• Title/Summary/Keyword: 용량 선정

Search Result 529, Processing Time 0.033 seconds

Estimating Development Density Constrained by Traffic Congestion in the Downtown, Seoul (교통혼잡을 고려한 서울 도심부 개발가능밀도 추정)

  • Hwang, Kee Yeon;Shin, Sang Young;Kang, Jun Mo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.49-58
    • /
    • 2006
  • The purpose of this study is to develop transportation-sensitive land use densities in a metropolitan context. It analyses traffic impacts according to 20 different development density scenarios in the downtown Seoul, and estimates the density ceiling. The results identify that the transportation-wise sustainable density in the downtown can be extended up to the FAR level of 460% with an option of 2,000 won congestion charge levied on the downtown area. It also finds that the region-wide sustainability measured by congestion level can be improving as the level of congestion charge increases. Without the congestion charge, however, the density ceiling slides down to 430%. It is recommended that, in order to bring in higher density developments in the region, transportation demand management (TDM) measures are indispensible.

A Study on the Flood Limited Level in Agricultural Reservoir Flood Season according to pre-release conditions (사전방류조건에 따른 농업용저수지 홍수기 제한수위 설정에 관한 연구)

  • Yang, Jun Seok;Park, Ki Bum;Ahn, Seung Seop
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.302-302
    • /
    • 2022
  • 최근 태풍, 집중호우로 인한 홍수피해가 빈번히 발생함하고 있다. 특히 상류에 저수지가 있을 경우 홍수조절을 통해 하류지역의 홍수피해를 저감하기도 하지만 급작스런 방류량의 증가 등으로 인해 하류지역의 피해가 증가되는 경우도 있다. 따라서 하류지역 홍수피해 저감을 위해 저수지의 홍수관리기능에 대한 관심도가 높아지고 있다. 대규모 다목적댐의 경우 다양한 저수지운영룰을 통해 수문을 운영하고 있어 홍수조절기능을 충분히 수행하고 있지만, 농업용저수지는 홍수관리에 있어 수문조작 전문성의 부족과 운영룰의 미정립 등으로 인해 취약성을 가지고 있는 상황이다. 본 연구에서는 수문이 설치된 1백만m3이상의 저수지 중 성주저수지를 연구대상저수지로 선정하였다. 비상수문을 통한 사전방류방안과, 저수지운영을 연구하여 농업용저수지의 홍수조절용량 확보를 위한 사전방류방안에 대해 연구하였다. 저수지운영은 Auto ROM을 적용하였고 홍수조절용량 확보를 위하여 홍수기 수위관리기법 중 사전방류기법을 채택하였다. 사전방류기법은 모의기법에 의한 사전방류와 최적화기법에 의한 최적사전방류량을 결정하는 방법으로 연구하였다. 홍수기의 제한수위는 유효저수량의 70%인 EL.179.7m, 65%인 EL.178.8m, 60%인 EL.177.8m로 설정하여 분석하였다. 모의기법에 의한 사전방류방법은 초기수위는 만수위에서부터 1.0m씩 감소하였고, 비상수문은 0.5m씩 개방하여 4.0m까지 개방 하였다. 사전방류의 시간은 24hrs, 48hrs를 적용하였다. 최적화기법에 의한 사전방류방법은 초기수위는 모의기법과 동일하고 목표수위를 제한수위(70%, 65%, 60%)가 되는 최적방류량을 산정하고 최적방류량을 방류할 수 있는 수문의 개방높이를 분석하였다. 2012년, 2020년의 호우사상에 대해 사전방류가 없는 경우와 모의기법, 최적화기법에 의한 사전방류결과를 적용한 경우를 비교하여 검토하였다. 그 결과 제한수위 70%를 유지할 경우 2012년은 모의기법이 5.6%, 최적화기법이 5.4%의 방류량 감소효과가 있으며 2020년은 모의기법이 9.0%, 최적화기법이 8.8%의 방류량 감소효과가 있는 것으로 검토되었다.

