Development and performance verification of induced drainage method for leakage treatment in existing underground structures (운영중인 지하구조물 누수처리를 위한 유도배수공법 개발 및 성능 검증)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.533-549
    • /
    • 2017
  • In this study, drainage systems were proposed to drain the leakage of groundwater in the existing underground concrete structures. The system consists of drainage board, wire mesh, fixed nail, and mortar with mineral. In order to increase constructability, the drainage board and wire mesh were attached on the surface of cement concrete using the air nailer and fixed nail. The mortar with 30% of blast furnace slag was sprayed on the drainage board and wire mesh using the spray mortar equipment. The field test construction was carried out in a conventional concrete lining tunnel and concrete retaining wall for performance verification of the drainage system in the field. There was no problem with performance degradation in the drainage system for three years after construction. The bond strength tests were performed on the sprayed mortar at 14 days and about 3 years after field test construction. In case of attaching the wire mesh on the drainage board, the bond strengths of the sprayed mortar were 1.04 MPa at 14 days and 1.46 MPa about 3 years. In case of the drainage board without the wire mesh, the bond strengths of the sprayed mortar were 1.13 MPa at 14 days and 0.89 MPa, less than 1 MPa of bond strength criteria, about 3 years.

A Study on Evaluation of Thermal Environment using Heat Stress Indices for Deep Coal Mine in Korea (열적지표를 적용한 국내 고심도 석탄광산의 열환경 평가 연구)

  • Park, Seon-Oh;Roh, Jang-Hoon;Kim, Jin
    • Tunnel and Underground Space
    • /
    • v.24 no.2
    • /
    • pp.166-175
    • /
    • 2014
  • In this study, the thermal environment in a large scale coal mine located in Taebaek, Gangwondo was assessed by a field survey. In order to estimate the thermal environment, various heat stress indices such as WBGT, HSI, ESI, KATA index and effective temperature were investigated. Correlation analysis was also conducted. It was found that the thermal environment in most workplace was high. In particular, the correlation coefficient between HSI reflected in physiological fatigue characteristic and the maximum sweat evaporation heat was -0.834. This shows that the correlation coefficient have the most influence on HSI index. The factor which has the most influence on the maximum sweat evaporation heat is velocity of air. The thermal environment of high-depth coal mines is likely to be improved by installing a structure that enables the maximum prevention of extended digging, air doors, or the leakage of the inflow of air in the first shaft.

Proposal of the Unsupported Span of Openings in the Domestic Underground Limestone Mines (국내 지하 석회석광산 갱도의 무지보 폭을 위한 제안)

  • SUNWOO, Choon
    • Tunnel and Underground Space
    • /
    • v.28 no.4
    • /
    • pp.358-371
    • /
    • 2018
  • The stability of openings in the underground mine is major concern in the operation of mines that must ensure productivity and safety. Among many rock conditions affecting cavities stability, the width and height of the opening is an important design factor. In this paper, we consider to determine the maximum unsupported span of a opening in a limestone mine by using the Q system among several rock classification schemes. In order to determine the span of the unsupported opening in the limestone mine, rock mass classifications were carried out at over 200 sites in the underground limestone mines. The relationships by using the Q system and the stability graph proposed by Mathews to determine the maximum span of the unsupported opening were derived and compared. We propose a new classification method that combines GSI and RMR rock classification systems to make it easy to use in a field.

Investigation of Prior Technology and Development Case for Consecutive Excavation Technique of Shield TBM (연속굴착 쉴드 TBM 기술 관련 해외기술 및 개발사례 조사)

  • Mun-Gyu Kim;Jung-Woo Cho;Hyeong-seog Cha
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.299-311
    • /
    • 2023
  • Continuous excavation technologies are developed to improve the excavation rate of shield TBM. Continuous excavation is a technology that provides thrust to segments, excluding being installed one, to reduce tunneling downtime. This paper investigated the prior technology related to continuous excavation segments. The main technology was classified into helical segment, honeycomb segment, and conventional segment methods. The helical segment method has not been applied in actual construction yet, and the honeycomb segment method has not succeeded in commercialization. The continuous excavation method using conventional segments has been successfully demonstrated. The thrust force and operation method of the thrust jacks for the semi-continuous technology were analyzed. Continuous excavation TBM research is also progressing in Korea, and through the analysis of successful cases, the need to develop independent continuous excavation methods has been identified.

A study on the improvement of the air exhaust system at the PSD installed subway station (도시철도 지하역사 PSD 설치에 따른 배기시스템 개선 연구)

  • Kwon, Soon-Bark;Song, Ji-Han;Ryu, Ju-Hwan;Jo, Seung-Won;Oh, Tae-Suk;Bae, Sung-Joon;Kim, Hyo-Gyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.353-362
    • /
    • 2015
  • Platform screen door (PSD) installed at underground subway station has reduced the safety accident, but it may cause poor air ventilation condition due to the isolated exhaust duct in the subway tunnel area. In this study, the additional ventilation system was suggested, which can be installed at a void space (i.e., storage room under stairs) of platform in order to improve efficiency of air ventilation rate. Exhausted air from platform was directed to underneath of platform and joined with existing ventilation duct of train exhaust system (TES). One subway station in Seoul city was selected to predict the effectiveness of the suggested lower exhaust system by using the computational fluid dynamics (CFD) analysis. The predicted mean age of air was decreased by 16.5% which proves the improvement of air ventilation efficiency when the suggested lower exhaust system was applied.

