• Title/Summary/Keyword: 용산공원

Search Result 27, Processing Time 0.023 seconds

Characteristics and Meaning of Yongsan Family Park - Based on the Public Records of Seoul - (용산가족공원 조성 과정의 특성과 의미 - 서울시 기록을 중심으로 -)

  • Choi, Hyeyoung;Lee, Sang Min;Gil, Jihye;Kim, Jung-Hwa;Park, Hee-Soung;Seo, Young-Ai
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.1-12
    • /
    • 2023
  • The ongoing Yongsan Park development project began in 1988 with the development of a utilization plan for the US Army base in Yongsan after the Army relocation. This study aimed to draw implications for the Yongsan Park project by focusing on Yongsan Family Park. Among the public records of Yongsan Park and Yongsan Family Park transferred to the Seoul Metropolitan Archives, 53 major records were analyzed. The results are as follows. First, Yongsan Family Park, built on the site of the US Army golf course in 1992, was considered a part of the Yongsan Park plan and holds status as the first phase of the Yongsan Park project. Second, despite its status, Yongsan Family Park opened as a temporary park occupied by urban facilities. A design and detailed roadmap of the development process is necessary to make Yongsan Park more resilient. Third, organizing and systematizing public records is necessary because lessons learned through past park development processes can be applied to the current project. This study is meaningful since it uncovered important issues of urban planning discussed in the process of Yongsan Family Park development through a complete analysis of public records, examined the linkage between Yongsan Family Park, which was not known until now, and the ongoing Yongsan Park project, and reaffirmed the importance of park archiving for long-term development projects.

Critical Success Factors for the Definition Phase of a Construction Program - Focused on the Yongsan Park Development Program - (대형 국책사업의 프로그램 정의단계 핵심성공요인 도출 - 용산공원 조성사업을 중심으로 -)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Hyun, Chang-Taek;Lee, SangHoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.54-63
    • /
    • 2022
  • In order to derive the success factors of a Mega-scale national project, this study conducted a questionnaire survey on experts participating in the Yongsan National Park development program to obtain critical success factors in the program definition phase. AHP analysis was performed for each category through a survey of experts participating in the definition phase of the Yongsan park development program to derive relative importance. The categories were classified into program strategy, process, and people, and the importance between categories was people, strategy, and process in that order. In addition, as for the 27 critical success factors in the program definition phase, the program manager's competency and leadership, environmental and cultural property survey planning, program management plan preparation, operation and maintenance philosophy, and integrated program office showed high priorities. Therefore, in promoting the Yongsan Park development program, we propose a strategy for selecting and focusing on the critical success factors with high priorities in the program definition phase proposed in this study.

An Analysis of Process-oriented Design in the Invited Entries of International Competition for the Master Plan of the Yongsan Park, Korea (용산공원 설계 국제공모 출품작에 나타난 프로세스적 설계 분석)

  • So, Jin;Sung, Jong-Sang;Pae, Jeong-Hann
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.2
    • /
    • pp.11-26
    • /
    • 2013
  • Designing large parks such as Yongsan Park requires the open-ended process-oriented design approach in complex layers rather than the conventional self-completed master plan method. This study aims to examine the characteristics of process-oriented design in the eight invited entries of "International Competition for the Master Plan of the Yongsan Park, Korea"(2012). For this purpose, it analyzed each entry according to three criteria: objects of process-oriented approach, time factor and its features of phasing plan, and presentation method of the process. This analysis can not only critically review the current level of the process-centered design methodology but also suggest strategic future directions for Yongsan Park. The objects of process-oriented design in the eight works were order of physical space development, restoration process of ecosystem, recovering process of publicity, and economic operation and management. Main considerations in the objects were connections to adjacent urban fabrics, links to regional green and water system, reuse of existing buildings and infrastructures in the site. The temporal criteria of the phasing plan had two aspects. One was planning a certain time and period, and the other was just establishing an order of phases. Most of the presentation method of process was the phasing plan, but some of the entries suggested a scenario plan. The eight works of "International Competition for the Master Plan of Yongsan Park" did not attempt process-oriented designs entirely and completely. Rather, they tried to introduce the phasing plan as part of a process-centered design. Also, they took an eclectic approach between master plan and process-oriented design instead of rejecting the conventional master plan approach.

단신

  • Korea Landscape Architecture Tree Association
    • Landscaping Tree
    • /
    • s.89
    • /
    • pp.69-78
    • /
    • 2005
  • PDF