• Title/Summary/Keyword: 암반 취약화

Search Result 11, Processing Time 0.019 seconds

Field Demonstration of Pre-Fracturing for Controlling Noise and Vibration (선행이완발파의 진동 및 소음 제어 효과 검증을 위한 발파 시험 시공)

  • Juhyi Yim;Bong Cheol Lee;Jae Hoon Jung;Han Byul Kang;Jae Won Lee;Young Jin Shin
    • Explosives and Blasting
    • /
    • v.42 no.3
    • /
    • pp.49-57
    • /
    • 2024
  • Pre-fracturing is the blasting method to weaken the rock mass prior to the main excavation. This study aims to evaluate the effectiveness of pre-fracturing by using half the explosive charge typically employed in conventional blasting designs. Field tests conducted at a quarry in Gapyeong showed that noise levels were reduced by 2.7 dB due to the decreased amount of explosive per blast hole, and vibration levels were controlled to the precision vibration control blasting standard. Rock weakening was confirmed through induced cracks observed on the surface and core samples, and it was noted that the weakening effect of the blasting decreased as the burden increased. The vibrations from conventional blasting were found to be lower than those from pre-fracturing. This was attributed more to the geological conditions, such as joints, rather than the blasting design factors like explosive amount, burden, and the number of free face.

The Improvement of Excavation Efficiency of Roadheader by Using Pre-Cracked Method in High Strength Rock (선균열공법을 활용한 고강도 암반구간 로드헤더 굴진효율 향상방안 연구)

  • Hyung-Ryul Kim;Sang-Jun Jung;Jun-Ho Kang
    • Tunnel and Underground Space
    • /
    • v.33 no.3
    • /
    • pp.141-149
    • /
    • 2023
  • Recently, as the demand for urban underground space increases, urban tunnel planning is actively progressing. In particular, the application of the roadheader excavation method, which has favorable applicability to urban tunnel, is increasing. However, it is known that the roadheader excavation method has a limitation in that excavation efficiency for high strength rock with a Uniaxial Compressive Strength (UCS) of 100 MPa or more is lowered. In this study, The pre-cracked method was presented as a method to improve the excavation efficiency of roadheader for high strength rock and its applicability was evaluated. The net cutting rate was evaluated using the Bilgin prediction formula, which can calculate the net cutting rate by considering the UCS and RQD (Rock Quality Designation). It was found that the net cutting rate increased as the RQD decreased under the rock condition with the same UCS. This is judged to increase the excavation efficiency of the roadheader in the jointed high strength rock. Additionally, the field applicability of the pre-cracked method for high strength rock was verified through field tests. It was confirmed that the crack zone was formed around the charging hole, and it is considered that the pre-cracked method can be applied to the high strength rock.

3D Tunnel Face Modelling for Discontinuities Characterization: A Comparison of Lidar and Photogrammetry Methods (불연속성 특성화를 위한 3차원 터널 막장 모델링: 라이더 및 사진 측량 접근 방식의 비교 분석 중심으로)

  • Chuyen, Pham;Hyu-Soung, Shin
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.549-557
    • /
    • 2022
  • Tunnel face mapping involves the determination of rock discontinuities or weak rock conditions where extra support might be required. In this study, we investigated the application of Lidar scanning and photogrammetry to quantitatively characterize discontinuities of the rock mass on the tunnel face during excavation. The 3D models of tunnel faces generated by using these methods enable accurate and automatic discontinuity measurement to overcome the limitations of manual mapping. The results of this study show that both photogrammetry and Lidar can be used to reconstruct the 3D model of the tunnel face, although the photogrammetric 3D model is less detailed than its counterpart produced by Lidar. Given acceptable accuracy and cost-effectiveness, photogrammetry can be a fast, reliable, and low-cost alternative to Lidar for acquiring 3D models and determining rock discontinuities on tunnel faces.

Real-time Seismic Damage Estimation for Harbor Site Considering Ground Motion Amplification Characteristics (항만지역의 지반증폭 특성을 반영한 실시간 지진피해 평가방안 수립)

  • Kim, Han-Saem;Yoo, Seung-Hoon;Jang, In-Sung;Chung, Choong-Ki
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.5
    • /
    • pp.55-65
    • /
    • 2012
  • The purpose of this study is to estimate seismic damage for harbor site considering dynamic amplification characteristics. First of all, a series of ground response analysis is performed and then correlation equations between rock outcrop accelerations and peak ground accelerations (PGAs) are determined. These equations are saved into DB and when an earthquake occurs, PGAs are determined by them as soon as possible. For earthquake events, seismic damage grades of harbor structures are determined by using the correlated PGAs and fragility curves of harbor structures in real time. In this study, seismic damage was estimated and classified into several grades by applying two hypothetical earthquakes.

