• Title/Summary/Keyword: 안전설비

Search Result 2,193, Processing Time 0.027 seconds

Performance Evaluation of Wireless Sensor Networks in the Subway Station of Workroom (지하철 역사내 기능실에 대한 무선 센서 네트워크 성능 분석)

  • An, Tea-Ki;Shin, Jeong-Ryol;Kim, Gab-Young;Yang, Se-Hyun;Choi, Gab-Bong;Sim, Bo-Seog
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1701-1708
    • /
    • 2011
  • A typical day in the subway transportation is used by hundreds of thousands are also concerned about the safety of the various workrooms with high underground fire or other less than in the subway users could be damaging even to be raised and there. In 2010, in fact, room air through vents in the fire because smoke and toxic gas accident victims, and train service suspended until such cases are often reported. In response to these incidents in subway stations, even if the latest IT technology, wireless sensor network technology and intelligent video surveillance technology by integrating fire and structural integrity, such as a comprehensive integrated surveillance system to monitor the development of intelligent urban transit system and are under study. In this study, prior to the application of the monitoring system into the field stations, authors carried out the ZigBee-based wireless sensor networks performance analyzation in the Chungmuro station. The test results at a communications room and ventilation room of the station are summarized and analyzed.

  • PDF

A Study on the Specialized Classrooms of Governmental Secondary Schools in the Japanese Colonial Era -Focused on Architectural Drawings for Collected by National Archives of Korea (일제 강점기 관립 중등학교 특별교실에 관한 연구 -국가기록원 소장 학교건축 도면을 중심으로)

  • Lee, Jeong-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.4
    • /
    • pp.2476-2483
    • /
    • 2014
  • This study aims to review the characteristics of specialized classrooms for governmental secondary schools in the Japanese Colonial Era by analyzing architectural drawings collected by National Archives of Korea. The results of this study are summarized as follows 1) Under the influence of Japanese science promotion of that time, specialized classrooms for science were considered as one of essential facilities. Typically exclusive specialized classrooms were assigned to two major science subjects : physics-chemistry and biology. 2) To science specialized classrooms, ancillary rooms for preparation, experiment equipment and specimen were attached and science lecture room with stepped floor was planned additionally only for the lecture on theories and the demonstration of experiment. 3) Specialized classrooms for science were zoned independently of other facilities because of the special equipments and safety. 4) Art rooms were common to both boys' and girls' schools but concerning music rooms, girls' schools had special concerns, whereas boys' schools did not. 5) Specialized classrooms for homemaking subject of girls' school were as much important as those for science subjects of boys' school. 6) Some early-established Korean boys' schools had handicraft rooms which were the symbol of vocational education-oriented, unequal policy on Koreans. Though not general cases, specialized classrooms for geography-history were planned for Japanese boys' school. Restricted to governmental secondary schools but considering the uncommon state of specialized classrooms of that time, these characteristics show conditions of early time when special classrooms were introduced into Korea.

Dynamic Response of Plate Structure Subject to the Characteristics of Explosion Load Profiles - Part B: Analysis for the Effect of Explosion Loading Time According to the Natural Period for Target Structures - (폭발하중 이력 특성에 따른 판 구조물의 동적응답 평가 - Part B: 고유주기에 따른 폭발하중 지속시간의 영향 분석 -)

  • Kang, Ki-Yeob;Choi, Kwang-Ho;Ryu, YongHee;Choi, JaeWoong;Lee, Jae-Myung
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.2
    • /
    • pp.197-205
    • /
    • 2015
  • Offshore structures for the gas production are exposed to the risk of gas leaks, and gas explosions can result in fatal damages to the primary structures as well as secondary structures. To minimize the damage from the critical accidents, the study of the dynamic response of structural members subjected to blast loads must be conducted. Furthermore, structural dynamic analysis has to be performed considering relationships between the natural frequency of structural members and time duration of the explosion loading because the explosion pressure tends to increase and dissipate within an extremely short time. In this paper, the numerical model based on time history data were proposed considering the negative phase pressure in which considerable negative phase pressures were observed in CFD analyses of gas explosions. The undamped single degree of freedom(SDOF) model was used to characterize the dynamic response under the blast loading. A blast wall of FPSO topside was considered as an essential structure in which the wall prevents explosion pressures from the process area to utility and working areas. From linear/nonlinear transient analyses using LS-DYNA, it was observed that dynamic responses of structures were influenced by significantly the negative time duration.

A Case Study on the Implementation of Integrated Operation System of the Nakdong River Estuary Barrage Due to the Drainage Gate Extension (낙동강 하굿둑의 배수문 증설에 따른 통합운영시스템의 구축 사례에 대한 연구)

  • Kim, Seokju;Lim, Taesoo;Kim, Minsoo
    • The Journal of Society for e-Business Studies
    • /
    • v.20 no.1
    • /
    • pp.183-199
    • /
    • 2015
  • Due to the Four Major Rivers Restoration Project, Nakdong River Estuary Barrage's designed flood quantity has been largely increased, and this has caused to construct several drainage gates at the right side of Eulsukdo island to secure the safety of downstream river area. For successful functioning of Nakdong River Estuary Barrage, such as flood control, disaster prevention, and the securing of sufficient water capacity, drainage gates at the both sides of island have to operate systematically and reliably. To manage this under restricted personnel and resources, we have implemented the IOS (Integrated Operation System) by integrating previous facilities and resources via information and communication technologies. The IOS has been designed to have higher availability and fault tolerance to function continuously even with the partial system's failure under the emergency situation like flood. Operators can use the system easily and acknowledge alarms of facilities through its IWS (Integrated Warning System) earlier. Preparing for Integrated Water Resources Management and Smart Water Grid, the architecture of IOS conformed to open system standards which will be helpful to link with the other systems easily.