Application of spatiotemporal transformer model to improve prediction performance of particulate matter concentration (미세먼지 예측 성능 개선을 위한 시공간 트랜스포머 모델의 적용)

  • Kim, Youngkwang;Kim, Bokju;Ahn, SungMahn
    • Journal of Intelligence and Information Systems
    • /
    • v.28 no.1
    • /
    • pp.329-352
    • /
    • 2022
  • It is reported that particulate matter(PM) penetrates the lungs and blood vessels and causes various heart diseases and respiratory diseases such as lung cancer. The subway is a means of transportation used by an average of 10 million people a day, and although it is important to create a clean and comfortable environment, the level of particulate matter pollution is shown to be high. It is because the subways run through an underground tunnel and the particulate matter trapped in the tunnel moves to the underground station due to the train wind. The Ministry of Environment and the Seoul Metropolitan Government are making various efforts to reduce PM concentration by establishing measures to improve air quality at underground stations. The smart air quality management system is a system that manages air quality in advance by collecting air quality data, analyzing and predicting the PM concentration. The prediction model of the PM concentration is an important component of this system. Various studies on time series data prediction are being conducted, but in relation to the PM prediction in subway stations, it is limited to statistical or recurrent neural network-based deep learning model researches. Therefore, in this study, we propose four transformer-based models including spatiotemporal transformers. As a result of performing PM concentration prediction experiments in the waiting rooms of subway stations in Seoul, it was confirmed that the performance of the transformer-based models was superior to that of the existing ARIMA, LSTM, and Seq2Seq models. Among the transformer-based models, the performance of the spatiotemporal transformers was the best. The smart air quality management system operated through data-based prediction becomes more effective and energy efficient as the accuracy of PM prediction improves. The results of this study are expected to contribute to the efficient operation of the smart air quality management system.

Analysis of Geothermal Melting System Conductivity for Improving Road Safety (도로주행 안정성 향상을 위한 지열 융설시스템 열전도 분석)

  • Lee, Seok-Jin;Kim, Bong-Chan;Lee, Seung-Ha;Seo, Un-Jong;Kim, Jin-Han;Lee, Joo-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.1
    • /
    • pp.43-50
    • /
    • 2010
  • Sliding accidents on the road have a high percentage by road freezing, especially, they often have appeared at bridges and Tunnel of freezing areas. Thus, the stability of road operations is enhanced by preventing partial freezing phenomenon. According to the geothermal snow melting system analysis, a pattern of thermal conductivity is found out; pavement materials of concrete and asphalt where the system is buried. The heat transfer simulation is essential when the geothermal snow melting system is applied according to heating exchanger pipe placed in the lower pavements. The model tests are conducted on low temperature in freezer using the manufactured test model which is equal to pavement materials. Many variables are discovered from numerical analyses under the same conditions with model test.

  • PDF

Performance Evaluation of VPN Protocols Using Various Traffic (다양한 트래픽을 이용한 VPN 프로토콜 성능 평가)

  • O, Seung-Hui;Chae, Gi-Jun;Nam, Taek-Yong;Son, Seung-Won
    • The KIPS Transactions:PartC
    • /
    • v.8C no.6
    • /
    • pp.721-730
    • /
    • 2001
  • Nowadays corporation networks are growing rapidly and they are needed to communicate with branch offices. Therefore, a VPN (Virtual Private Network) appears to reduce the cost of access and facilitate to manage and operate the enterprise network. Along with this trend, many studies have been done on VPN. It is important that the performance issues should be considered when VPN protocols are applied. However, most of them are limited on the tunneling methods and implementation of VPN and a few studies are performed on how installation of VPN affects the network. Therefore, in this paper, a testbed is constructed and VPN protocols are installed on it. Real traffic is generated and transmitted on the testbed to test how installing a VPN affects the network. As a result, layer 3 VPN protocol shows lower network performance than layer 2 VPN protocols. And we realize that the combination of L2TP and IPSec is the better method to install VPN than using IPSec only in the aspects of performance and security.

  • PDF

Development of Emergency Restoration Scenarios for Railway Accident using Analytic Network Process (네트워크분석적 의사결정기법을 이용한 철도사고 임시복구시나리오 개발)

  • Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.727-737
    • /
    • 2011
  • The emergency restoration scenarios for efficient railway accident management and restoration were developed. The emergency restoration procedures defined by the worst case of emergency restoration and the important events was proposed based on questionnaires from specialists and the result of survey. Via these studies, the railway accident in the tunnel could be the worst case among all railway accident types. Therefore, educations for a restoration team in confined area condition should be planned and performed to recover the worst case accident. In order for the emergency restoration, when a railway accident is occurred, the restoration should be performed in orders of handing collapse of facilities, burying track, and derailment of vehicle in tunnel based on the statistical analysis. The result of priorities were established by the period of restoration. The standard operation system for efficient railway accident management was developed by synthesizing the worst case for rapid emergency restoration, and important events for the standard operation procedures according to each emergency restoration type. Through this study, the restoration operation system of railway accident are recommended. This paper suggests to develop emergency restoration scenarios for the efficient railway accident management and recovery system. The study results will contribute not only for insuring punctuality, but also for minimizing delays from accidents. Therefore, emergency restoration scenarios will play a major role in the SOP for the damage limitation and the prevention of accident spread.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF