• Title/Summary/Keyword: 여재성능

Search Result 34, Processing Time 0.019 seconds

Evaluation of various nutrients removal models by using the data collected from stormwater wetlands and considerations for improving the nitrogen removal (인공습지에서 영양소 제거 설계모델 검토 및 질소제거 개선방안에 대한 고찰)

  • Park, Kisoo;Kim, Youngchul
    • Journal of Wetlands Research
    • /
    • v.19 no.1
    • /
    • pp.90-102
    • /
    • 2017
  • In this study, various types of nutrient models were tested by using two tears's water quality data collected from the stormwater wetland in Korea. Based on results, most important factor influencing nitrogen removal was hydraulic loading rate, which indicates that surface area of wetland is more important than its volumetric capacity, and model proposed by WEF was found to give a least error between measured and calculated values. For the phosphorus, in case assuming a power relationship between rate constant and temperature, the best prediction result were obtained, but temperature was most sensitive parameter affecting phosphorus removal. In addition, denitrification was always a limiting step for the nitrogen removal in this particular wetland mostly due to the lack of carbon source and high dissolved oxygen concentration. In this paper, several alternatives to improve nitrogen removal, including proper arrangement and designation of wetland elements and use of floating plants or synthetic fiber mat to control oxygen level and to capture the algal particles were proposed and discussed.

Maintenance of Infiltration-type Facilities for Non-point Source Pollutant (침투형 비점오염원 처리시설의 유지관리에 관한 연구)

  • Lee, Hosik;Lee, Sanghwan
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.145-152
    • /
    • 2013
  • This study was conducted to improve the Nonpoint-source pollutant treatment plant efficiency and maintenance. Field and laboratory permeability test were conducted three times each before and after displacement. The removal efficiency such as TSS, BOD, CODmn, T-N, and T-P were investigated from the year of 2006 to 2011. The coefficient of permeability right after displacement was calculated to be $1.07{\times}10^{-3}(cm/s)$, coefficient of permeability after a year was calculated to be $0.88{\times}10^{-3}(cm/s)$, and after five years, it was calculated to be $0.3{\times}10^{-3}(cm/s)$ and accordingly, the amount of infiltration decreased. In case of the removal efficiency, it generally tended to decrease, but it showed the higher rates than the expected rates BOD 40%, SS 76%, T-N 39% and T-P 53%. It is concluded that displacement cycle should be at least five years and that dredging cycle should be at least three months and at most one year.

Evaluation of DOM Variations and Reduction Effects in Bioreation Artificial Wetland (생물반응 인공습지 내 DOM 변동 및 저감효과 평가)

  • Joo, Kwangjin;Lee, Jongjun;Kim, Tea-Kyung;Choi, Isong;Chang, Kwang-hyeon;Joo, Jinchul;Oh, Jongmin
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.6
    • /
    • pp.582-594
    • /
    • 2018
  • In this study, the vertical and horizontal flow wetlands were combined in series to create conditions for flow in the exhalation and anaerobic state with the aim of monitoring the variability and reduction of dissolved organic matterin the bio-reactive artificial wetlands, and the performance assessment was conducted as acrylic reaction groups by designing artificial wetlands that filled the functionalresiduals. In case of artificial wetlands in vertical and horizontal planes, the concentration of dissolved oxygen (DO) in the reaction tank was measured as 2.7 mg/L in the vertical flow wetlands under exhalation, and N.D. in the horizontal flow artificial wetlands under anaerobic conditions. The test was carried out by changing the operation time to 140 min, 80 min, and 60 min. The test was conducted with the same natural operation time of 20 min depending on the operation time. All hours of operation were shown to be due to microbial activity. In 3D-EEM, it was found that the longer the driving time was taken, the more reduction the organic compounds in the areas of insoluble human resources, III and V. Further research on the mechanism analysis of future reduction effects is expected to be carried out, but the findings are expected to contribute to the development of technologies for reducing obfuscated substances using artificial wetlands in the future.

Performance assessment of an urban stormwater infiltration trench considering facility maintenance (침투도랑 유지관리를 통한 도시 강우유출수 처리 성능 평가)

  • Reyes, N.J. D.G.;Geronimo, F.K.F.;Choi, H.S.;Kim, L.H.
    • Journal of Wetlands Research
    • /
    • v.20 no.4
    • /
    • pp.424-431
    • /
    • 2018
  • Stormwater runoff containing considerable amounts of pollutants such as particulates, organics, nutrients, and heavy metals contaminate natural bodies of water. At present, best management practices (BMP) intended to reduce the volume and treat pollutants from stormwater runoff were devised to serve as cost-effective measures of stormwater management. However, improper design and lack of proper maintenance can lead to degradation of the facility, making it unable to perform its intended function. This study evaluated an infiltration trench (IT) that went through a series of maintenance operations. 41 monitored rainfall events from 2009 to 2016 were used to evaluate the pollutant removal capabilities of the IT. Assessment of the water quality and hydrological data revealed that the inflow volume was the most relative factor affecting the unit pollutant loads (UPL) entering the facility. Seasonal variations also affected the pollutant removal capabilities of the IT. During the summer season, the increased rainfall depths and runoff volumes diminished the pollutant removal efficiency (RE) of the facility due to increased volumes that washed off larger pollutant loads and caused the IT to overflow. Moreover, the system also exhibited reduced pollutant RE for the winter season due to frozen media layers and chemical-related mechanisms impacted by the low winter temperature. Maintenance operations also posed considerable effects of the performance of the IT. During the first two years of operation, the IT exhibited a decrease in pollutant RE due to aging and lack of proper maintenance. However, some events also showed reduced pollutant RE succeeding the maintenance as a result of disturbed sediments that were not removed from the geotextile. Ultimately, the presented effects of maintenance operations in relation to the pollutant RE of the system may lead to the optimization of maintenance schedules and procedures for BMP of same structure.