• Title/Summary/Keyword: 용량 산정

Search Result 763, Processing Time 0.027 seconds

A Study on the Method to Evaluate Minimum Capacity of Energy Storage System(ESS) for Micro-Grid Design (마이크로그리드(MG)의 설계를 위한 에너지저장장치(ESS)의 최소용량산정 기법에 관한 연구)

  • Lee, Jae-Gul;Shin, Jeong-Hoon;Choy, Young-Do;Nam, Su-Chul;Kim, Tae-Kyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.10
    • /
    • pp.52-58
    • /
    • 2009
  • In this paper, we propose a probability method to determine minimum capacity of energy storage system(ESS) for Micro-grid Because of high capital cost of ESS, It's very important to determine optimal capacity of ESS and for stable operation of Micro grid(MG), we should determine minimum capacity of ESS. The proposed method has abilities to consider forced outage rate of generators and intermittent of non-dispatchable generators and minimum capacity make MG keep energy balancing by oneself.

Estimation of Annual Runway Capacity for Jeju International Airport Considering Aircraft Delays (항공기 지연시간을 고려한 제주국제공항 활주로 연간용량 산정)

  • Park, Jisuk;Yun, Seokjae;Lee, Youngjong;Baik, Hojong
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.2
    • /
    • pp.214-222
    • /
    • 2015
  • Jeju International Airport has become the most delayed airport in Korea, due to increased demand in air passengers and unexpected local weather condition. Observing the demands continuously grow for a decade, the airport is expected to be saturated in the near future. As a part of effort to prepare effective and timely measure for this expected situation, airport planners seeks the annual runway capacity, i.e., the appropriate number of flight operations in a given year with tolerable delay. In practice, the FAA formula is frequently adopted for the capacity estimation. The method, however, has intrinsic issues: 1) the hourly capacity imbedded in the formula is not clearly defined and thus the estimated value is vulnerable to be subjective judgement, and 2) the formula doesn't consider aircraft delay resulted from runway congestion. In this paper, we explain a novel method for estimating the daily runway capacity and then converting to the annual capacity taking into account the aircraft delay. In this paper, average delay of aircraft was measured using microscopic air traffic simulation model. Daily capacity of the runways were analyzed based on the simulation outputs and the method to assess the yearly capacity is introduced. Using a microscopic simulation model named TAAM, we measure the average aircraft delay at various levels of flight demand, and then estimate the practical daily runway capacity. The estimated daily and annual runway capacities of Jeju airport are about 460 operations a day which is equal to 169,000 operations year. The paper discusses how to verify the simulation model, and also suggests potential enhancement of the method.

Standard-Rainfall and Capacity of Intercepting Sewer to Control CSOs (CSOs 제어를 위한 기준강우 및 차집 용량 산정)

  • Lee, Jung-Ho;Joo, Jin-Gul;Kim, Joong-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.1
    • /
    • pp.129-135
    • /
    • 2008
  • The combined sewer overflows(COSs) which enters to river are involved with water pollution of rivers. Therefore, the standard capacity should be decided in proper standard considering water pollution density and characteristic of outflow. But in domestic, the standard capacity is not considered the characteristics of rainfall-outflows and is applied uniformly in all areas. The standard is triple of a maximum amount of sewage per one hour ; 3Q. The outflow of 3Q enters to sewage treatment plant and the overflows enter to river. In this study, a standard rainfall is estimated to determine the capacity of intercepting sewer by statistical analysis of rainfall data and it is considered about the regional characteristic of the rainfall-outflow. The standard rainfall is analyzed through the data of Seoul. In the result the standard rainfall was 6.76mm of 4hr duration. The rainfall-outflows and CSOs are analyzed using SWMM(Storm Water Management Model).

Safety estimation of check dam in Muju region according to debris yield (토사유출에 따른 무주지역 사방댐의 안전성 평가)

  • Kwon, Hyuk Jae;Kim, Hyeong Gi
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.11
    • /
    • pp.915-924
    • /
    • 2021
  • In this study, the probability of exceeding capacity for 4 check dams in Muju mountain region have been estimated. From the results, optimum design of check dam and safety according to wild fire have been discussed. Reliability model has been established by using MSDPM for calculating debris yield to estimate the probability of exceeding capacity of check dam. Probability of exceeding capacity for 4 check dams has been estimated according to maximum rainfall intensity of return periods (10year, 50year, 100year, and 200year). It was found that 1 check dam of Samga-ri basin and 1 check dam of Jeungsan-ri basin were designed by overestimation and 61% and 47% of capacity should be reduced, respectively. Furthermore, probability of exceeding capacity according to burned area has been estimated and compared. It was found that check dam of Sanga-ri basin is the weakest for the wild fire effect in this study area.

