초대형 건축물의 PC부재 양중작업 사례연구 (Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure)

  • 조원현;나영주;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

Double-Cage 건설용 리프트의 양중시간 산정을 위한 시뮬레이션 모델 개발 (The Development of Simulation Model for Calculating Hoisting Time of Double-Cage Construction Lift in Supertall Building Construction)

  • 김완섭;이동민;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.64-65
    • /
    • 2016
  • According to the recent increase in the height of supertall buildings, construction lift became one of most important equipment for vertical transportation of resources. However, increase in lifting load during peak time in which the resources are concentrated often causes a risk of construction delay. This study suggests a concept of Double-Cage construction lift, which is a lift with two cages attached together allowing transportation of resources on two consecutive work floors simultaneously. The aim of this study is to present a simulation model suitable for calculating hoisting time of Double-Cage construction lift. The proposed model is expected to be utilized when applying Double-cage construction lift for its efficient operation and management.

  • PDF

초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델 (Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction)

  • 남철우;권재범;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

공동주택 스마트 외피 시스템의 양중 팔레트 개발에 관한 연구 (A Study on the Development of the Lifting Palette in the Smart Skin System of Apartment Housing)

  • 이현정;박문선;안용한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.145-146
    • /
    • 2018
  • This study was performed to develop the lifting pallets for the application of smart skin system when remodeling the balcony of apartment house. For this purpose, the smart skin system based on IoT, combining window, BIPV, ESS, air purifier applied in this study was examined. The study developed and presented a foldable double pallet considering the load (about 2Ton) and specification (width 7m × height 2.6m × width 1.3m) of the smart skin system. In future research, it is necessary to verify the application of the foldable pallet in this study.

  • PDF

모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출 (Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction)

  • 김민주;이동민;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.211-212
    • /
    • 2015
  • Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).

  • PDF

건축공사의 공정관리를 위한 타워크레인 양중 효율성 분석 (Efficiency Analysis of Tower Crane Lifting Work for Project Management of Construction)

  • 배정현;김기혁;이동훈
    • 한국건설안전학회 논문집
    • /
    • 제2권2호
    • /
    • pp.63-69
    • /
    • 2019
  • 현재 빌딩 건설 프로젝트의 규모가 점점 더 커지고 있다. 이에 따라 다른 양중 장비보다 생산성이 높은 타워크레인 사용이 지속적인 증가하고 있는 추세이다. 그러나 무거운 물건을 운반하는 장비는 임대료가 비싸고 비효율적으로 운영되고 있으며 양중 작업의 생산성 및 효율성이 저하된다는 문제가 있는 것으로 분석되었다. 따라서 본 연구에서는 우선 현장에서 비효율적으로 운영되는 타워크레인을 조사한 후 타워크레인 작업에 영향을 미치는 항목들에 대한 점검 목록을 작성했다. 그 후 현장 방문을 통해 타워 크레인 점검표를 종합적인 데이터 가치로 도출했다.

Low-e 복층유리의 현장 내 물류흐름 파악 및 생산성 향상을 위한 개선안 방향 (The Improvement Plans for Material Flow and Productivity Improvement of Low-e Double Glazing on Site)

  • 이상혁;임명복;이재성;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.341-344
    • /
    • 2003
  • 도심지내 대형화, 고층화 공사에서는 증가하는 자재의 종류와 양에 비해 한정된 공간과 장비의 제한 등의 문제로 효용성 제고가 요구되고 있어 물류관리의 중요성이 강조되어지고 있다. 이러한 제약들로 인해 공사비 증대, 공기지연, 생산성 저하, 안전사고 발생 등의 문제를 야기 할 수 있다. 이러한 현장 내 물류관리의 문제점들을 해결하기 위하여 적시생산(just-in-time. 이하JIT)관리개념에 대한 관심이 높아지고 있으며 건설자재의 기존 물류흐름 프로세스를 개선한 양중 및 조달의 다양한 시도가 이루어지고 있다. 현재 콘크리트와 같은 주요 자재의 JIT적용 연구는 이미 많은 연구와 수행이 진행이 되고 있으나 마감자재에 대한 연구는 아직 미비하다 하겠다. 이에 커튼월과 더불어 주요 마감자재라 할 수 있는 유리, 그중 Low-emissivity 복층유리(이하 Low-e 유리)를 적용하여 현재의 물류관리 흐름 파악과 JIT관리 적용시 발생하는 효과와 양중조달 시스템 개발방향을 제시하는 것이다.

  • PDF

무선 RF모뎀과 GPS를 통합한 타워크레인의 철골부재의 실시간 양중위치 추적시스템 개발 (Development of a Real-time Lifting-path Tracking System of a Tower-crane for Steel Members based on an Integrated Wireless RF Modem and GPS System)

  • 윤석헌;이강
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.65-70
    • /
    • 2010
  • 철골공사는 고소에서 작업을 하며 많은 위험요소가 따르며, 안전성과 생산성을 향상시키기 위해 로보틱 크레인개발을 위한 프로젝트가 진행되었다. 그 첫 번째 단계로서 실시간 양중위치를 추적하는 시스템을 개발하였는데, 본 연구에서는 이를 위하여 x, y, z 좌표를 쉽게 얻을 수 있는 GPS 센서를 사용하였다. 또한, 본 연구에서는 데이터의 정확도를 향상시키기 위해 2대의 GPS센서를 사용하였으며, RF모뎀을 이용한 무선인식 태그와 함께 통합된 양중경로 추적 시스템을 개발하였다. 개발된 무선인식 태그와 RF모뎀 기반의 GPS 센서는 함께 최대 1 km까지 안정적으로 신호를 전송할 수 있으며, GPS의 상대측위기법을 사용하여 그 오차를 평균 0.61 m까지 줄일 수 있다.