Case study of landslide types in Korea (우리나라 산사태의 형태분류에 따른 사례)

  • 김원영;김경수;채병곤;조용찬
    • The Journal of Engineering Geology
    • /
    • v.10 no.2
    • /
    • pp.18-35
    • /
    • 2000
  • The most dominant type of landslide in Korea is debris flows which mostly take place along mountain slopes during the rainy season, July to August. The landslides have been reported to begin activation when rainfall is more than 200mm within 2days. The debris flows are usually followed by translational slips which occur upper part of mountain slopes and they transit to debris flow as getting down to the valleys. Lithology, location, slope inclination, grain size distribution of soil, permeability, dry density and porosity have been proved as triggering factor causing translational slides. The triggering data taken from mapping are statistically analysed to get landslide potential quantitatively. Rock mass creeps mostly occur on well bedded sedimentary rocks in Kyeongsang Basin. Although the displacement of rock mass creep is relatively small about 1m, the creep can cause severe hazards due to relatively large volume of the involved rock mass. Examples are rock mass creep occurred in the mouth of Hwangryongsan Tunnel, in Chilgok and in Sachon in 1999. Although the direct factor of the creeps are due to slope cutting at the foot area, more attention is required A rotational slide occurring within thick soil formation or weathered rock is also closely related to bottom part of slope cutting. It is propagated circular or semi-circular type. Especially in korea, the rotational slide may be frequently occurred in Tertiary tuff area. Because they are mainly composed of volcanic ash and pyroclastic materials, well developed joints and high degree of swelling and absorption can easily cause the slide. The landslide among the Pohang-Guryongpo national road is belong to this type of slide.

  • PDF

Mechanical Behavior of Tunnel Portal in Horizontal Arch Slope (수평 아치형 터널 갱구부 비탈면의 역학적 거동)

  • Yang, Mun-Sang;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.50-61
    • /
    • 2000
  • The ground around the portal of a tunnel is the most typical part showing the 3-dimensional mechanical behavior in the tunnel. The portal slope is constructed at the weathered soft rock-mass, and remains as a potential sliding mass. The slope failure around the tunnel portal may happen drastically and induce the great disaster; hence, for the permanent stability several special techniques are required. To solve this problem, the ground around the tunnel portal may be excavated in the arch shape to develop the arching effect in horizontal direction. With the arch-type portal slope, one can reduce considerably the excavation mass and the damage of environments. This approach has not been attempted yet due to the lack of understanding and the well-defined analyzing method, so the retaining wall type portal is more universal. The 3-dimensional finite element analyses were carried out to prove that the arch type is more advantageous in safety and cost than the right angle type. The influence of the tunnel construction sequence and the strength of the rock-mass on the slope stability was investigated by focusing on the maximum shear strain in the slope, and the yield zone at the tunnel face.

  • PDF

Site Classification for Incheon According to Site-Specific Seismic Response Parameters by Estimating Geotechnical Spatial Information Based on GIS (GIS 기반 지반공간정보 추정을 통한 부지고유 지진응답 매개변수 기반 인천 지역의 부지분류)

  • SUN, Chang-Guk;KIM, Han-Saem
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.19 no.4
    • /
    • pp.17-35
    • /
    • 2016
  • Earthquake-induced disasters are often more severe in locations with soft soils than firm soils or rocks due to differences in ground motion amplification. On a regional scale, such differences can be estimated by spatially predicting subsurface soil thickness over the entire target area. In general, soil deposits are generally deeper in coastal or riverside areas than in inland regions. In this study, a coastal metropolitan area, Incheon, was selected to assess site effects and provide information on seismic hazards. Spatial prediction of geotechnical layers was performed for the entire study area within the GIS framework. Approximately 7,000 existing borehole drilling data in the Incheon area were gathered and archived into the GIS Database (DB). In addition, surface geotechnical data were acquired from a walkover survey. Based on the built geotechnical DB, spatial zoning maps of site-specific seismic response parameters were created and presented for use in a regional seismic strategy. Site response parameters were performed to determine site coefficients for seismic design over the entire target area and compared with each other. Site classifications and subsequent seismic zoning were assigned based on site coefficients. From this seismic zonation case study in Incheon, we verified that geotechnical GIS-DB can create spatial zoning maps of site-specific seismic response parameters that are useful for seismic hazard mitigation particularly in coastal metropolitan areas.

