• Title/Summary/Keyword: 연계 운영

Search Result 2,229, Processing Time 0.042 seconds

A Study on Data Linkage Between Public Data Portals and Individual Portals (공공데이터 포털과 개별 포털 간의 데이터 연계방안 연구)

  • Jin Ho, Park;Sang Woo, Han
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.33 no.4
    • /
    • pp.249-269
    • /
    • 2022
  • The Public Data Portal(data.go.kr) is a gateway for searching and using public data in South Korea. In 2021, the Ministry of Public Administration and Security established individual portal maintenance plans. Individual portals refer to portals built by public institutions in Korea other than the public data portal. According to the maintenance plan, the Korea Intelligence Information Society, the operator of the public data portal, needs to establish operating and data integration plans to link the public data portal and individual portals. In this study, we investigated the current operating status and data integration methods of the public data portal in South Korea, the United States, the United Kingdom, and France, and proposed that the adoption of a top-down approach is efficient when integrating data. In addition, we divided the specific procedures that should be pursued when integrating data into five stages: determination of data integration standard methods, analysis of metadata status, expansion of operating infrastructure, confirmation of data import, and launch of services.

A Study on the Interface between DAS and SCADA by using Direct Method (직접연계방법에 의한 DAS-SCADA 연계 연구)

  • Park, So-Young;Shin, Chang-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.5
    • /
    • pp.1154-1163
    • /
    • 2008
  • DAS and SCADA system are main systems, which operate and manage the power system by using computer and communication technology. But DAS and SCADA have been operated independently in Korea, so there was some time delay in the fault handling and live-line work. To improve that problems, studies on the interface between DAS and SCADA have been needed. From November 2005 to December 2007, the pilot project has been performed in KEPCO's branch offices, as a result, direct method will be applied widely all over the country until 2010 because the operation information of substation users want can be transmitted fast and it is possible to control 43RC directly although the expense for direct method is about 1.3 times larger than that for web method. To improve problems revealed during the pilot project, substation object to object communication method is proposed and interface database automatic generation and interface system diagnosis and logging functions are developed. Interface data point and communication data type are defined, substation single line diagram automatic generation or manual editing function, SCADA monitoring and controlling function, log data managing function are developed in SCADA HMI program. It is expecting to reduce the average time for each outage about 33% and to improve the reliability, efficiency of operation, execution of DAS from automatic load transfer under a fault, and to contribute to export project.

Astronomy Education in Planetarium

  • Baek, Chang Hyun
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.41 no.2
    • /
    • pp.45.4-46
    • /
    • 2016
  • 천체투영관은 과학관이나 천문교육 시설에서 관람객이나 피교육자가 많이 찾는 인기 시설 중 하나이며 연간 200만 명이 방문하는 비형식학습의 준비된 장소이다. 현재 국내에 운영되고 있는 약 80여개의 천체투영관들은 대부분 별자리 해설과 돔영상물 상영, 과학콘서트, 천체관음악회, 전문가 강연 등의 프로그램을 운영하고 있다. 이제 국내에서도 설계된 비형식 학습 환경을 갖춘 천체투영관을 천문학 교육에 효율적으로 활용할 수 있도록 학교교육과 연계된 프로그램을 개발하고 운영하는 방안이 연구되어야 한다. 해외 과학관에서 운영되고 있는 비형식 과학교육과 학교 과학교육의 연계 프로그램의 사례 등을 조사하고 국내 천체투영관에서 활용할 수 있는 천문학 교육 연계 프로그램을 개발하는 것이 시급하다. 이번 발표에서는 개편된 교육과정이 반영된 연계 프로그램에 대해 소개하고 천체투영관을 천문학 교육에 효율적으로 활용할 수 있는 방안에 대해 관계자들의 의견을 듣고자 한다.

  • PDF

Optimal Conjunctive Use of Surface and Ground Water (지표수와 지하수의 최적 연계운영)

  • Yi, Jae-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.4 s.129
    • /
    • pp.367-374
    • /
    • 2002
  • Water supply plan by optimal conjunctive use of surface and ground water is studied to prepare expected water deficit in near future. The optimization model for conjunctive use of surface and ground water is developed using discrete differential dynamic programming technique to maximize net benefit by water supply. As a result of applying the model to Namdaechun river located in Yangyang, it is found that water supply reliability using optimal conjunctive use of surface and ground water is much higher than reliability using surface water alone.

