• Title/Summary/Keyword: 애로공정

Search Result 40, Processing Time 0.043 seconds

Bottleneck Detection Based on Duration of Active Periods (생산 활동기간 기반 애로공정의 발견)

  • Kwon, Chi-Myung;Lim, Sanggyu
    • Journal of the Korea Society for Simulation
    • /
    • v.22 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • This paper applies an active period based bottleneck detection method to flow shop manufacturing system with limited buffer size. Manufacturing systems are constrained by one or more bottlenecks which degrades the system throughput. Conventional bottleneck detection methods include the waiting time or queue length of production stations and their utilization. Due to the random events such as production time of items, machine failure and repair times, the systems may change over time, and subsequently bottlenecks shift from one station to another station. Active period of working station may cause other stations to wait for productions. Information when and where active periods occur helps to find bottlenecks in production systems. Based on these informations, we predict bottlenecks in applying AweSim simulation language. We compare the simulation results of conventional methods with those obtained from duration of active period method, and duration ratio method of both sole and shift bottleneck periods. Even though simulation results are from simple flow shop model, they are quite promising for predicting bottlenecks of production stations. We hope this study aids in decision making regarding the improving system production yield and allocation of available resources of system.

컨테이너터미널의 효율적인 에너지 소비 관리방안

  • Choe, Yong-Seok;Son, Ho-Seong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2010.10a
    • /
    • pp.59-61
    • /
    • 2010
  • 컨테이너터미널에서 사용되는 하역장비의 에너지 소비패턴을 분석하여 효율적인 에너지 소비 관리방안을 제시하고자 한다. 컨테이너터미널의 하역장비는 전기에너지와 유류에너지 소비 패턴의 차이가 있으며, 이를 실적자료를 바탕으로 분석하였다. 또한 하역장비의 상호작용에 의한 대기현상을 발생과정을 분석하여 에너지 소비가 많은 애로공정을 도출하였으며, 하역장비 애로공정의 발생지점을 분석하였다. 에너지 소비 관리방안으로 처리량과 에너지 소비 상관계수 비교, 처리물량 변화 패턴 추적 관리, 하역장비 부족에 의한 에너지 소비 애로공정 관리 등의 3가지를 제시하였다.

  • PDF

생산성 향상을 위한 환풍기 조립생산의 애로공정분석에 관한 연구

  • 정영득;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2001.05a
    • /
    • pp.287-291
    • /
    • 2001
  • 본 연구에서는 생산성이 저하되고 있는 DWV-2O/ 25 DRG(수동개폐식) 모델과 DWV-20/25 DRA 모델을 대상으로 조립생산시스템에서 발생되고 있는 애로공정의 문제점과 불량품 발생 상태를 관리 기술적인 견지에서 분석하여 생산성 향상을 증대하고자 하는데 목적이 있다.

  • PDF

자동차용 스프링 제조업체의 생산합리화 방안에 관한 사례연구

  • 노인규;김진규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1992.04b
    • /
    • pp.149-155
    • /
    • 1992
  • 본 사례연구는 자동차용 스프링 제조업체의 생산합리화를 위하여 조립라인에서의 효율적인 조립을 위한 전 생산공정의 평준화 생산 방안에 관한 것이다. 조립라인에서 조립작업의 지연 및 불균형은 그 근본 원인이 애로공정인 열간작업 및 열처리공정에서의 모델별.낱장로트별로 작업공정 구성과 작업처리속도에서 불균형을 이루기 때문이다. 결국 열간작업과 열처리공정이 전공정에서의 생산량과 공정간재고를 통제한다. 위와 같은 문제를 해결하기 위해서는 모기업의 수요를 기점으로하여 필요한 제품을 필요한 양만큼 필요할 때에 공급할 수 있는 마케트인(market in)방식의 인출(pull)시스템을 구축하여야 한다. 따라서 전 생산공정을 크게 압연공정, 열간작업공정, 열처리.조립공정으로 나누어서 용량(capacity)측면에서가 아니라 흐름(flow)측면에서 주문품목에 대하여 모델별.낱장별로 그룹화하고 모델별 조립작업순서와 열처리공정의 투입순서 및 투입량, 열간작업에 대한 작업순서를 결정하여 전체의 생산공정이 평준화 될 수 있는 생산통제방안을 제시한다. 아울러 이 생산통제 방안들의 타당성을 평가하기 위하여 컴퓨터 시뮬레이션을 통한 분석도 행하였다.

