• Title/Summary/Keyword: 열차진동

Search Result 294, Processing Time 0.025 seconds

A Measurement and Analysis on the Noise of 'Mugungwha' Train (무궁화 열차의 소음 측정 및 분석)

  • 신민철;왕세명;조준호;김대성
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.394-399
    • /
    • 2004
  • Train is one of the most famous and convenient transporting ways. However, the noise problem caused by the train hinders people from living in a silent environment. Furthermore, this problem is related with the environmental rights of people nearby the railroad. The estimation of train noise is the pre-research of train noise reduction. This research is about measurement and analysis of train noise which can be a base-study about the estimation of train n(lise. The noise of ‘Mugungwha’ train, the most frequently used train in Korea, is the main object in this measurement and analysis. The characteristics of the train noise were evident in the criteria of height, distance and velocity. Furthermore, the noise differences between locomotive and passenger coach were observable.

  • PDF

Wave Propagation on a High-speed Railway Embankment Using a Pile-slab Structure (파일슬래브구조가 적용된 고속철도 토공노반에서의 진동 전파)

  • Lee, Il Wha;Lee, Sung Jin;Lee, Su Hyung;Lee, Kang Myung
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.4
    • /
    • pp.278-285
    • /
    • 2013
  • The suppression of residual settlement is required on earthwork sections as concrete track is introduced. Use of pile-slab structure is one of the settlement restraining methods applied on soft ground. The slab distributes the upper embankment load and piles transfer the load from the slab to the stiff ground. While this method is very effective in terms of load transfer, it has not yet been established for dealing with the vibration transfer effects and interaction characteristics between a structure and the ground. It is possible that vibration caused by a moving train load is propagated in the upper embankment, because the slab acts as a reflection layer and waves are multi-reflected. In this present paper, wave propagation generated by a moving train load is evaluated in the time and frequency domains to consider a roadbed structure using an artificial impact load and field measured train load. The results confirmed the wave reflection effect on the pile-slab structure, if the embankment height is sufficient, vibration propagation can be stably restrained, whereas if the height is not sufficient, the vibration amplitude is increased.

조건에 부응하는 궤도구조

  • 이기승
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.3
    • /
    • pp.15-21
    • /
    • 2002
  • 옆의 사진을 보고 무엇을 느낄 수 있나\ulcorner 시속 30~40km/h의 열차가 레일이음매에서 발생하는 충격음을 내며 지나가고 있다. 여행 중 및 사람과 정다운 대화를 하면서 여행 그 자체를 즐기고 있다. 때로는 차장과 대화를 하면서 기관사를 신뢰하고, 안전하다는 믿음으로 여행을 한다. 가끔은 큰소리로 기적을 울려지지만 소음이라기 보다는 오히려 열차다운 면이기에 더욱 정이 간다. 느리다고 불평하는 사람도 없고, 궤도틀림으로 인한 진동이 심하다고 나무라는 사람도 없다. (중략)

Development and Calibration of 3-Component Vibration Transducer (3방향 진동감지기의 제작 및 검증)

  • Kim, Dong-Su;Lee, Jin-Seon;Jo, Seong-Ho
    • Geotechnical Engineering
    • /
    • v.13 no.4
    • /
    • pp.121-134
    • /
    • 1997
  • Vibrations induced by traffic loading and construction activities are extremely important due to their potential to cause damage to adjacent structures and toy complaints to the neighbors. Vibration induced damage to the built environment may be caused by the direct transmission of vibrations as well as by the, vibration induced differential settlement. In order to effectively control the vibration related problems, the accurate in-situ vibration monitoring is essential. In this paper, a calibration technique of a geophone which is widely used in practice was described. Once the frequency characteristics of individual geophones were calibrated, the 3fomponent geophone was developed for the in-depth vibration measurement, and the dot ailed calibration and application techniques of the 3fomponent geophone were described. Vibrations caused by blasting, train loading, and pile driving were measured and the applicability of the 3fomponent geophone was assessed.

  • PDF

Tilting Train-induced Roadbed Response on the Conventional Line (틸팅열차 주행시 기존선 흙 노반의 응답특성)

  • Koh, Tae-Hoon;Kwak, Yeon-Suk;Hwang, Seon-Keun;SaGong, Myung
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.5
    • /
    • pp.433-441
    • /
    • 2011
  • It is a fact that the straightening of track alignment is one of the undoubted ways to improve the train speed on conventional lines, while that requires huge investment resources. Therefore, the operation of a tilting train as well as the minimum improvement of track is suggested as an effective and economical alternative way for the speed-up of conventional lines. Since a driving mechanism of tilting train is different from those of existing trains, in order to make sure its operation safety and stability on conventional line, the performance of track and roadbed must be preferentially evaluated on the conventional line. Furthermore, it is necessary to estimate the tilting-train-induced roadbed response in detail since the roadbed settlement can lead to the track deformation and even derailment. In this research, the patterns of wheel load and lateral force were monitored and analyzed through the field tests, and the derailment coefficient and degree of wheel off-loading were calculated in order to evaluate the tilting train running safety depending on the running speeds (120km~180km) on the conventional line. Moreover, roadbed pressure, settlement and acceleration were also observed as tilting-train-induced roadbed responses in order to estimate the roadbed stability depending on the running speeds. Consequently, the measured derailment coefficient and degree of wheel off-loading were satisfied with their own required limits, and all of the roadbed responses were less than those of existing high-speed train (KTX) over an entire running speed range considered in this study. As a result of this study, the tilting train which will be operated in combination with existing trains is expected to give no adverse impact on the conventional line even with its improved running speed.

Vibration of Steel Composite Railway Bridges under High Speed Train (고속열차하중 하의 강합성형 철도교의 진동)

  • Chang, Sung Pil;Kwark, Jong Won;Ha, Sang Gil;Kim, Sung Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.4 s.37
    • /
    • pp.577-587
    • /
    • 1998
  • The influences of high speed train on the dynamic responses of steel composite railway bridges are investigated. The bridge system which has two I-girder and several cross beams is modeled with plate and frame elements. With assumption of concrete slabs are fully connected with steel girders, the offset between slabs and girders is modeled using constraint equation. The track system is modeled using beams on elastic foundation theory. And, the TGV train model is developed in 2-dimension considering bouncing and pitching motion. And braking action of vehicle is considered using speed dependent braking function. To investigate the behavior of bridges due to moving trains, parametric studies on the variation of natural frequency of bridge, speed parameter, vehicle modeling method, braking action of train, etc are performed.

  • PDF