Efficiency Enhancement of Electricity Market by MOS-EMS Interfaced Operation (MOS-EMS 연계활용을 통한 전력시장의 효율개선)

  • Ok, Ki-Youl;Kim, Kwang-In;Kim, Doo-Jung;Kim, Kwang-Chul;Moon, Young-Kwon
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.363-364
    • /
    • 2006
  • 변동비반영시장(CBP)의 장기화가 예상됨에 따라 전력거래소는 차기 도매전력시장의 운영을 위해 개발된 시장운영시스템(MOS)을 현행급전체계에 활용하는 사업을 추진하고 있다. 이를 위하여 전력거래소는 현 CBP의 비용기반 입찰자료를 MOS의 가격입찰 방식으로 등가적으로 변환하는 입찰변환시스템과 MOS-EMS 연계운영의 적정성을 감시 및 진단하는 시장운영감시시스템을 개발하였다. 또한 MOS의 실시간(5분) 급전계획이 최적으로 수립될 수 있도록 상태추정의 신뢰성 및 수요예측의 정확도를 향상시켰다. 아울러 MOS-EMS 연계운영의 안정성을 검증하기 위해 10단계에 걸친 실계통 실증시험을 성공적으로 종료하였으며, 그 결과 계통운영의 효율성 및 투명성 향상은 물론 연간 260억원 이상의 발전비용 절감효과가 발생함을 입증하였다.

  • PDF

Improvement of Water Supply Capability of the Nakdong River Basin Dams with Weirs (보를 포함한 낙동강 다목적댐 용수공급능력 개선에 관한 연구)

  • Jang, Cheol-Ho;Kim, Young-Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.637-644
    • /
    • 2016
  • This study sought to reevaluate the water supply capacities of the Nakdong river dams, and identify measures to remedy any shortages using weirs, focusing on 5 multipurpose dams and 8 weirs. The reevaluation of the dams was performed by the HEC-5 program using the original design criteria and inflow data recorded for each dam. The results show that the capacities of the 3 dams has decreased to 73~87%. Three simulations were performed to determine the effect of coordinating the dams and weirs. The first simulation was based on individual operation of the dams; the second on coordinated operation of the dams; and the third on coordinated operation of the dams and weirs. To obtain a water supply reliability of 95%, the annual water shortage was calculated for a 20-year period (1992~2011). In addition, long-term runoff simulation data used in the national river basin investigation by the Ministry of Land, Infrastructure and Transportation were used with the dam discharge data, because long-term inflow data for the weirs were not available. The simulations were performed by the HEC-ResSim program, with the reservoir network divided into 2 groups based on the Waegwan water station. The results show that water supply capacity for the 3 simulations to be $2424Mm^3/yr$, $2612Mm^3/yr$ and $2734Mm^3/yr$, respectively. This indicates that coordinated operation of the dams and weirs could provide an additional water supply of $122Mm^3/yr$.

Suggestion of conjunctive operation approach for flood reduction in urban drainage system (도시침수 저감을 위한 내배수시설 연계운영방안 제시)

  • Lee, Eui Hoon;Lee, Jung Ho;Kim, Eung Seok;Jo, Deok Jun;Kim, Joong Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.5-5
    • /
    • 2016
  • 기후변화에 따른 수환경의 변화로 도시홍수로 인한 인명 및 재산피해가 증가하여 도시홍수에 대한 중요성이 급격히 부각되는 상황이지만 국내에서는 도시 내배수 시스템의 선진화기술 구축 및 그와 관련된 연구는 미흡한 실정일 뿐만 아니라 효과적인 침수 저감도 어려운 실정이다. 도시지역에서의 내수침수를 효과적으로 방어할 수 있는 구조적, 비구조적 홍수방어 대책의 수립이 시급한 실정이다. 현재 기존의 도시침수 저감 대책들은 유하시설의 용량 증설 및 통수능 확보를 초점으로 하는 구조적인 대책에 머물러 있으며, 유하시설 위주의 대책은 하류에서의 더 큰 홍수를 발생시킬 위험이 있다. 기존 내배수시설의 전체적인 확장은 막대한 예산과 시간을 필요로 할 뿐만 아니라 지구온난화로 인한 이상기후 및 국지성 집중호우에 완벽하게 대응하기 곤란하므로 구조적인 대책과 더불어 집중호우에 대비할 수 있도록 각 시설물의 기능 및 경제성을 최대로 하며 방재성능을 향상시킬 수 있는 비구조적인 대책이 동시에 수립되어야 한다. 본 연구에서는 비구조적인 대책 중 하나로 빗물펌프장 및 빗물저류조의 연계운영에 초점을 맞추었다. 모니터링 지점을 선정하여 빗물저류조의 추가저류공간을 확보하는 운영을 실시하고 빗물 펌프장 유수지의 수위를 낮추어 내수침수를 저감시킬 수 있는 방법을 제안하였다. 기존의 운영과 본 연구에서 제안한 연계운영을 비교하고 효과를 분석하였다.