Analysis of the Actual Conditions of the Asphalt Regulations by Fire Service Organizations and Explosion Cases (아스팔트에 대한 소방기관의 규제 실태와 폭발사례의 분석)

  • Lee, Eui-Pyeong
    • Fire Science and Engineering
    • /
    • v.31 no.3
    • /
    • pp.97-105
    • /
    • 2017
  • Because asphalt is a solid at normal temperature and is not a hazardous material as stipulated in the Safety Management Act on Hazardous Materials, it is often recognized as having no risk of fire or explosion. On the other hand, it is as dangerous as flammable liquid because it is heated to $170-180^{\circ}C$ and stored in a storage tank. This study analyzed the risk of fire and explosion during the storage and handling of asphalt and the actual conditions of asphalt regulations by fire service organizations. Moreover, this study analyzed the domestic case of explosions in the production process of asphalt concrete (ASCON) and domestic and foreign cases of asphalt storage tank explosions. The analysis suggested that unlike Japan, Korea has no asphalt regulations in fire service organizations. Explosions can occur when ignition is delayed after fuel is sprayed on the dryer drum burner of the aggregates during the production of ASCON. A physical explosion can occur in the storage tank when environmental purification facilities suddenly work strongly to remove air pollutants or bad smells during the heating of asphalt in an asphalt storage tank. In addition, explosions can occur when fires such as welding is performed in the asphalt storage tank.

Problems and Improvement Directions of Fire Protection Designing and Supervising Jobs (소방 설계·감리업의 문제점 및 개선방향에 관한 연구)

  • Cha, Jong-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8745-8752
    • /
    • 2015
  • Since many accidents have occurred in Korea in these days, many people have lost their health and have been damaged. The damages caused by fires which occur to many buildings where many people always reside takes a substantial share of the total damages. And since the proportions of the domestic fire protection designing/supervising industries are relatively much disregarded compared to other kinds of work, it is in the situation that there are many cases of serious damages because the fire protection equipment didn't exert the proper functions on fire after a building is constructed since the supervision against the poor construction along with the inadequate design. In order to improve such situations, in case of the design industry, the criteria on registration and workforce placement, the scope of operation, the design documents required when requesting the agreement to the construction permits, the responsibilities and authorities about the jobs of the fire protection facility designers must be improved and, in case of supervising industry, the registration criteria, the operation scope and the kinds, methods, targets and criteria of supervision, the criteria on the additional placement of assistant supervisors, the contents and scope of work must be improved, the PQ system and Public Supervision System must be reviewed and the systems for preventing any poor supervision must be improved in order to pursue the security of the people and their properties at the same level as the other kinds of work by preparing for the firm position and foundation of the fire protection design and supervision.

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF

Development of Web-based Facility Management System by utilizing Information in Construction Phase (시공단계 정보 활용을 통한 웹 기반 유지관리 시스템 개발)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.99-106
    • /
    • 2004
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility, Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from an asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

A Study on Dynamic Positioning System IMO class upgrade requirements (Dynamic Positioning System의 IMO Class 변경 요건에 관한 연구)

  • Chae, Chong-Ju
    • Journal of Navigation and Port Research
    • /
    • v.39 no.3
    • /
    • pp.165-172
    • /
    • 2015
  • The class of Dynamic Positioning System is divided in 3 classes depending on its redundancy and reliability according to IMO and classification society. There are 3 DP classes such as DP Class 1, 2 and 3 according to IMO MSC/Circ. 645. Higher DP class vessel has higher reliability, since redundancy concept is applied to the DP vessel depending on its DP class and can operate more safely. There are not enough information about DP class notation, which are needed when a company builds a new or buys second hand DP vessel or modifies DP classes, even the Korean shipyard is building a lot of DP vessels now. Also, the practical case of DP vessel modification, which had been done in Korea, to meet DP notation of IMO and classification society, will be helpful for DP vessel modification and sales industry development in Korea as a new business. As such this research identified what kind of requirements need to be taken into account to be from DP class 1 to DP class 2. The real DP class modification case is used to identify the requirements of DP class upgrade. Through the FMEA the redundancy concept on power system, thruster system and DP control system need to apply for DP class upgrade. The power system have to keep its DP function even if just a single fault happens on the generator or switchboard. Also, the PMS is required to monitor and control power system. Ship's Surge, Sway and Yaw movements can be controlled by the remaining thruster system after a single thruster fails. Lastly, multiple installation of PRS, sensors and DP control system are required to keep DP ability after a single fault on the DP control systems.

The Site Installation Test of Single-Phase MJ81 Switch Point Machine Localization (단상 MJ81 전기선로전환기 국산품의 현장설치시험)

  • Baek, Jong-Hyen;Kim, Yong-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.12
    • /
    • pp.3632-3637
    • /
    • 2009
  • In this paper, we describe the performance results of the field installation test which is required to practicalize the single-phase MJ81 Switch Point Machine. This product has passed the certified test through performance improvement of driving parts in order to use 3 phase MJ81 Switch Point Machine, which is localized by taking over technology from Alstom and Cogifer when constructing Seoul-Busan rapid-transit railway, without change of the electrical equipment at track-side in domestic existing lines which single-phase 220V is used. KRRI and Samsung SDS have localized the single-phase MJ81 Switch Point Machine to improve the speed and safety of the conventional lines through the existing railway technology development project. For practicalization of this, we should, however, verify the performance through not only field installation test in real lines but also interface test with the interlocking. In this paper we verify the practicality of the domestic single-phase MJ81 Switch Point Machine through analysis on the performance result of the field installation test as well as the research contents for this test. Thereby, in Feb 2009 we have received an order from the Korea Rail Network Authority and are currently installing the single-phase MJ81 Switch Point Machine.