• Title/Summary/Keyword: 양중관리

Search Result 77, Processing Time 0.02 seconds

Development of Temporary Facility Planning System for High-rise Building Constructions through the Analysis of Influence Factors (영향요소 분석에 의한 고층건축공사의 가설계획시스템 개발)

  • Jang Myung-Houn
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.164-173
    • /
    • 2002
  • The high-rise building construction field in the urban area is short of working space because it is surrounded by adjacent buildings and nearby roads. The insufficient space causes problems of interference and conflicts in transporting materials and working at the site. These problems can be resolved partly through the proper selection and layout of temporary facilities. A method proposed in this paper supports a decision-maker to evaluate and select the alternatives of temporary facilities plans by establishing and analyzing processes and influence factors of them. Knowledges considered in planning temporary facilities layout are structurized and a program is implemented for a field manager. Case studies are performed to evaluate the feasibility and applicability of the proposed method.

  • PDF

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction- (고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로-)

  • Song Young-Suk;Lim Hyung-Chul;Choi Yun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.127-134
    • /
    • 2001
  • Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.

  • PDF

Risk Index Computation of Work Type for Bridge Construction using Accident Cases and the AHP Method (재해사례와 AHP를 이용한 교량공사 위험지수 산정)

  • Seo, Su-Eun;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.441-459
    • /
    • 2009
  • 교량공사는 지상작업과 고소작업이 혼재하고 작업공종이 복잡하여 위험성이 높은 공사로 추락, 협착, 붕괴, 낙하 비래 재해의 발생빈도가 높다. 또한, 중량 부재의 운반, 조립, 양중 등의 작업과정에서 유해 위험 기계기구와 건설장비 사용에 따른 유해 위험 요인이 산재하여, 유해 위험의 정도와 재해 발생빈도 및 재해의 강도에 차이가 있어 위험성평가를 통한 정량화된 위험지수의 제시가 필요하다. 위험성 평가는 교량공사의 특성을 고려하여 교량 건설현장의 공종별 유해 위험요인을 세부공종별 요소작업에 따라 분류하고, 재해 발생정도와 피해정도에 따른 위험도가 평가되어야 한다. 이러한 교량 건설공사의 재해를 줄이는데 기여할 수 있도록 정량화된 교량공사 위험지수를 제시함으로써 체계적이고 효율적인 재해예방 활동에 필요한 기초자료를 제공할 것이다. 특히 교량공사 시공 상의 제반 위험요인을 사전에 점검하여 변경 보완 제거할 수 있는 재해 예방대책을 수립하여 재해를 최소화하는 연구가 필요하게 되었다. 건설현장에서 위험지수의 고저에 따라 자원을 적정하게 배분한다면 안전관리의 효율성이 제고되고, 궁극적으로 건설재해 감소에 기여하게 될 것으로 기대된다.

  • PDF

BcN/NGN 구조 및 표준화 동향

  • Kim, Yang-Jung;Lee, Dong-Gyu;Jeong, Il-Yeong
    • Information and Communications Magazine
    • /
    • v.24 no.3
    • /
    • pp.5-14
    • /
    • 2007
  • NGN (Next Generation Network)은 현재 IP기반의 네트워크 기능을 효과적으로 수용하면서 기존의 IP 및 전기통신 서비스뿐만 아니라 앞으로 예상되는 IP 기반 서비스를 효율적으로 제공하기 위한 표준 네트워크 프레임워크라고 여겨진다. 이를 표준화하기 위하여 ITU-T SG13 및 NGN-GSI (NGN-Global Standards Initiative)에서 ITU-T의 관련 연구 그룹들이 참여하여 요구되는 네트워크 및 서비스의 표준화를 매우 적극적으로 추진하고 있다. 우리나라의 BcN도 ITU-T의 NGN 표준화 결과 및 국내 상황을 고려하여 표준모델을 설정하고, 이를 기반으로 IP 기반의 광대 역 고품질 네트워크 프레임워크 틀을 만들어 가고 있다. 본고는 이러한 국내외 상황을 고려한 BcN/NGN 표준화 동향 및 ITU-T NGN의 프레임워크 및 구조, NGN의 서비스 기능 구조, NGN의 자원 관리 및 제어, 유무선 통합 (Fixed Mobile Convergence) 및 NGN Security 구조 등의 표준화 동향에 대하여 기술한다.