  • PDF

A Study on Traffic-Flow Characteristic Changes on Expressway by Visibility (시정거리에 따른 고속도로 교통류 특성 변화 연구)

  • Son, Young-Tae;Jeon, Jin-Sook
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.6
    • /
    • pp.116-126
    • /
    • 2013
  • Weather factor to affect driver's driving environment are due to changes in weather conditions is caused rainfall, snowfall, fog etc and the reducing of road capacity and because deteriorating weather could be affect the headway and vehicle speed and the decrease in lane caused by an accident occurs that was analyzed that bad weather occur congestion greater than on the clear day. Bad weather to reduce of the driver's visibility was analysed the sensitive to changes in travel speed and traffic accident to appears high characteristics according to weather conditions on the expressway(higher speed) than general road. As a result, visibility have been determined to be important factor in changes of the highway traffic flow characteristics. Therefore, in this study, we selected traffic volume and travle speed that have a major impact on high-speed expressway basic segments as importance effect factor and we selected to subject of analysis among the Metropolitan Expressway that it could be obtained certain level of traffic volume data and we studied the changing of expressway traffic flow due to change visibility after the collecting of meteorological and traffic data. In order to perform this study, data collection and analysis methods were established through the existing literature and we had selected level of visibility of the expressway and we had performed the statistical verification. Finally, we had calculated the rate of change of expressway traffic flow characteristics due to visibility and we had come up with a way to apply at capacity and service level analysis.

C00rdinated Testing between transformer Tap Selection and Inverter Voilage Control in the PV Distributed Generation system (태양광 분산 발전 시스템의 계통연계용 변압기탭 선정과 인버터전압조정 협조시험)

  • Yoon, kap koo;CHO, SeongSoo
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1098-1099
    • /
    • 2015
  • ${\bullet}$ 시험대상: 영월태양광 4,990kW(998kW ${\times}$ 5호) ${\bullet}$ 13.07.31 연계기술검토의뢰 ${\bullet}$ 13.08.28 한전검토결과: 인근변전소 영월S/S(40MW) 초과로 10.8km 지점의 평창 D/L 평창간 347호 주진S/S에 다음의 보완대책과 연계 권고 ${\cdot}$ 문제점: 적정전압이탈 및 순시전압변동률 유지불가 ${\cdot}$ 연계기준만족을 위해 한전에서 제시한 보완대책 : 계통용량증설(설비보강), 연계용량 감소 및 전용선로 연계 ${\bullet}$ 14.01.09 분산형설치자의 용역사(에이스기술단)에서 송배전용전기설비 이용규정과 연계기준 만족을 위한 보완대책 제안 ${\cdot}$ 태양광발전시스템 인버터 자동전압(역률/무효전력) 조정기능 및 감시설비 구비 ${\cdot}$ 최적 공통연결점 선정: 분산형전원으로 부터 전기적으로 가장 가까운 영월D/L 영월S/S측에 개폐장치설치 하고 주진S/S 측으로 연계 ${\bullet}$ 14.01.29~06.19 한전(전력연구원)의 유효성 검토 ${\cdot}$ 보완대책 기술적 유효(실증시험 시행 후 시행공문 발송 예정) ${\bullet}$ 14.08.08 송배전용전기설비 이용규정 개정에 따른 협의 ${\cdot}$ 변압기 대당 20MW에서 25MW ${\cdot}$ 변전소 전체 60MW에서 75MW까지 허용 ${\cdot}$ 영월 S/S 측 문곡/영월 D/L 연계 공사 협의 ${\bullet}$ 14.10.04 사용전검사, 한전계통연계운전 시작 ${\bullet}$ 인버터 고정역률(99.9~100%) 운전 시험 ${\cdot}$ 14.11.21 22.9kV 계전기(SEL-751) 5대, 15분 간격 자료저장 ${\cdot}$ SEL-751/USB to RS232C/노트북 15분간격 측정(첨부) ${\bullet}$ 14.03.07 인버터 역률 95.0% 조정 15분간격 측정(첨부) ${\bullet}$ 변압기탭 선정과 인버터전압조정협조시험 계획 ${\cdot}$ 변압기탭을 현장에서 상하 1탭씩 변경 ${\cdot}$ 인버터역률을 인버터공급사에서 원격조정 ${\cdot}$ 22.9kV 보호계전기 SEL-751, 15분 간격 측정 ${\cdot}$ 인버터 370V 계전기 K-PAM DG3000/현장감시설비 연계 ${\cdot}$ 15분 간격 측정 저장 ${\cdot}$ 현장감시설비/인터넷 연결 원격측정(첨부예정)

  • PDF

A Study on Low-flow Frequency Analysis Using Dam Inflow (댐 유입량 자료를 이용한 갈수빈도해석에 대한 연구)

  • Jung, Younghun;Nam, Woo Sung;Shin, Hongjoon;Heo, Jun-Haeng
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6B
    • /
    • pp.363-371
    • /
    • 2012
  • In this study, the low-flow frequency analysis was performed to determine the low-flow standard of dam maintenance flow for Hwacheon and Chuncheon dams. For this purpose, two methods (case 1: low-flow frequency analysis using the monthly inflow data of the specified return periods, case 2: low-flow frequency analysis using the difference of monthly accumulated inflow) were applied. As a result, it is found that the monthly inflow data of the return periods by reflecting the statistical characteristics of Hwacheon and Chuncheon dams can be utilized to determine the standard of maintenance flow or water level.

