• Title/Summary/Keyword: 열차 운영 계획

Search Result 41, Processing Time 0.024 seconds

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF

The Study on the Situation and Development of High Speed Rail in Each Countries (각국의 고속철도 현황과 발전에 관한 연구)

  • Lee, Yong-Sang
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.6
    • /
    • pp.109-122
    • /
    • 2003
  • 우리나라는 2004년 4월 경부고속철도개통을 앞두고 마지막 준비를 하고 있다. 1964년10월 고속철도를 가장 먼저 개통한 일본을 비롯한 프랑스, 독일 등은 이미 고속철도가 철도교통의 중심은 물론 각국의 교통수송에 높은 비중을 차지하고 있다. 2001년에 일본이 경우 1일 773,951명을 수송하고 있으며, 프랑스는 228,714명을 수송하고 있다. 세계적으로도 고속철도는 2000년 현재 유럽이 15,350km, 아시아는 2,152,9km를 운영 중에 있는데 이는 2010년에는 유럽은 41,350km, 아시아는 4,755.7km로 증가될 전망이다. 특히 아시아는 2005년 10월 개통예정인 대만의 타이페이와 카오슝의 345km를 비롯하여, 중국은 상해~북경의 1,330km를 2008년 ㅂ구경올림픽에 맞추어 개통을 준비하고 있다. 일본, 프랑스, 독일 등 고속철도의 운영국가들은 고속철도수송의 수송량이 급격하게 증가하고 있다. 프랑스는 인기준으로 1996년에 비해 2001년에 49.3%, 독인은 1996년에 비해 2001년에 70.1%의 증가치를 보이고 있다. 철도수송에서의 고속철도의 비중도 높아 인${\cdot}$km기준으로 일본은 29%, 프랑스는 48.3%, 독일은 15.9%를 차지하고 있다. 이러한 고속철도가 발전한 요인은 항공기와도 경쟁이 될 정도의 빠른 속도와 안전, 높은 사회경제적 효과에 기인하고 있다. 고속철도의 비중이 높은 일본의 경우는 개통 이래 현재까지 약 62억명을 수송하고 있는데 사망사고는 한건도 없었다. 또한 1개 열차의 정시도착 오차는 24초에 불과하고, 항공기와도 경쟁력이 될 정도의 속도와 수송능력을 보유하고 있다. 실제로 500~700km구간에서 항공기와 고속철도이 경쟁이 치열한데 고속철도의 분담율이 67%를 차지하고 있다. 이러한 고속철도 발전으로 철도수송의 증가율에도 큰 영향을 미치고 있다. 프랑스와 독일의 경우는 자동차수송보다 철도수송이 최근 4년간 약 10%이상 증가하고 있는 것도 고속철도의 영향에 기인하고 있다. 고속철도의 또 다른 특징으로는 높은 유발수요효과로 일본의 신간선개통전후를 비교해 보면 예상치보다 약 6%~23%의 높은 수요유발효과를 보이고 있다. 이 결과 각궁의 고속철도는 매우 높은 수익성을 기록하고 있는데 일본은 개통 후 3년째 흑자를 기록하였고, 중국도 개통 후 7년에 단년도 흑자를 예상하고 있다. 이러한 고속철도의 발전에 기초해 유럽을 비롯하여, 아시아 등에서 고속철도의 건설이 더욱 가속화 될 것으로 예상되는데, 이러한 새로운 변화의 고속철도시대에 대비하여 우리나라도 장차 건설계획수립, 해외수출, 고속철도의 상호운영 등을 지금부터 계획을 수립하여 집행해야 할 것이다.

A Study of the Effect of the KTX Mulgeum Station Stop on Railroad Users in Yangsan City (KTX 물금역 정차 확정이 양산시 철도 이용자에게 미치는 영향에 관한 연구)

