The influence of in-situ rock stress on the stability of an underground rock structure increases as the construction depth become deeper and the scale of a rock structure become larger. In general, hydraulic fracturing stress measurement has been performed in the surface boreholes of the target area at the design stage of an underground structure. However, for some areas where the high horizontal stresses were observed or where the overstressed conditions caused by topographical and geological factors are expected, it is desirable to conduct additional in-situ stress measurement in the underground construction site to obtain more detailed stress information for ensuring the stability of a rock structure and the propriety of current design. The study area was a construction site for the additional underground oil storage facility located in the south-east part of OO city, Jeollanam-do. Previous detailed site investigation prior to the design of underground structures revealed that the excessive horizontal stress field with the horizontal stress ratio(K) greater than 3.0 was observed in the construction area. In this study, a total of 13 hydraulic fracturing stress measurements was conducted in two boreholes drill from the two water tunnel sites in the study area. The investigation zone was from 180 m to 300 m in depth from the surface and all of the fracture tracing works were carried out by acoustic televiewer scanning. For some testing intervals at more than 200 m ind depth from surface, the high horizontal stress components the horizontal stress ratio(K) greater than 2.50 were observed. And the overall investigation results showed a good agreement with the previously performed test.
Choi, Yong-Ki;Han, Hyun-Hee;Kim, Sung-Hwan;Kim, Hak-Joon;Arrison, Norman L.;Kong, Hoon-Joo
Journal of Korean Tunnelling and Underground Space Association
/
v.4
no.3
/
pp.229-234
/
2002
Nowadays, the blast method is mainly operated in the fields of the rock excavation accompanied by construction site in Korea. Blast method has many merits such as improvement of workability, reducement of operation period, and etc. However, blast operation also create much loss and troubles with the neighbours for the environmental pollutions such as the noise, blast vibration, fly rocks and dusts. Thus, the non-vibration and shallow vibration methods have been used but they have also another problems in the view of the economy and the efficiency in operation. In this study, we had made laboratory tests for the breaking of the various Rock types by White Light Thermal Stress. The tests shows that one unit consuming 500kilowatts of electricity, would go 90 feet a day in tunneling if the tunnel was 16 feet by 16 feet. Also, if a faster rate of tunneling could be handled, other white light units could be added.
Kim, Tae-Yeong;Kang, Dong-Hwan;Kim, Sung-Soo;Kim, Dong-Soo;Chung, Sang-Yong
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.1929-1933
/
2008
조석에 의한 지하수위변동이 발생하는 해안가 암반대수층에서 고조(high tide)과 저조(low tide) 조건에서의 차이를 규명하기 위한 양수시험이 수행되었다. 본 연구에서 양수시험이 수행된 시험대 수층은 암반층으로서 시험공들은 해안가에서 약 180 m 이격되어 있으며, 양수정(MW1공)과 관측정(MW2공)의 이격거리는 8.05 m 이다. 양수정과 관측정 모두 공 내경은 0.205 m 이며, 케이싱심도는 지표면하 19 m 정도이다. 그리고, 양수정과 관측정의 지하수위는 지표면하 5 m 정도에 형성 되어 있으며, 시험대수층의 두께는 약 40 m 정도이다. 양수시험은 총 3회 수행되었으며, 모든 시험에서 수중모터 설치심도는 지표면하 30 m 이고 양수율은 $75\;m^3/day$로서 동일하였다. 그러나, 양수시작 시간의 차이를 두어 고조 후 1회(1차 시험), 저조 후 2회(2차 및 3차 시험) 수행되었다. 양수정과 관측정에서 자동수위측정기(Model 3001, Solinst)를 설치하여 관측된 지하수위변동 자료에 의하면, 조석현상 발생 후 시험공 내 지하수위변동 경과시간은 고조(high tide) 후 2시간, 저조 (low tide) 후 1시간 정도인 것으로 나타났다. 따라서, 양수시험 시 1차 시험은 고조 후 2시간 경과한 시점에서, 2차 및 3차 시험은 저조 후 1시간 경과한 시점에서 양수가 시작되었다. 양수시험에 의한 경과시간에 따른 수위강하량 그래프에서는 고조조건이 저조조건에 비해 수위강하량이 더 적은 것으로 나타났다. 이러한 원인은 저조에 비해 고조 조건에서는 해수에 의한 지하수위가 상승하여, 동일한 양수조건에서 수위강하량이 적게 나타난 것이다. 양수시험 자료가 AQTESOLV 3.5 프로그램을 이용하여 해석되었다. Theis method에 의해 산정된 수리전도도는 고조 조건의 양수시험에서는 $4.159{\times}10^{-6}\;m/sec$, 저조 후에서는 각각 $3.818{\times}10^{-6}\;m/sec$와 $3.926{\times}10^{-6}\;m/sec$ 이었다. 저조 후에 비해 고조 후의 수리전도도가 5% 이상 높은 것으로 산정되었다. 이상의 연구 결과들에 의해, 해안가 암반대수층에서는 양수시험 시 조석효과에 의한 수리적인 변동을 고려한 설계와 해석이 수행되어야함을 확인할 수 있었다.