기획특집 - T.A.B. 수행절차 및 수행 계획

  • An, Jeong-Ho
    • 월간 기계설비
    • /
    • s.232
    • /
    • pp.50-70
    • /
    • 2009
  • T.A.B란 공기조화설비에 대한 종합시험조정으로 시험, 조정 및 균형(Testing, Adjusting & Balancing)이라는 뜻이다. 이는 설계 목적에 부합되도록 모든 빌딩의 환경시스템을 검토하고, 조정하는 과정이다. 따라서 T.A.B기술은 공기 및 물이라는 유체의 흐름과 온 습도에 관련된 분야이기 때문에 시각적으로 그 성과를 알아보기 힘들고, T.A.B를 적용한 후 결과치를 정밀 분석해 판단할 수 있으며 T.A.B기술을 적용하지 않은 건물과 간접비교하는 방법으로 그 효과를 쉽게 알 수 있다. T.A.B기술을 적용할 경우 시공 중인 건물에 설계도서가 완료되기 전, 또는 장비의 구매발주 전에 T.A.B측면에서 모든 기술 도서를 면밀히 검토하게 된다. 그 중 일부에서 발견되는 문제점들 즉, 적정치 못한 용량 선정, 시스템 구성상 미비점, 불필요한 장비 선정, 누락 사항을 발견할 수 있다. 따라서 T.A.B 기술을 적용할 경우 향상된 품질의 시공이 가능해 준공 후 빈번히 대두되는 하자 문제가 현격히 줄게 되며 또한 운전경비 절감, 쾌적한 실내환경 조성, 장비수명 연장 등 효율적인 운전관리 효과를 얻을 수 있다. 우리나라 공기조화설비기술은 꾸준한 발전을 이루었고, 최근에는 도입 초기단계시 전혀 고려되지 않던 공조공간의 쾌적성 및 소음 방지 대책 등의 문제가 주요사항으로 부각되고 있다. 이에 따라 공조설비에 T.A.B실행의 표준화 정착과정에 있으며, 국내 학계 및 연구기관에서 공조설비에 대한 연구 및 T.A.B용역업체의 기술축적 등 T.A.B분야 발전을 위해 노력하고 있다. 본지는 T.A.B의 수행절차 및 수행계획, TAB 수행업체 등에 대해 알아본다.

  • PDF

A Case of Analysis of Constructed Wetland Using Geographic Information System (GIS를 활용한 천변저류지 적지분석에 관한 연구)

  • Ha, Sung Ryong;Lee, Jae Yil
    • Journal of Wetlands Research
    • /
    • v.8 no.1
    • /
    • pp.107-112
    • /
    • 2006
  • This study aim is to establish the suitability analysis of a constructed wetland using Geographic Information System. A constructed wetland is a flood control reservoir that is able to control flows and conserve a preserving integrity of nature maximum. It has been did that DB construction of flood area, socioeconomic analysis, and space analysis using GIS. Achieved reiteration arithmetic function from results of several elements, it has been did analysis for possibility space of constructed wetland. Through the analysis of flood area and a constructed wetland capacity, it has been established the estimation where is possible to build wetland. This study is applied suitability analysis method where has been choose the basin of To-Phyeong river in Kyongsang-namdo with methodology presentation about suitability analysis.

  • PDF

Optimum Dimension Selection of Onshore Wind Power System Using Economic Analysis and Numerical Optimization Technique (풍력발전 경제성 분석과 수치최적화방법을 이용한 육상풍력발전시스템 크기 최적선정 연구)

