The Settlement Behavior of Dynamically Compacted High Rock Embankment (고성토 암버력 동다짐 지반의 침하거동)

  • Jie, Hong-Keun;Bae, Kyung-Tae;Noh, Jeong-Huyn;You, Kwang-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.4
    • /
    • pp.61-69
    • /
    • 2012
  • A high rock embankment by means of phased dynamic compaction has hardly carried out in Korea. Settlement of each layer is measured in order to verify the settlement behavior of dynamically compacted high rock embankment. A high rock embankment is generally constructed by dividing into several sub-embankments. Such a sub-embankment and dynamic compaction may induce an increase of pressure at the lower part of embankment and cause a different behavior of ground from initial status. In this study, settlement of a high rock embankment is estimated using a hyperbolic model taking into construction history. The results from prediction are compared with those obtained from field measurements. And second creep settlement is predicted using pre-loading test.

A Case Study Of Dynamic Compacted Rock Embankment Design Considering Long Term Behavior (장기침하를 고려한 고성토 암버력 동다짐 지반의 설계사례)

  • Bae, Kyung-Tae;An, Sang-Yik;Park, Yong-Man;Kim, Kang-Kyu;Kim, Hyung-Suk;Lee, Woo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.967-975
    • /
    • 2009
  • In order to control differential settlement and to secure the safety of super structure on a high rock embankment the designed static compaction is changed with dynamic compaction and piled raft method. The parameters for dynamic compaction design are obtained from a pilot test. In addition, numerical analyses are also carried out to figure out the length and quantity of piled raft that can restraint the differential settlement within allowance range.

  • PDF

Settlement Behavior Of High Rock Embankment With Construction Path (시공이력을 반영한 고성토 암버력 지반의 침하거동 분석)

  • Bae, Kyung-Tae;Kim, Tae-Hoon;Kang, In-Kyu;Lee, Won-Je;Yu, Nam-Jae;Lee, Kang-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.956-962
    • /
    • 2009
  • A high embankment is generally constructed by dividing into several sub-embankments. Unlike any soil embankment, a rock embankment is constructed by means of dynamic compaction. Such a sub-embankment and dynamic compaction may induce an increase of pressure at the lower part of embankment and cause a different behavior of ground from initial status. In this study, settlement of a high rock embankment is estimated using a hyperbolic model taking into construction history. The results from prediction are compared with those obtained from field measurements and large plate loading tests.

  • PDF

A Case Study Of Construction Quality And Measurement Control of High Rock Embankment (고성토 암버력 지반의 시공품질 및 계측관리 사례)

  • Bae, Kyung-Tae;Cha, Kyung-Seob;Park, Yong-Man;Kim, Kang-Kyu;Kim, Hyung-Suk;Yi, Chang-Tok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.891-898
    • /
    • 2009
  • A high rock embankment by means of dynamic compaction has hardly carried out in domestic area. For the successful accomplishment of such a high rock embankment, construction quality and measurement control are conducted. Plate loading tests are carried out to verify the bearing capacity and safety against the long term settlement. In addition, settlement of each layer is measured in order to verify the effect of dynamic compaction and to predict long term settlement.

  • PDF

A Case Study of PHC Pile Behavior Characteristics on Dynamic Compacted High Rock Embankment (고성토 암버력 동다짐 지반에 시공된 PHC 말뚝의 거동특성 사례연구)

  • Yu, Nam-Jae;Yun, Dong-Kyun;Bae, Kyung-Tae;Kim, Hyung-Suk;Lee, Dal-Ho;Park, Yong-Man
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.519-526
    • /
    • 2010
  • The construction site for $\bigcirc\bigcirc$ transformer substation was located at a mountain valley. In order to prepare the site, the valley was first filled with crushed rock debris up to 63m. Since the main concern of this project is to minimize differential settlement of the foundation of transformer facilities, dynamic compaction was performed every 7m followed by reinforcement with EMP(Ez-Mud Piling). The EMP is one of bored piling methods, in which a hole is bored by means of air percussion and maintain by injecting Ez-Mud. Then a PHC pile (Pretensioned spun High strength Concrete pile) is embedded and finalized with a hammer. In this study, bearing capacities and long term behavior of a pile installed by EMP were investigated. To achieve these objectives, a series of tests such as static and dynamic load tests were conducted. In addition, a construction quality control standard was proposed based on the test results.