물차량의 통행시간, 거리, 비용 등을 최적화하여 위험물수송의 안전 및 운영효율성을 향상시키고자 한다. 먼저, 위험물 수송경로의 기준지표로 사용될 위험도를 나타내기 위해 사고율과 피해가능규모를 구하도록 사 고건수, 링크 주변노출인구, 링크상의 노출인구, 밀도 등을 변수로 하는 모형식을 제안하고, 두 번째로 위험물 수송을 위한 최적경로를 산출하기 위해 위험도와 통행시간을 목적함수로 하는 다목적계획모형을 제안하였고 기존의 최적경로 알고리즘을 적용하여 최적경로를 산출하였다. 마지막으로 실제 수도권지역을 대상으로 본 연구에서 제안한 모형을 적용하고 현재 일반적으로 사용되는 최단경로와 비교.분석하였다. 모형적용결과, 링크주변인구만을 고려하는 기존 모형에 비해 링크상의 인구를 함께 고려함으로써 좀더 실제적으로 교통상황을 충분히 반영한 피해규모를 산정하였다. 또한, 본 연구에서 제안한 위험도와 통행시간에 0.5의 비중을 주는 다목적모형이 기존의 위험도모형에 비해 충분한 안전성을 확보하면서 최소 4%, 최대 12%의 통행시간 개선의 효과가 있음을 나타냈다.

  • PDF

Safety Risk Management Policy of United States small unmanned aerial system (미 소형 무인비행체계의 안전성 위험관리 정책)

  • Hong, Jin-Keun
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.9
    • /
    • pp.35-42
    • /
    • 2021
  • The purpose of this paper is to review the small unmanned aerial system (sUAS) safety policy promoted by the United States(US) government. Therefore, in this paper, along with sUAS risk factors, the risk factors of sUAS that the US government is interested in are described. In addition, the risk factors were classified into physical and non-physical factors, and provisions mentioned in the Federal Aviation Administration(FAA) Relicensing Act were reviewed. Other risk scenarios were analyzed focusing on target scenario items that the FAA is interested in, such as flight operation disruption, infrastructure damage, and facility trespassing. Of course, we looked at the risk management principles promoted by the US FAA. In this paper, as a research method, the direction and contents of the FAA's sUAS policy were studied and reviewed from the analysis of major foreign journals and policy. In the research result of this paper, by analyzing the FAA sUAS safety risk management policy, the integrated operation and safety policy, physical risk management policy, operation and safety regulation, and sUAS policy and technology direction necessary for establishing the sUAS safety risk management guide in Korea are presented. The contribution of this study is to identify the leading US sUAS safety policy direction, and it can be used as basic data for deriving future domestic policy directions from this. Based on the research results presented in the future, policy studies are needed to derive detailed implementation plans.

여수·광양항 위험물부두 입출항 대표선박 선정에 관한 고찰

  • Lee, So-Yeong;Lee, Hong-Hun;Jeong, Chang-Hyeon
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.07a
    • /
    • pp.31-33
    • /
    • 2015
  • 허베이스피리트호 사고, 울산항 및 광양항 유조선 기름유출사고 등으로 위험물질 취급항만의 안전성 검토가 요구되어, 2014년 해양수산부는 우선적으로 인천항, 여수 광양항, 울산항에 대한 위험물 취급부두 입출항 선박에 대한 안전성 검토를 시행하고 있다. 본 연구에서는 여수 광양항의 위험물 취급부두에 입출항하는 선박을 부두별 및 선종별로 최대 크기의 선박과 가장 많은 입출항 실적을 가지고 있는 선박으로 분석하여 선박조종시뮬레이션을 수행하기 위한 대표선박으로 선정하고자 한다. 이를 위하여 해운항만물류정보센터를 통한 2014년 1년간의 Port-MIS자료를 수집하여 분석하였다.

  • PDF

Study on the Transport Reliability Concerning Risks Scenarios (위험사건(Risk)발생 시나리오를 고려한 운송 신뢰성 연구)

  • Kim, Eun-Ji;Ganbat, Enkhtsetseg;Kim, Hwan-seong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.256-257
    • /
    • 2015
  • The trend of globalization and the development of the communication-Information technology not only complexified the supply chain, but also, led to the needs of the high quality of logistics service for customers. I t defines risks that can occur in truck transport under unexpected situation with Fault Tree Analysis(FTA) and calculates failure rate concerning relationship between each risks. Based on the 4 kinds of middle failure events that defined in FTA, Reliability function which is regarded about risks sequentiality and time flow is resulted in. I t is meaningful that it calculates reliability of logistics and transportation system with engineering methodology.

  • PDF

Assessment Models of Political Risk and the Sensitivity Analysis (정치적 위험의 평가모형과 민감도분석)

  • Moon, Chang-Kuen;Yim, Chun-Ho
    • Korean Business Review
    • /
    • v.20 no.1
    • /
    • pp.105-122
    • /
    • 2007
  • This paper identifies the dimensions of political risk on the basis of the classification between risk and uncertainties to implement the precise identification and assessment of the various types of political risk and develop the sound assessment model to accomplish their practical applications. This paper shows the concrete and detailed processes of deriving the assessment models and applying them with the microsoft excel spreadsheet, confirms the result of Butler and Joaquin(1998), and presents the methods of identifying the various combination effects of the political risk impact and the covariance relationship with the market portfolio return through the sensitivity analysis.

  • PDF

초기사건의 위험달성가치 중요도 척도 계산 방법에 대한 연구

  • 김길유;정우식;강대일;양준언
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.114-119
    • /
    • 2003
  • 원자력발전소를 비롯한 위험 시설물의 확률론적 안전성 평가(Probabilistic Safety Assessment: PSA)는 고장수목(Fault Tree) 및 사건수목(Event Tree) 분석으로 이루어지며, 분석 결과로 그 시설물의 위험도(Risk)는 최소단절집합(Minimal Cutsets)들의 합으로 구성 된다.(중략)

  • PDF

An Empirical Study on Bank Capital Channel and Risk-Taking Channel for Monetary Policy (통화정책의 은행자본경로와 위험추구경로에 대한 실증분석)

  • Lee, Sang Jin
    • Economic Analysis
    • /
    • v.27 no.3
    • /
    • pp.1-32
    • /
    • 2021
  • This study empirically analyzes whether bank capital channel and risk-taking channel for monetary policy work for domestic banks in South Korea by analyzing the impact of the expansionary monetary policy on the rate spread between deposit and loan, capital ratio, and loan amount. For the empirical analysis, the Uhlig (2005)'s sign-restricted SVAR(Structural Vector Auto-Regression) model is used. The empirical results are as follows: the bank's interest rate margin increases, the capital ratio improves, risk-weighted asset ratio increases, and the amount of loans increases in response to expansionary monetary shock. This empirical results confirm that bank capital channel and risk-taking channel work in domestic banks, similar to the previous research results. The implications of this study are as follows. Although the expansionary monetary policy has the effect of improving the bank's financial soundness and profitability in the short term as bank capital channel works, it could negatively affect the soundness of banks by encouraging banks to pursue risk in the long run as risk-taking channel works. It is necessary to note that the capital ratio according to the BIS minimum capital requirement of individual banks may cause an illusion in supervising the soundness of the bank. So, the bank's aggressive lending expansion may lead to an inherent weakness in the event of a crisis. Since the financial authority may have an illusion about the bank's financial soundness if the low interest rate persists, the authority needs to be actively interested in stress tests and concentration risk management in the pillar 2 of the BIS capital accord. In addition, since system risk may increase, it is necessary to conduct regular stress tests or preemptive monitoring of assets concentration risk.