  • PDF

Comparison of DBR with CONWIP in a Production Line with Constant Processing Times (상수 공정 시간을 갖는 라인 생산 시스템에서 DBR과 CONWIP의 성능 비교 분석)

  • Lee, Hochang;Seo, Dong-Won
    • Journal of the Korea Society for Simulation
    • /
    • v.21 no.4
    • /
    • pp.11-24
    • /
    • 2012
  • We compared a DBR(drum-buffer-rope) system with a CONWIP(constant work-in-process) system in a production line with constant processing times. Based on the observation that a WIP-controlled line production system such as DBR and CONWIP is equivalent to a m-node tandem queue with finite buffer, we applied a max-plus algebra based solution method for the tandem queue to evaluate the performance of two systems. Numerical examples with 6 workstations were also used to demonstrate the proposed analysis. The mathematical analyses support that CONWIP outperforms DBR in terms of expected waiting time and WIP. Unlike the CONWIP case, sequencing workstations in a DBR affects the performance of the system. Delaying a bottleneck station in a DBR reduces expected waiting time.

A Research of the management and the technical problems to strengthen Competitive Power of Small-medium Manufactures in south Area of the Chung-buk (충북 남부지역 중소 제조기업의 경쟁력 제고를 위한 경영 및 애로기술 실태조사 연구)

  • 윤상원;구경완;정성진;백기영;김선훈;서용성;이근복
    • Proceedings of the KAIS Fall Conference
    • /
    • 2001.05a
    • /
    • pp.66-70
    • /
    • 2001
  • 본 연구에서는 충북 남부 3개군 지역(옥천ㆍ보은ㆍ영동)의 중소 제조기업의 경영실태 및 애로기술을 대상으로 실증조사 되었다. 지역의 특정상황의 전제 하에 지방 중소기업들의 실질적인 문제점들을 발견하고, 그 개선 방안을 탐색함은 물론 산ㆍ학ㆍ연 컨소시엄 사업의 성공적인 수행을 위해 시도되었다. 세부적으로는 중소 제조기업의 경영 및 애로기술 특성을 일반적 사항, 경영애로요인, 경영전략, 현장개선기법, 정보화, 제품 및 공정 기술상의 애로기술 현황파악의 6개 영역으로 조사되었다. 조사결과들은 추후 산ㆍ학ㆍ연 공동기술개발 사업에 있어 창의적, 틈새적 과제발굴 및 신제품 기술개발의 토대마련이 될 뿐 아니라, 지역경제 발전을 위한 산ㆍ학ㆍ관의 지원 전략 수립에 적극 활용 될 것으로 판단된다.

"투명하고 공정한 하도급거래 기반 구축방안" 마련 추진

  • 한국공정경쟁연합회
    • Journal of Korea Fair Competition Federation
    • /
    • no.101
    • /
    • pp.20-23
    • /
    • 2004
  • 우리나라의 중소기업은 우리 경제의 중추세력으로, 중소하도급업체의 경쟁력 향상은 국민소득 2만불 달성을 위한 관건이라고 볼 수 있다. 공정거래위원회는 그 동안 계약체결과정에 대한 실태조사 실시, 하도급 관련 전문가의 의견 수렴 및 관계부처와 대책을 협의하는 등 자동차, 조선, 전자, 건설 등 주요 업종의 중소하도급업체 현장을 방문하여 애로사항을 파악해 왔다. 공정위는 경제상황이 어려울수록 거래상지위가 취약한 중소하도급업체들은 더욱 어려움을 겪게 되는 점을 고려, $\lceil$투명하고 공정한 하드급거래기반 구축방안거래기반 구축방안$\rfloor$을 마련하여 추진할 계획이다.

  • PDF

A study of sensitivity for making a priority of Bottleneck (애로공정 개선순위 결정을 위한 감도 분석에 대한 고찰)

  • 이복영;김정식
    • Journal of the Korean Professional Engineers Association
    • /
    • v.28 no.2
    • /
    • pp.90-97
    • /
    • 1995
  • This paper present that the improvment of the effectiveness of a 101진 system is more important than a improvement of efficiency of subsystem in improving process and pro-duction activity. Also, this paper show that how to be taken the priority of the work elements to be improved through algorithm as follows ' 1) Presentation of model process and process analysis. 2) Finding the element of delay time 3) Giving an Inter - Index to each element 4) Sensitivity analysis 5) Making a priority

  • PDF