Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
Transactions of the Korean Society of Mechanical Engineers B
/
v.34
no.5
/
pp.563-568
/
2010
Turbopump-gas generator open-loop coupled tests are performed during the development of a 30tonf-LOx/Kerosene rocket engine. In the turbopump-gas generator open-loop tests, the propellants to gas generator are supplied from the outlets of turbopump, while the gas exhausted from the gas generator is vented out to the atmosphere, instead of being used to turbine driving. This paper presents the objectives, procedure, and results of the open-loop coupled test, in addition to a schematic representation of the test apparatus and the operating conditions for the test facility system and control system. The results of turbopump-gas generator open-loop coupled test confirm chill-down procedure, startup characteristics, nominal operability and smooth shutdown of the open-loop coupled Test Plant in test conditions simulating engine system operation environment.
Proceedings of the Korea Water Resources Association Conference
/
2019.05a
/
pp.202-202
/
2019
상수관망 시스템의 목적은 수요자에게 양적으로 안정하고 질적으로 안전한 용수를 적정 수압으로 공급하는 것이다. 그러나, 상수관망 시스템은 노후화, 시공 중 파손 등 다양한 내 외적 요인들에 의해 파괴가 불가피하며, 이를 복구하는 과정에서 단수는 필연적으로 발생하게 된다. 단수피해를 효율적으로 감소시키는 방법은 인근 배수블록과의 비상연계를 실시하는 것이다. 비상연계란, 관망의 파손 등 비정상상황 발생 시 단수구역에 용수를 공급하기 위해, 인접한 배수블록과 연결된 비상관로를 운용하여 인접 배수블록으로부터 단수구역에 용수를 공급하는 것을 의미한다. 본 연구에서는 비상연계 시 연계공급을 실시하는 배수블록에서의 문제점이 아닌 연계공급을 받는 배수블록에서의 문제점을 실제 A시 관망을 바탕으로 분석하고, 이에 대한 해결책을 제안하였다. 실제 A시에서는 직경 600mm 간선관로(수지식)의 파손으로 2지 배수블록 하단부가 단수되는 사고가 발생하였다. 이에 단수피해를 최소화하고자 인근 배수블록인 1지 배수블록과의 비상연계를 실시하였으나, 2지 배수블록 하단부의 말단부분에서 고압이 발생하고 관로 파손과 같은 추가적인 문제가 발생하였다. 본 연구에서는 A시에서 실시한 비상연계 시나리오를 구축한 후 수원에서의 유한함을 고려할 수 있는 A-PDA 기반 수리해석을 실시하여 대한 고압발생의 원인을 분석하였다. 고압 문제의 원인은 연계 공급을 실시하는 1지 배수블록과 2지 배수블록간의 고도차에 의해 발생한 것으로 사료되며, 이에 대한 해결책으로 감압밸브 추가 설치, 주요 관로 복수화 방안을 제시하였다. 이후 각 해결책에 따른 모델을 구축한 후 수리해석을 실시하여 해결책이 상수관망에 미치는 영향을 분석하였다. 본 연구는 실제 관망에서 비상연계 시 발생한 문제를 분석함으로써 비상연계 시스템 구축 시 추가적으로 발생 가능한 문제 및 해결방안을 제안하였다.
지자체 GIS 정보화가 확산되어감에 따라 구축된 공간정보의 활용확산, 타 정보와의 연계 등의 요구가 증대되고 있으며 지자체 GIS 통합 연계는 지자체 정보화의 핵심으로 부각되고 있다. 그러나 많은 지자체에서는 도로, 상하수도 등 공간정보 수요가 높은 업무 분야를 중심으로 지자체 GIS 통합연계를 추진하고 있으며, 지자체 지리정보 담당부서의 중심으로 추진되고 있어 지자체 전 부서 대상의 공간정보 활용에 대한 한계가 있다. 이러한 한계를 극복하기 위해선 지자체 내 전부서에서의 공간정보 활용을 위한 지자체 GIS 통합연계 고도화 모델이 필요하다. 지자체 GIS 통합연계 고도화 모델은 지자체 지리 정보 담당부서 중심의 통합연계에서 확대하여 지자체 전 부서 및 국가적 차원에서의 협력체계를 고려한 모델로서 지자체의 수평적 수직적 통합연계 모델이다.