The stability of rock slope is mainly controlled by the orientation and shear strength of discontinuties in rock mass. Therefore, in kinematic analysis, the orientation of the combination of discontinuities and slope face is examined to determine if certain modes of failure can be occurred. In previous kinematic analysis, a representative orientation of the slope face and mean orientation of discontinuity set were used as input parameters. However, since the orientations of slope face varies according to locations of measurement, the representative slope face orientation could cause misunderstanding for kinematic instability. In addition, since the orientations of each discontinuity are scattered in the same discontinuity set, there is the possibility that uncertainties are involved in the procedure of kinematic analysis. Therefore, in this study, the detailed digital topographic map was used to obtain the orientation of slope face. In addition, the probabilistic analysis approach was utilized to deal properly with the uncertainties in discontinuity orientation. The proposed approach was applied to steep slopes in mountain road located in Baehuryeong, Chunncheon city, Gangwon-Do. The analysis results obtained from the deterministic and probabilistic analysis were compared to check the feasibility of proposed the analysis.
The development of an excavation damaged zone, EDZ, due to the blasting impact and stress redistribution after excavation, can influence on the long tenn stability, economy, and safety of the underground excavation. In this study, the size and characteristics of an EDZ around an underground research tunnel, which was excavated by controlled blasting, in KAERI were investigated. The results were implemented into the modelling for evaluating the influence of an EDZ on hydro-mechanical behavior of the tunnel. From in situ tests at KURT, it was possible to determine that the size of EDZ was about l.5rn. Goodman jack tests and laboratory tests showed that the rock properties in the EDZ were changed about 50% compared to the rock properties before blasting. The size and property change in the EDZ were implemented to a hydro-mechanical coupling analysis. In the modeling, rock strengths and elastic modulus were assumed to be decreased 50% and. the hydraulic conductivity was increased 1 order. From the analysis, it was possible to see that the displacement was increased while the stress was decreased because of an EDZ. When an EDZ was considered in the model, the tunnel inflow was increased about 20% compared to the case without an EDZ.
Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
2004.09a
/
pp.108-112
/
2004
균열 암반 대수층에 대한 지하수 인공 함양 주입 가능성을 예비적으로 평가하기 위한 시험을 수행하였다. 지하수 인공 함양 주입 시험이 수행된 지역은 경기도 포천군 이동면이며, 이 지역의 지질은 중립내지 조립질 화강암에 해당된다. 시험 정호에 대한 시추공 내부 촬영 결과, 화강암 내에 부분적으로 절리들이 발달되어 있었으며, 대체로 수직적인 절리 발달이 우세하였다. 2개소에서 인공 함양 주입 시험이 100kgf/$\textrm{cm}^2$ 이상의 확장 팩커로 대상공의 상부를 밀폐한 후 시행되었다. 이중 MW-7호 공에서는, 주입 압력을 5 내지 7kg/$\textrm{cm}^2$으로 조절하여 시간당 약 450$\ell$의 평균 주입률로 시험을 수행하였으며, O-7a 호 공에서는 주입 압력을 4kgf/$\textrm{cm}^2$ 내외, 시간당 약 1,740$\ell$의 평균 주입률로 시험을 수행하였다. MW-7호 공의 시험은 3일간 3회에 걸쳐 각 450분, 200분, 414분 동안 시험이 수행되었으며, O-7a호 공에서는 연속적으로 24시간 동안 인공 함양 주입 시험이 수행되었다. 수행된 지하수 인공 함양 주입시험은 적어도 지하수 상류 구배 구간의 지하 수두를 시험이 수행된 이후에도 24시간 이상 유지하는 것으로 평가되었다. 실험을 통해 주입한 양과 주변 관측공의 수위 상승을 단순 검토한 결과 시험이 수행된 지역의 개략적 유효 공극률을 산정 할 수 있었으며, 그 결과, 이 지역 균열 암반의 유효 공극률은 약 3 내지 6% 인 것으로 평가되었다 국내에서 지하수 인공 함양 방식을 균열 암반 대수층에 활용하여, 지속적인 수자원 관리와 수도 공급을 할 수 있는지를 평가하기 위해서는 앞으로 보다 많은 시험수행과 연구를 통한 검증이 요구된다. 까마중, 냉이, 명아주, 둑새풀 등의 생장에 현저한 조해현상을 나타냈다. 이것으로 보아 억새가 타식물의 생장에 영향을 주는 요인물질은 억새의 뿌리에서 분필되는 것으로 생각된다. 옥수수의 뿌리에서 직접 분필하는 물질이나 옥수수뿌리의 분해물질들은 모두 당귀의 생장을 조해하는 경향이 있었다.기존에 제안된 경험식들에 의한 계산결과 보다 균질화 해석법의 결과가 훨씬 정확함을 주목하여야 한다.c의 범위로서 최대값과 최소값은 4차수(four order)의 차이를 보였다. 단열대의 분포 특성을 파악하기 위하여 지구물리검층을 실시하였고, 각 시험에 의해 획득된 결과들과의 비교를 통하여 유동성이 높은 단열들이 규명되었다. 온도검층은 유동성 단열과 일반적인 단열들을 구별하는 좋은 지시자로 나타났다. 그 결과, N70-80$^{\circ}$W.60-85$^{\circ}$NE/SW, N75-80$^{\circ}$W.25-30$^{\circ}$SW, N50-64$^{\circ}$W.60-85$^{\circ}$NE, N35-45$^{\circ}$E.65-75$^{\circ}$SE, 그리고 N65-72$^{\circ}$E.80$^{\circ}$SE/60$^{\circ}$NW의 단열들이 연구지역의 지하수 흐름을 지배하는 뚜렷한 유동성 단열로 규명되었다.eatments. It was resulted from increase of weight of single cocoon. "Manta"2.5ppm produced 22.2kg of cocoon. It is equal to 9% increase in index, as compared to that of c
Kim, Chang-Hwan;Jeong, Eui-Young;Park, Chan-Hong;Jou, Hyeong-Tae;Lee, Seung-Hoon;Kim, Ho
한국지구물리탐사학회:학술대회논문집
/
2008.10a
/
pp.207-212
/
2008