  • Choi, Yang-Won;Jang, Jae-Suck;Suh, Jeong-Yeal
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.527-536
    • /
    • 2022
  • The purpose of this study is to predict changing traffic environments and related economic effects by reflecting the changed KTDB and socio-economic indicators pertaining to Mulgeum station, a general railway stop, when it is confirmed as a KTX stop. To analyze the data of this study, socioeconomic indicators and the general status of transportation facility operations were investigated with reference to related statistical data, centered on the country overall and on Yangsan city in particular. In addition, we investigated and referenced the railroad facility construction plan and train operation plan, which are national high-level plans related to land development and transportation network construction. Currently, there are only ITX trains (4 times/day) and Mugunghwa trains (29 times/day) that stop at Mulgeum station in Yangsan, meaning that passengers cannot use KTX trains in the Yangsan area. In particular, the need for a KTX stop at Mulgeum station has been continuously raised because train users in the Yangsan area have inconvenient transportation in that they must travel 40 minutes to Ulsan station or 30 minutes to Gupo station to use the KTX. As a result of analyzing railroad transportation demand that will change in the future as the KTX stop at Mulgeum station is confirmed, the number of passengers boarding and arriving at Mulgeum station is predicted to be 1,674 passengers/day by 2025. In addition, the numbers of train passengers that are converted from Ulsan and Gupo stations due to the stop at Mulgeum station are predicted to be 594 passengers/day boarding and 562 passengers/day arriving by 2025. In the future, if Yangsan citizens use the KTX Mulgeum station, the access time to Mulgeum station can be shortened to 22 minutes from 65 minutes, and it is predicted that the inconvenience of transferring between railroads will be resolved, with the waiting time for transfers reduced by up to a maximum of 40 minutes. Therefore, the economic effect of creating a KTX stop at Mulgeum station was analyzed to be B/C=1.823 when general railroad operating costs are not taken into account and B/C=2.127 when general railroad operating costs are considered. In conclusion, when using KTX trains to visit the Seoul Metropolitan Area, it takes 2 hours and 43 minutes to use Mulgeum station without using Ulsan station or Gupo station, which is considered to be very effective for reducing travel times and improving the economic feasibility of this development; it is also expected that Yangsan city will be able to improve accessibility and mobility to the Seoul Metropolitan Area by breaking free from the disgrace of being a remote location given its link to KTX in the future.

The Operation Conditions of Domestic Railway Wireless Communication Network and Those Technical Trends (철도 무선통신 기술동향 및 국내 운용현황)

  • Kim, Bum-Gon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.4
    • /
    • pp.379-386
    • /
    • 2016
  • As well as to operate a high-speed rail, our country with capability to produce high-speed train has developed a number of techniques, such as for a riding comfort improvement, automatic diagnosis for major electrical or mechanical parts, on board measurement for catenary systems and noise reduction of running rolling-stocks are still under development. In this paper, we describe the current status of operation technologies not only traditional railway wireless communication systems but also Long Term Evolution systems which would be deployed as soon as possible, like as in Europe, China and the United States. In addition, we produced the domestic wireless communication networks for railway which KORAIL Corp. has been operating and the schemes and the plans of HSR field test for the fourth generation mobile communication which should be enforced by national research and development.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

The Strategy for Interconnection Branch Line Construction used Optimization Program (최적화 기법을 적용한 효율적인 철도 연결선 구축 전략)

  • Kim, Yong-seok;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.853-858
    • /
    • 2019
  • One of the methods which can enhance the efficiency of railroad network is construction of interconnection branch line for several route to share one railway. In Korea, this method already has been implemented or excuted as project level. This study suggests a network design model and a solution algorithm to choice most proper site to construction it and determine the priority of branch lines which can be considered in planning level, not project level. The model is a non-linear optimization program which minimize total cost-construction cost, operating cost and passengers' travel cost. The decision variables are a binary variable to explain whether construction or not and its direction and a integer variable of the frequencies of travel routes. The solution algorithm-problem solution and route choice and also the result of implementation for example network are suggested. This result can be more advanced after application in real network and calibration of parameters.

The Study on the Situations and Analysis of Rail Freight in Japan and Policy Implication (일본철도화물수송의 현황분석 및 정책적 시사점)