현대사회에서 정보기술의 급격한 발전은 사회전반에 걸쳐 큰 영향을 미치고 있으며, 이러한 변화 속에서 국민에게 보다 편리하고 효율적인 행정서비스를 제공하려는 정부의 노력도 끊임없이 진행되고 있다. 전자정부 11대 중점과제의 하나인 "4대 사회보험 정보연계시스템 구축" 사업은 2002년부터 운영 중에 있으나, 정보연계사업 고유의 성과를 평가하는 체계가 마련되어 있지 못한 실정이다. 평가체제의 미비는 사업목표의 객관적인 달성정도를 파악할 수 없을뿐 아니라 향후 달성목표치 설정을 위한 기준선정이 불가능하며, 나아가 대국민 서비스의 질적 향상을 극대화 하는데 필요한 객관적인 자료의 부재로 이어진다. 본 연구는 4대 사회보험 정보연계시스템이 구축목표에 부합되게 운영되고 있는지를 평가하는 지표가 필요하며, 그 필요성에 따라 IT조직 및 기술에 관한 성과평가기법인 IT-BSC 성과평가모델을 활용하여 4대 사회보험 정보연계시스템의 특성에 최적화된 성과평가모델을 제안하고자 한다. 제안된 성과평가모델는 4대 사회보험 정보연계시스템의 성과평가지표로 활용됨으로써 향후 운영방향설정 및 목표달성도 측정의 주요한 정보로 활용될 것이다.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2014.06a
/
pp.267-269
/
2014
최근 국제적으로 e-Navigation이 추진되고 있으며, 이는 국제적으로 표준화된 정보 제공 및 결합을 통하여 해상에서 항해를 안전하고 효율적으로 하는데 목적이 있다. 국내에서는 VTS 시스템간 연계를 하고자 했으나, 서로 경쟁이 되는 외산 장비의 구축으로 정보연계의 어려움이 있어 왔다. 특히 해상의 위험상황에서 상호 정보를 연계하고 전파하여 상호 협력적 사고대응이 이루어 진다면 최근에 발생한 세월호와 같은 사건도 예방될 수 있다. 즉, 정보연계를 통한 통합 시스템 구축 및 인접 시스템간 연계는 매우 중요한 요소로서 VTS 센터간 공동 목적을 위하여 상호 협력적 감시 및 관제가 필요한 상황이다. 따라서 본 논문에서는 e-Navigation 진화를 앞두고, 국제적으로 표준화 되고 있는 시스템간 정보교환 기술을 검토하고, 현재 국내 현실을 반영하여 VTS 시스템간 연동방안을 검토하고자 한다. 실제적으로 시스템간 연동을 위한 설계와 구축 및 통합화 노력이 요구되며, 통합화 방법이 효율적인 방안인지 검토 확인되어야 하며, 국가적으로도 VTS 서비스의 안전성을 보장하는 기술개발로 진화가 고려되어야 한다.
분산전원(Dispersed Generators)이 계통과 연계된 상태로 운전함에 따라 단방향의 전력 조류만을 고려하여 운영되던 기존의 배전 시스템에 여러 가지 새로운 영향을 미치게 되었다. 따라서 배전계통에 설치된 보호 장치들은 발전기 자체의 고장은 물론 계통 상황에 적절히 대처하여 운전할 수 있도록 고안되어져야 한다. 특히 DG가 연계되어 있는 배전선에서의 사고는 배전용 차단기의 동작으로 DG의 단독운전이 발생 할 수 있다. DG의 단독운전은 인명피해, 기기손상, 전력품질저하, 계통 복구의 어려움 둥 많은 문제가 있으므로 사고시 DG를 신속히 계통으로부터 분리해 주어야 한다. 그러나 DG가 연계된 배전선 이외(인접 배전선)의 고장에 대해서는 DG가 불필요하게 계통으로부터 분리되는 것을 예방하고 사고가 계통에서 제가 될 때까지 정상적으로 동작하게 하여야 한다. 따라서 DG 연계 배전선과 인접 배전선의 고장을 명확히 구분하는 것이 중요하다. 본 논문에서는 DG 연계 배전선과 인접 배전선의 고장 구분을 위해서 Network 상의 IED(Intelligent Electronic Device)에서 제공되는 Data통하여 HMI내에서 DG 연계 배전선과 인접 배전선의 사고판단을 하고 결과를 각 계전기로 보내 동작유무를 결정한다.