Bathymetry, side scan sonar, and magnetic survey data for the summit area of Dokdo obtained by Korea Ocean Research & Development Institute in 1999, 2004, and 2007 were analyzed to investigate the geophysical characteristics of the summit. Bathymetry and topographic data for the summit of Dokdo show uneven seabed and irregular undulations from costal line to -90 m in water depth, indicating the effects of partial erosions and taluses. The stepped slope in the bathymetry is supposed to be a coastal terrace suggesting repetition of transgressions and regressions in the Quaternary. The bathymetry and the side scan sonar data show a small crater, assumed to be formed by post volcanisms, at depth of $-100\;{\sim}\;-120\;m$ in the northeastern and the northwestern parts of the survey area. Except some areas with shallow sand sedimentary deposits, there are rocky seafloor and lack of sediments in the side scan sonar images of the survey area, dominantly. The analytic signal of the magnetic anomaly coincides with other geophysical results regarding to the location of the residual crater. The geophysical constraints of the summit of Dokdo propose that the islets and the rocky seabed elongated northeastward and northwestward from the islets might be the southern crater of the Dokdo volcano.
In step-by-step site selection for geological disposal of high-level radioactive waste, parameters necessary for site selection will be acquired through deep drilling surveys from the basic survey stage. Unlike site investigations of rock mass structures such as tunnels and underground oil storage facilities, those related to the geological disposal of high-level radioactive waste are not only conducted in relatively deep depths, but also require a high level of quality control. In this report, based on the 750 m depth drilling experience conducted to acquire the parameters necessary for deep geological disposal, the methodology for deep drilling and the geology, geophysics, geochemistry, hydrogeology and rock mechanics obtained before, during, and after deep drilling are discussed. The procedures for multidisciplinary geoscientific investigations were briefly described. Regarding in-situ stress, one of the key evaluation parameter in the field of rock engineering, foreign and domestic cases related to the geological disposal of high-level radioactive waste were presented, and variations with depth were presented, and matters to be considered or agonized in acquiring evaluation parameters were mentioned.
Journal of Korean Tunnelling and Underground Space Association
/
v.25
no.2
/
pp.141-155
/
2023
Monitoring technology based on electrical resistivity is widely used for non-destructive data collection and health analysis of underground structures and tunnels. Vulnerable sections such as fault zone generates many problems during construction of the tunnel. These problems cause displacement and stress changes of the ground. Therefore, it is necessary to predict the state of the fault zone section to ensure the mechanical stability of the underground structure. Monitoring the size of joints and the porosity of the fillings is essential for rocks. Previous studies have not considered the variety of fillings in rock joints. In this study, electrical resistivity tests were conducted according to the particle mixing state of the sandy fillings. When the size of fillings is decreased at the constant porosity, the electrical resistivity tends to increase. The results of this study are expected to be useful as basic electrical resistivity data for predicting the ground conditions and evaluation of the ground behavior that is containing sandy fillings in the rock joint for tunnels.
The slope reinforcing method utilized in this paper reinforces the ground overall by means of filling borehole as well as permeating grout material into ground by injecting it through the grouting pipe. In order to reflect these characteristics to design, not only the ground reinforcing effect by the structural material itself but also the ground strength improvement effect by the grouting injection must be quantitively evaluated. But precedent research of it has been insufficient. Therefore, the slope reinforcing method was applied to the weathered rockmass slope situated in the highway in order to analyze reinforcing effect and the instrumentation of slope was performed. Through analysis of this field test, the slope reinforcing method was proved to be effective and back analysis method based on instrumentation values of slope was proposed to apply to reinforcing design. In this paper, the effectiveness of reinforcing method was certified through proposed back analysis.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.