  • Lee, Yong-Sang
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.2 s.73
    • /
    • pp.177-193
    • /
    • 2004
  • 최근의 화물자동차파업사태 등으로 우리나라 물류체계의 경쟁력제고를 위한 여러 가지 논의가 진행되고 있다. 그 중에서도 환경친화적이며, 사회적 비용이 저렴한 철도화물의 수송분담율을 높여야 한다는 의견이 많이 나오고 있다. 우리나라 물류체계의 근본적인 문제점은 도로운송량의 증가보다 트럭의 공급과잉으로 트럭운송사업자의 수익은 매우 낮고, 철도, 해운 등 대량운송수단의 분담율이 낮아 전체적인 수송효율성이 낮은 것을 들 수 있다. 이러한 문제점의 해결은 트럭의 과잉공급을 억제하고, 제조업 물류비 중 46.5%를 점하고 있는 운송비용을 절감하는 것이 핵심적인 방안이라고 하겠다. 이에 본 논문에서는 철도화물의 활성화와 우리나라의 철도구조개혁의 성공적인 추진을 위해서 우리와 지형조건이 비슷하고, 1987년에 철도민영화를 시행하여 현재 16년이 경과한 일본철도화물의 현황을 분석하여, 현재까지의 문제점을 밝히고 또한 우리나라의 철도화물수송정책에 시사하는 바를 정리해 보았다. 1987년 민영화 이후 일본철도화물수송현황을 보면 영업거리, 화차대수를 포함한 수송능력 감소로 수송량은 감소하였으나, 화물수송의 장거리와 추세와 컨테이너수송량의 증가, 인력감축으로 영업성적은 전반적으로 향상되고 있다. 문제점으로는 경영면에서는 낮은 생산성 그리고 노후장비 등으로 인한 높은 설비투자비지출, 선로사용료 등의 부담 등이 지적되었다. 운영상에서는 현재 선로를 소유하지 못하여 네트워크가 부족하여 자유로운 열차편성이 어렵고, 포워더 기능이 없어 현재 전체물량의 85%를 점하는 소운송구간에서 다른 운송주체간의 수송으로 일관수송서비스에 어려움이 있으며, 직접적인 영업을 하지 못하여, 새로운 수요창출에 어려움이 있다. 이러한 문제점의 해결책으로는 먼저 정부의 인프라에 명확한 책임분담과 이에 따른 지원이 필요하다. 이와 같은 철도화물활성화의 정책수립필요성의 배경에는 철도화물수송이 효율성과 환경친화성, 높은 안전성 등 사회적 비용을 감소시키는 장점을 가지고 때문이다. 철도화물운송회사도 현재의 수송기능과 함께 포워더로서의 기능을 가져야 할 것이며, 운임인하노력과 속도향상을 위한 노력을 계속하여야 할 것이다.

A Service Network Design Model for Rail Freight Transportation with Hub-and-spoke Strategy (Hub-and-spoke 운송전략을 고려한 철도화물서비스 네트워크디자인모형의 개발)

  • Jeong, Seung-Ju
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.3 s.74
    • /
    • pp.167-177
    • /
    • 2004
  • The Hub-and-spoke strategy is widely used in the field of transportation. According to containerization and the development of transshipment technology, it is also introduced into European rail freight transportation. The objective of this article is to develop a service network design model for rail freight transportation based on the Hub-and-spoke strategy and efficient algorithms that can be applied to large-scale network. Although this model is for strategic decision, it includes not only general operational cost but also time-delay cost. The non-linearity of objective function due to time-delay factor is transformed into linearity by establishing train service variables by frequency. To solve large scale problem, this model used a heuristic method based on decomposition and three newly-developed algorithms. The new algorithms were examined with respect to four test problems base on the actual network of European rail freight and discussed the accuracy of solutions and the efficiency of proposed algorithms.

Study on Establishing Comprehensive Management Measures to Ensure Stability of Existing Metro when Constructing Ground Structures Adjacent to Subway (지하철 인접 지상구조물 설치시 기존 지하철 안정성 확보 위한 종합관리대책 수립 연구)

  • Jae-Hong Lim;Guk-Hwan Cho
    • Tunnel and Underground Space
    • /
    • v.34 no.3
    • /
    • pp.196-207
    • /
    • 2024
  • In this study, a comprehensive management plan was proposed to ensure the stability of the existing subway when constructing ground structures adjacent to the subway. In the first step, the measurement inspection cycle is selected through proximity evaluation, in the second step, the stability of existing subway and station structures such as displacement and stress is reviewed through 3D numerical analysis considering the construction stage and groundwater influence, and in the third stage, the safety of train operation was reviewed by examining the track stability, and based on the numerical analysis results in the fourth stage, the displacement concentration section was selected as an intensive management section and it was proposed that intensive measurement management be performed.

A Study on the Development of a Route Capacity Calculation Model for Improving Railway Operation Efficiency (철도 운행효율성 향상을 위한 노선용량 산정모형 개발에 관한 연구)

  • Kim, Bong-Jun;Kim, Si-gon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.75-83
    • /
    • 2021
  • Over-urbanization has contributed to the increase in traffic problems. This makes the need for effective road planning and design more important than ever. I have been able to learn how to build a new road, and how to use it. However, in spite of the importance of good road planning, there are no systematic standards or methods for calculating traffic volume on railroad routes. Therefore, in this study, to strengthen the competitiveness of railroads, the concept of line capacity is introduced to railroads, and a clear standard and method for calculating railroad line capacity are presented. Based on the results, the line capacity of main railway lines for domestic railways was calculated. By applying the method of calculating the line capacity presented in this study, the capacity of existing railway lines and newly expanded routes can be calculated. It is expected that our findings will be able to provide systematic standards that can be applied to yield a more effective investment and design planning stage; the findings will also help improve the efficiency of railroad operation.