On the Estimation Techniques of Hurst exponent (허스트 지수 산정 방법에 대한 고찰)

  • Kim, Byung-Sik;Kim, Hung-Soo;Seoh, Byung-Ha
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.12
    • /
    • pp.993-1007
    • /
    • 2004
  • There are many different techniques for the estimation of the Hurst exponent. However, the techniques can produce different characteristics for the persistence of a time series each other. This study uses several techniques such as adjusted range, resealed range(RR) analysis, modified restated range(MRR) analysis, 1/f power spectral density analysis, Maximum Likelihood Estimation(MLE), detrended fluctuations analysis(DFA), and aggregated variance time(AVT)method for the Hurst exponent estimation. The generated time series from chaos and stochastic systems are analyzed for the comparative study of the techniques. Then this study discusses the advantages and disadvantages of the techniques and also the limitations of them.

Report on construction cost of preliminary power facilities (정전대비 비상발전시스템 구축에 관한 경제성 평가)

  • Nam, Su-Hyun;Jung, Won-Sik;Moon, Hyung-Jun;Moon, Young-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.626-627
    • /
    • 2011
  • 본 논문은 전기연구원에서 수행한 1차년도 조사인 수용가별 정전비용 산정에 대한 자료를 바탕으로 각 수용가별 적정 예비전원 설비 구축비용의 산정에 대해 논의하고자 한다. 각 수용가별 적정 예비 전원설비비용을 산정하기 위해 우선적으로 정전 시 수용가가 필요로 하는 예비전력량과 평균 정전시간에 대해 조사될 필요가 있다. 본 논문에서는 1차년도 조사 자료를 바탕으로 수행되었기 때문에 1차년도 자료에서의 사용전력량 전체를 예비전력량으로 계산하도록 하였다. 각 수용가별 예비전력량으로부터 설치될 UPS 용량과 비상발전기 용량을 선정한다. 평균정전시간은 각 수용가별로 조사된 정전시간으로부터 평균값을 구하여 절상하도록 하였다. 선정된 UPS 용량과 비상발전기 용량으로부터 설치비용을 계산한다. 본 과제에서는 2011년 표준품셈과 2011년 시중노임단가를 참고로 설치비용을 계산하였다. 산출된 수용가별 설치비용과 이전에 조사된 정전비용으로부터 회수기간을 구하였고, 이 값을 지표로하여 각 수용가별 예비전원설비에 대한 타당성을 판단하였다.

  • PDF

Estimation of Optimal Reserves for Multi-purpose Reservoirs in Nakdong River Basin Using Reservoir System Operation (댐 연계운영을 이용한 낙동강유역 다목적댐의 예비율 산정)

  • Chae, Heechan;Ji, Jungwon;Shin, Heejae;Lee, Eunkyung;Yi, Jaeeung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.393-393
    • /
    • 2019
  • 국내의 가뭄피해 사례를 보면 1990년 이후 5~7년 주기로 극심한 가뭄이 발생하고 있는 것을 확인할 수 있다. 특히 2014~2015년에 발생한 가뭄으로 인해 보령댐, 횡성댐, 용담댐에서 역대 최저 저수율을 기록하기도 했다. 기후변화로 인해 가뭄의 발생빈도는 더 짧아지고 강도는 더 증가할 것으로 예상됨에 따라 수자원장기종합계획에서는 기후변화에 따른 극한가뭄 대처 방안 중 하나로 용수공급 예비율의 도입이 필요하다고 언급한 바 있다. 국내 대부분의 다목적댐은 용수공급에 이용되는 이수용량 외에 비상시 활용 가능한 비상용량을 확보하고 있다. 비상용량은 평상시에는 용수공급 목적으로 사용되지 않는 것을 원칙으로 하지만 가뭄과 같은 비상시에는 용수공급에 기여할 수 있는 비상용수로 사용할 수 있다. 하지만 비상용량에 대한 명확한 활용방안이 없어 이를 활용하지 못하고 있는 실정이다. 본 연구에서는 다목적댐의 비상용량을 활용한 용수공급예비율 개념을 도입하고, 낙동강수계 내 다목적댐을 대상으로 적정 예비율을 산정하여 예비율 확보에 따른 용수공급능력의 향상 효과를 분석하여 비상용량의 활용 방안을 제시하고자 한다. 적정 예비율 산정을 위해 낙동강 유역내 6개 다목적댐(안동, 임하, 군위, 김천부항, 합천, 밀양)을 대상으로 저수지 모의운영을 실시하였다. 저수지 모의운영 시 댐 연계운영을 실시하여 수계내 조절점을 기준으로 상류 댐의 수문상황에 따라 방류량을 배분하였다, 또한 기후변화의 영향을 고려한 적정 예비율 산정을 위해 APEC 기후센터에서 생산한 일단위 수문시나리오 자료를 유입량 자료로 이용하였다.