  • Lee, Ki-Hak;Park, Jong-Po;Lee, Dong-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.36.1-36.1
    • /
    • 2011
  • 풍력개발 기술이 발전함에 따라 풍력발전시스템이 점차 대용량화되는 추세이며, 경제성 있는 풍력단지 건설을 위해 점차 대단지화 되어가고 있는 실정이다. 이로 인해 풍력 발전단가(Cost of electricity, COE)도 개선되고 있다. 풍황이 양호한 풍력발전단지의 경우, 풍력발전 COE는 현재 50~60원/kWh 수준으로 타 신재생에너지원에 비해 경쟁력이 높고, 석탄 화력의 COE와 비교해 봐도 동등한 수준 혹은 더욱 경쟁력 있는 수준으로 감소하였다. 풍력발전단지 조성을 위해서는 시스템의 효율과 고효율, 저비용의 풍력발전시스템을 풍황이 좋은 지역에 설치할 때 낮은 COE를 가지는 경제성 있는 발전단지가 가능하다. 동급 용량 풍력발전시스템을 같은 지역에서 설치하여 에너지생산량을 증대시키기 위해서는 블레이드 지름의 증가시켜 유량을 증가시키거나 타워의 높이를 증가시켜 풍속을 증가시키는 방안이 있다. 이 경우 블레이드 길이와 타워 높이 증가에 의한 시스템 비용의 증가가 발생하는데, 에너지생산량 증가에 의한 수익비용과 시스템 비용 증가에 의한 자본비용은 서로 반비례로 영향을 미친다. 이를 위해 최소의 COE의 최대의 순현재가치(Net Present Value, NPV)를 갖는 목적함수로 두고 블레이드의 최적 길이와 타워의 최적 높이를 선정하였다.

  • PDF

Advanced Wastewater Treatment Status of Sewage Treatment Plants and Improvement Methods (하수종말처리시설 고도처리현황 및 개선방안)

  • Moon, Sun-Jung;Choi, Pill-Gyu;Choi, Ick-Hoon;Park, Jae-Young
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1174-1178
    • /
    • 2007
  • 본 연구는 다양한 공법으로 설치 운영되고 있는 고도처리시설에 대한 처리효율 및 운영현황을 조사하여 고도처리공법 선정시 활용할 수 있는 기초자료를 제공하고, 각 공법별 현장적용 및 운영상 문제점을 파악하여 하수처리시설 운영의 효율성을 도모하기 위한 목적으로 실시하였다. 6개월 이상 운영 중인 하수종말처리시설 145개소를 대상으로 일반적 현황을 분석하고 실제 현장조사는 고도처리시설 37개소의 현장조사표를 중심으로 실시하였다. 고도처리 공법은 $A_2O$계열, SBR계열이 대부분을 차지하였으며 대규모처리장은 $A_2O$계열, 소규모처리장은 SBR계열이 주로 적용되었으며 대규모 하수처리시설일수록 유입수질의 농도 및 처리효율이 높고 톤당 시설설치비용과 유지관리비용이 적었다. 현장조사 결과, 첫째, 하수처리시설의 유입문제로 시설용량대비 하수유입량이 초과되거나 50%미만인 시설이 10개소로 조사되었다. 이에 따라 하수관거의 조속한 정비 및 인구감소에 따른 대책수립, 효율적인 운영을 위한 하수처리시설 증설 및 계열 축소운전이 필요하였다. 둘째, 각 처리공법별로 몇몇 문제점이 있어 공법사의 문제점 보완, 운영기술전수 및 원활한 A/S가 필요한 것으로 나타났다. 셋째, 운영관리자가 수시로 현상을 파악하고 주의하여 운전해야 하는 것으로 나타났다.

  • PDF

수치모형실험을 활용한 조류발전단지의 후류 특성에 관한 연구

  • Jeong, Hae-Chang;Kim, Bu-Gi;Kim, Jun-Ho;Yang, Chang-Jo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.05a
    • /
    • pp.193-194
    • /
    • 2018
  • 최근 정부의 RPS(신재생에너지 의무할당제, Renewable Energy Portplio Standard) 확대 시행과 신재생 3020 정책에 맞물려 정부뿐만 아니라 기업체의 신재생에너지 발전설비용량과 발전량의 확대가 요구되는 시점이다. 특히 조류에너지는 환경친화적이며 지속가능한 에너지원으로서 그 관심이 더욱 커지고 있다. 그러나 조류발전 후보지는 유속이 매우 빠르고, 설치가 어려워 그에 따른 제반사항들이 다른 에너지원에 비해 상대적으로 많다는 단점이 있어, 조류발전단지 구축 시에는 후보지를 선정하고 타당성 조사를 수행하는 과정이 매우 중요하다. 따라서 본 논문에서는 최대의 조류에너지를 얻을 수 있는 해역을 선정하여 조류발전단지를 설계하고 후류의 특성을 분석하였다. 먼저 전자해도의 상세 수심 자료를 추출해 상용 프로그램인 ADCIRC 프로그램에 실제 지형을 수치 모형화하였고, 잠재적 에너지 분포가 높은 해역에 1MW급 수평축 조류발전 터빈을 설계하여 적용하였다. 또한 조류발전단지 내의 터빈의 배치 방법(Centered, Staggered Layout)에 따른 후류의 특성을 분석하여 연간 전력 생산량을 계산하였다.

  • PDF