  • PDF

Global Reference and Analysis of Wind Tubines Connected to Grid (계통연계 풍력발전의 해외 기준 분석 및 검토)

  • Choy, Young-Do;Kwak, No-Hong;Jeon, Young-Soo;Jeon, Dong-Hoon
    • Proceedings of the KIPE Conference
    • /
    • 2008.06a
    • /
    • pp.631-633
    • /
    • 2008
  • 현재 풍력발전 기술은 전 세계에서 가장 빠르게 성장하고 있는 기술로서 2010년도에 세계 보급량은 200GW를 넘을 것으로 추정되고 있다. 이에 우리나라도 풍력발전 기술 집약에 전력하고 있지만 풍력단지에 대한 운영 경험은 매우 제한적이며, 연계 기준 수립에 대한 기초가 부족한 실정이다. 따라서 한국계통의 특성을 고려한 연계 기준 및 최적 운영 방안 수립을 위한 다양한 국가에서 적용하고 있는 풍력 발전 단지에 대한 연계 및 운영 기준에 대한 검토가 필요한 실정이며 세계 각국에서 적용되고 있는 풍력 발전기의 계통 연계 기준을 분석 및 검토하였다.

  • PDF

Study for Operation of Water Resources in Cisangkuy Basin of Indonesia (인도네시아 Cisangkuy 유역 수자원 운영에 대한 연구)

  • Kim, Tae Won;Kim, Sung Man;Putuhena, Willam M.;Ko, Ick Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.557-561
    • /
    • 2016
  • 인도네시아는 수자원을 관리하는 기관이 총 9개 부처이지만 지역 단위로 가면 각각의 에이전시가 존재하는 등 복잡한 이해관계가 얽혀 있어 효율적인 수자원 관리 및 운영 기술에 많은 어려움이 있다. 이에 인도네시아 국립 수자원연구소(PusAir, Puslitbang Sumber Daya Air)와 공동으로 Cisangkuy 유역 내 다양한 시설물의 연계운영 효과를 분석하여, 한정된 수자원을 다양한 수요처에 원활히 공급함으로써, 지역민과 관리기관간의 이해관계를 해소하고 최적의 수자원 활용방안들에 대한 연구를 수행하고 있다. 본 연구에서는 Cisangkuy 유역 내 Cisangkuy 강 상류부의 기존 수력 댐 운영과 상수량 증대를 위해 계획 중인 신규댐에서의 추가용수 공급을 고려한 연계운영 효과분석을 수행하여 수자원의 효율적인 활용을 위한 기초자료를 제시하고자 한다. Cisangkuy 유역에 대하여 현재 용수체계에 대한 모형의 적정성 검토를 수행하였으며, 기존 수력댐 저수지 시스템 운영효율에 대하여 물수지분석을 검토한 결과, 현 운영체계보다 최적 운영시 수력발전소 발전용량이 증가되는 것으로 검토되었다. 이와 같은 모형 구축자료는 현재 Cisangkuy 유역에 대하여 체계적인 운영방안이 없는 상태에서 대상유역 내 다양한 시설물 연계운영효과 도출을 위한 자료가 될 수 있으며, 국내 연구진들이 향후 인도네시아 수자원활용 계획 수립 시 기초자료 활용측면에서 유용할 것으로 예상된다.

  • PDF

The study on the direction of the reclosing relay operating for Distributed Generation interconnection with distribution power system (분산전원의 배전계통 연계에 따른 재폐로 계전기 운영 방향에 관한 연구)

  • Jeong, Jong-Chan;Kim, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.655-656
    • /
    • 2007
  • 전력 계통에 연계형 분산전원이 도입되므로 인하여 기존배전선로와 달리 양방향 전력조류가 발생, 이에따른 보호계전방식의 수정을 필요로 하므로, PSCAD-EMTDC 시뮬레이터를 통하여, 이때의 배전계통의 현상들을 모의하고, 이에 따른 대책을 제시하므로 하여 배전계통 신뢰도를 향상시키기 위한 연구를 진행하였습니다. 기존선로를 이용해 연계된 분산전원과, 전용선로를 통하여 연계된 분산전원을 모의하고, 부하 상태와 사고 형태에 따른 시뮬레이션을 진행 현상을 분석하여 새로운 운영방식을 제시하였다.

  • PDF