본 연구에서는 고분자연료전지(PEMFC)을 이용하여 보조전원용으로 사용할 수 있는 계통연계 연료전지 시스템을 개발하였다. 또한 본 연구에서는 DSP(Digital Signal Processor)칩을 이용한 계통 연계용 전력변환기(PCS, Power Conditioning System)와 제어시스템 개발도 병행하여 수행되었다. 개발된 1kW급 계통연계형 시스템은 다양한 조건에서의 스택 성능 실험 및 BOP 연계 시험을 통해 최적의 운전점을 도출할 수 있었으며, PID(Proportional, Integral, Differential) 운전제어 방법올 적용하여 시스템의 안정적인 운전 특성을 확보하였다. 향후 본 시스템을 계통연계용은 물론 독립전원용으로 사용하기 위해 전력변환장치를 설계중이며, 2007년 하반기에 시스템에 적용될 예정이다.
최근, 국가적인 차원에서 추진되고 있는 대체에너지 전원은 배전계통에 연계되어 운용되는 특성을 가지고 있다. 태양광과 풍력 풍의 자연에너지를 이용한 신${\cdot}$재생에너지전원은 일정한 출력을 내는 기존의 전원 보다 기후나 온도, 지형적인 영향을 많이 받는 간헐적인 전원이므로, 이들이 도입된 배전계통은 기존의 단 방향 공급형태의 배전계통과는 달리 부하와 전원이 혼재되어 운용되는 형태로 되기 때문에 배전계통의 전압품질에도 좋지 않은 영향을 미치는 것이 사실이다. 따라서 분산전원이 도입된 배전계통은 기존의 부하만이 존재하는 배전계통과는 달리, 부하와 전원이 혼재되어 운용되는 형태로 되기 때문에 분산전원의 연계에 따라 발생이 예상되는 문제점을 검토, 분석할 수 있는 분산전원 배전계통연계용 해석 프로그램이 요구되고 있다. 따라서 본 논문에서는 분산전원이 배전계통에 연계되는 경우, 계통연계 기술요건 가이드라인 및 기술지침에 근거하여, 비전문가라도 쉽게 사용할 수 있는 종합적인 분산전원의 배전계통 연계용 해석 알고리즘을 제시하였다.
Though many corporations are operating their logistics information systems, standard document forms for the connection of logistics information systems between transaction companies are not provided. Therefore, the standardized logistics information connection is needed for the efficient management. In this study, we Provide a prototype for logistics information systems connection by using e-mail which contains RFID and product information. This study could be a basis for logistics information system connection with the advance of RFID.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.2059-2063
/
2007
장기 수자원계획시 댐군의 연계운영을 위한 물수지분석 모형으로 HEC-5 모형과 K-ModSim 모형을 선정하고, 이에 대한 댐군의 연계운영 효과를 비교 평가를 수행하였다. K-ModSim 모형은 범용 우선순위 목적 선형최적화 모형으로, 조절점 및 저수지조작에 대한 우선순위를 지정할 수 있는 반면, HEC-5 모형은 목적별 저수지 조작의 우선순위가 지정되며, 등가저수지 개념을 사용하여 방류 우선순위를 결정하도록 되어있다. 이와 같은 연계운영 방식의 차이는 적정한 시기에 조절점에서의 물부족이 발생하는지 여부를 결정짓는 매우 중요한 요소이다. 따라서 본 연구에서는 가뭄발생 상황에 대한 각 모형의 연계운영효과를 비교 분석함으로써 급속히 변화하고 있는 수자원 이용환경에서 보다 합리적인 댐군의 연계운영 방안을 제시하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.