Execution Case Study on the Explosive Demolition of a Large-Section RC Special Structure (대단면 철근콘크리트 특수구조물 발파해체 시공 사례)

  • Park, Hoon;Suk, Chul-Gi
    • Tunnel and Underground Space
    • /
    • v.19 no.5
    • /
    • pp.397-406
    • /
    • 2009
  • Recently, the number of industrial structures that must be demolished due to structural deterioration and unsatisfactory functional conditions has been increased. To minimize environmental hazardous factors created during the process of demolition, the explosive demolition method has been applied increasingly. This execution case was intended to describe an application of the explosive demolition method to the demolition of a Crusher & Screen structure, which was a large-section reinforced concrete special structure. It was deemed necessary due to its structural deterioration and unsatisfactory functional condition. Various pre-weakening processes and blasting patterns were applied to the large-section reinforced concrete members, and to reduce blasting vibration and impact vibration, time intervals were established for blasting in the same column and for blasting between blasting blocks. By applying the explosive demolition method to the demolition of a large-section reinforced concrete special structure, the explosive demolition was completed safely and efficiently, without causing any damage to surrounding facilities.

Stability and Damage Evaluation of the Buddha Triad and 16 Rock-Carved Arhat Statues at Seongbulsa Temple in Cheonan, Korea (천안 성불사 마애석가삼존과 16나한상의 손상도 및 안정성 평가)

  • Yang, Hyeri;Lee, Chan Hee;Jo, Young Hoon
    • Korean Journal of Heritage: History & Science
    • /
    • v.53 no.4
    • /
    • pp.78-99
    • /
    • 2020
  • The Buddha triad and 16 Arhat statues carved on the rock surface at Seongbulsa temple is the only domestic remaining example of all 16 Arhats, so its academic value is very high. However, it is severely damaged and so required a stability evaluation through study of digital documentation and precise diagnosis for the purpose of comprehensive conservation. This process established that the Buddha statues were of similar scale, while the Arhats showed a wide variety of sizes, and the two kith and kin in the volume were larger than the Arhats. It was estimated that the statues of food for Buddha are similar to the Arhat statues, and most of the statues are well-formed. The rock used to carve the Buddha statues is banded gneiss with distinct foliation, alternating between white bands of quartz and feldspar and black bands composed of biotite. The Buddha statues have been damaged by physical weathering, discoloration, and biological contamination. In damage evaluations, joint (3.6 crack index), peeling (5.2%), exfoliation (1.7%), and falling off (0.1%) were observed on the rock surface of the Buddha statues. In particular, due to severe biological weathering, stage 9 and 10 biological coverage of the rock surface accounted for 57.5% of the total area, and stages 5 to 8 also accounted for a high share at 22.3%. The discoloration factors were shown to be dark brown and white with Fe, Ca, and S, and a large amount of C detected in the blackened contaminants, and the damage weight high in all areas. Discontinuities in different directions were identified in the rock surface. Analysis of potential rock failure types indicated that there is a possibility of plane and toppling failure, but wedge failure is unlikely to occur. The mean ultrasonic velocity of the main rock surface was 2,463m/sec, the lower part of the left side with a large number of joints was relatively low, and the highly weathered (HW) type to the completely weathered (CW) type concentrated distribution, showing weak properties. For the Buddha statues, conservation treatment is required for about 14.9% of micro cracks and 58.9% of exfoliation cracks. In addition, in order to improve the conservation environment of the Buddha statues, maintenance of drainage and ground preparations for the rock surface gradient and plants are necessary, and protection facilities should be reviewed for long-term conservation and management purposes.

Development of Smart Mining Technology Level Diagnostics and Assessment Model for Mining Sites (광산 현장의 스마트 마이닝 기술 수준 진단평가 모델 개발)

  • Park, Sebeom;Choi, Yosoon
    • Tunnel and Underground Space
    • /
    • v.32 no.1
    • /
    • pp.78-92
    • /
    • 2022
  • In this study, we proposed a diagnostics and assessment model for mining sites that can evaluate the smart mining technology level in a systematic and structured way. For this, the maturity of the smart mining was defined, and detailed assessment items of the diagnostics and assessment model for smart mining were derived by considering the smart factory diagnostics and assessment model (KS X 9001-3) used in the manufacturing industry. While maintaining the existing system, the existing 46 detailed assessment items were modified to be suitable for mining. As a result, a total of 29 detailed assessment items were derived in the areas of promotion strategy, process, information system and automation, and performance. Based on this, a questionnaire was designed to diagnose the level of smart mining technology, and assessment was performed by applying it to domestic iron mines. The level of smart mining technology in the study area was found to be level 2, and it could be inferred that it was about 40% lower than the average smart level of the general manufacturing industry. In addition, by using the developed model, it was possible to recognize the weak points of the mine at each stage of the introduction, operation, and advancement of smart mining, and to suggest investment and improvement directions.