  • PDF

Capacity of Urban Freeway Work Zones (도시 고속도로 공사구간 용량 산정)

  • Lee, Mi Ri;Kim, Do-Gyeong;Kim, Hyo-Seung;Lee, Chungwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1123-1130
    • /
    • 2013
  • This paper aims to estimate work zone base capacity by the number of lanes for urban freeway. To do this, data were collected from the field survey and the database system maintained by traffic control center, and analyzed with four different methods such as the average maximum observation flow rate, headway, regression analysis, and parameter inspection. The work zone base capacity for urban freeway is estimated based on the average maximum observation flow rate and headway method, which are more reliable methods compared to others. The average capacity is 1,650pcphpl when the design speed is 80km/h. The capacity of four lanes one-way work zones was about 1,700pcphpl, while one of 2 lanes one-way work zones was about 1,600pcphpl. The capacity reduction rates for each are 0.15 and 0.2, respectively. The smaller the number of lane is, the more base capacity is reduced. For verification of results, we estimate the capacity by simulation analysis using PARAMICS, and compare with analytical results by a statistical method. This research can be used for efficient and systemic management of work zone in the urban freeway.

A Study on Estimating Emergency Water Supply Benefits by Dam (댐에 의한 비상용수 공급편익 산정 방안 연구)

  • Yoon, Seul-Ki;Kim, Gil-Ho;Yeo, Kyu-Dong;Shim, Myung-Pil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1540-1544
    • /
    • 2008
  • 최근 기후변화의 영향일 것으로 추정되는 이상가뭄의 발생빈도가 잦아지는 상황에서 이에 대한 대비책으로서 댐의 비상용량을 비상용수로 공급하는 방안이 조심스럽게 제기되고는 있으나 현재까지 국내에서는 비상용수에 대한 명확한 정의조차 제시되지 않는 등 다소 생소한 개념이라고 할 수 있다. 본 연구는 비상용수 공급의 국내 외 사례와 비상용수 공급편익 산정에 관한 국내 외 연구를 검토하여 댐에 의한 비상용수 공급의 가능성과 가치를 평가하는 것을 목적으로 한다. 비상용수의 수요는 정기적으로 발생하지 않는 특수한 경우이고 용수공급을 대체할 만한 대안이 거의 없는 극한 상황에서 발생한다. 그러므로 생 공용수의 편익산정 방법에 일반적으로 이용되는 대체시설비용법과 같은 편익산정 기법을 적용하는 것은 여의치 않을 것으로 판단된다. 그리하여 본 연구는 비상용량이 사용될 때의 갈수빈도와 갈수피해액의 관계를 설정하고 피해경감액을 추정함으로써 연평균 편익을 산출하는 방안을 검토하는 방안을 제안하고자 한다. 비상용수 공급편익의 합리적인 계량화하기 위해서는 적절한 이수안전도의 설정과 이에 따른 이수기능의 평가가 선행되어야 한다. 그러나 아직까지 갈수규모에 따른 비상용수 공급편익의 산정방법에 대한 명확한 기준이 마련되지 않은 실정이다. 따라서 향후 비상시 댐의 이수기능을 최대한 활용하고 이에 대한 올바른 가치평가를 위해서도 관련분야에 대한 기초연구가 시급히 이루어져야 할 것이다.

  • PDF