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

A Location Model for Tower Cranes of High-Rised Building Construction (고층건물 타워크레인 위치선정 모델)

  • Park Jung-Hyun;Lee Hyun-Shic;Hyun Chang-Taek;Koo Kuo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.614-617
    • /
    • 2003
  • Recently the demand of constructing high-rised building grows larger. So it becomes more important to make an exact plan of a tower cranes which has an important position in high-rised building construction. Nevertheless businessmen of construction sites only depend on a great store of experience without a clear process of locating tower cranes. The object of this study is to set up the process model for locating tower cranes. The study went off through a study of related documents, an interview with some experts and a visiting of job sites. In result the study suggests a process model which has four steps of considering an establishing, disjointing, a radius of working, easy working. Case study was examined to estimate the feasibility and applicability of the proposed model. As a result, the model is proven to be a method to locate tower cranes quickly and cleary, and to operate properly as a decision-making tool.

  • PDF

Proposal of a Classification System of Checklists for Safety Management of On-Site Workers in Modular Construction (사례분석을 통한 모듈러 건축의 현장 작업자 안전관리 체크리스트의 분류 체계 제안)

  • Jun, Younghun;Kim, Kyoontai;Jeon, Eunbi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.120-130
    • /
    • 2021
  • Recently, the government is reinforcing safety management at construction sites to prevent safety accidents in construction works, and the safety management plan of workers is an important situation. Meanwhile, modular construction is expected to be gradually expanded to middle and high-rise buildings, but active measures to ensure worker safety are insufficient. This study is a preliminary study of the development of a checklist for preventive worker safety management. The purpose of this study is to derive a checklist classification system for the safety management of workers in the field of modular construction by preceding studies, case analysis, and expert advisory opinions. The classification system consists of large categories of factory manufacturing, transportation, and on-site construction, and the sub-system consists of six sub-classes: foundation work, frame work, modular frame installation work, finishing work, and facility work. Among them, the sub-classification of modular frame installation work consists of 12 unit works, centering on module lifting and assembly module work, which are the main construction processes. And the classification system reflects the three main management factors and contents for defined safety management. It is expected that the research results of this study can contribute to efficient safety management at the modular construction site.

A Study on Environmental.Mine Geographic Information System Approach for the Sustainable Mine Management and Prevention of Mine Hazards - Focused on the Environmental Section - (지속가능한 휴폐광산 관리 및 공해 방지를 위한 환경.광산 지리정보체계 구축 및 개선 연구 - 환경부분 중심으로 -)

  • Lee, Ju-Young;Han, Moo-Young;Yang, Jung-Seok;Choi, Jae-Young
    • Journal of Environmental Policy
    • /
    • v.8 no.1
    • /
    • pp.129-143
    • /
    • 2009
  • In South Korea, Mine industries were encouraged to obtain the natural resource from 1960 to 1980. However, the depletion of natural resource and decreasing price have been caused by the voluntary closure of non-economical mines and a cut of their production since 1990. Harmful wastewater containing such heavy metals as iron, aluminum, arsenic, and cadmium are being discharged from abandoned pits and waste stone and tailing dumping sites following the closure of mines. Therefore, the objective of this paper suggests a policy of mine hazard prevention(PMHP) and method that allows the combination of new spatial data and as well as collected data on resources for the sustainable mine reclamation and management using EGIS/MGIS technique to develop an integrated plan and management techniques.

  • PDF

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF