• 제목/요약/키워드: 안전계장기능

검색결과 5건 처리시간 0.02초

개인적 위험도를 고려한 수소충전소의 안전계장기능 향상에 관한 연구 (A Study on the Improvement of Safety Instrumented Function of Hydrogen Refueling Station Considering Individual Risk)

  • 변윤섭
    • 한국수소및신에너지학회논문집
    • /
    • 제34권3호
    • /
    • pp.297-306
    • /
    • 2023
  • The frequency of fatal accidents that can occur at hydrogen refueling station was compared with the risk criterion for the general public suggested by the health and safety executive. If hydrogen refueling station meets the accident prevention facility standards presented in KGS Code FP216/217, it was confirmed that the risk of hydrogen refueling station was not at an unacceptable (intolerable) risk level. However, the risk of hydrogen refueling station due to small leak was analyzed as low as reasonably practicable. Therefore, methods for improving the safety instrumented function of hydrogen refueling station were reviewed. It was confirmed that the risk of hydrogen refueling station can be affected by the number of installed safety instrumentation system components, redundant architecture, mission time, proof test interval, etc. And methods for maintaining the risk of hydrogen refueling station at an acceptable risk level have been proposed.

이중연료엔진의 연료가스공급시스템에 대한 안전무결도 기반 안전계장시스템 설계 (SIS Design for Fuel Gas Supply System of Dual Fuel Engine based on Safety Integrity Level(SIL))

  • 강낙원;박재홍;정정호;나성
    • 대한조선학회논문집
    • /
    • 제49권6호
    • /
    • pp.447-460
    • /
    • 2012
  • In this study, the shutdown system of the fuel gas supply system is designed based on the Safety Integrity Level of IEC 61508 and IEC 61511. First of all, the individual risk($10^{-4}$/year) and the risk matrix which are the risk acceptance criteria are set up for the qualitative risk assessment such as the HAZOP study. The natural gas leakage at the gas supply pipe is identified as the highest risk among the hazards identified through the HAZOP study and as a safety instrumented function the shutdown function for leakage was defined. SIL 2 and PFD($2.5{\cdot}10^{-3}$) for the shutdown function are determined by the layer of protection analysis(LOPA). The shutdown system(SIS) carrying out the shutdown function(SIF) is verified and designed according to qualitative and quantitative requirements of IEC 61508 and IEC 61511. As a result of SIL verification and SIS conceptual design, the shutdown system is composed of two gas detectors voted 1oo2, one programmable logic solver, and two shutdown valve voted 1oo2.

기능적 안전을 고려한 FSA기반 기관 구역 화재 안전성 평가 및 개선 (Fire Safety Assessment Based on FSA and Risk Reduction of Machinery System Considering Functional Safety)

  • 서성원;양영순;정소연;유원선
    • 대한조선학회논문집
    • /
    • 제49권3호
    • /
    • pp.239-246
    • /
    • 2012
  • It is the well-known fact that most part of goods transported are moved on the unfavorable ocean and even a small amount of accident on sea is extremely dangerous for human lives, financial losses, and social responsibility. Among the several causes of accidents, those by fire have occurred frequently and their damage has been highly serious. The aim of this paper is to assess the risk of fires due to oil leakage in the machinery space. To define the possible fire scenario, our team has performed the search of casualty database and reviewed the previous and various studies in the field. As a result, it is noted that the quantitative risk of the fire scenario have been evaluated on the ground of the FSA risk model. The expected frequency of a fire amounts to incidents during the life of a ship, and the expected financial damage amounts to 5,654 USD per a ship. By adopting Safety Instrumented System (SIS) introduced in IEC 61508 and IEC 61511, SIS model is designed to prevent oil leakage fire as a risk reduction method. It is concluded that System Integrity Level (SIL) 1 seems to be appropriate level of SIS.

수소화 탈황 반응기 히터의 안전계장기능 신뢰도 향상에 관한 연구 (A Study on the Improvement of Reliability of Safety Instrumented Function of Hydrodesulfurization Reactor Heater)

  • 곽흥식;박달재
    • 한국안전학회지
    • /
    • 제32권4호
    • /
    • pp.7-15
    • /
    • 2017
  • International standards such as IEC-61508 and IEC-61511 require Safety Integrity Levels (SILs) for Safety Instrumented Functions (SIFs) in process industries. SIL verification is one of the methods for process safety description. Results of the SIL verification in some cases indicated that several Safety Instrumented Functions (SIFs) do not satisfy the required SIL. This results in some problems in terms of cost and risks to the industries. This study has been performed to improve the reliability of a safety instrumented function (SIF) installed in hydrodesulfurization reactor heater using Partial Stroke Testing (PST). Emergency shutdown system was chosen as an SIF in this study. SIL verification has been performed for cases chosen through the layer of protection analysis method. The probability of failure on demands (PFDs) for SIFs in fault tree analysis was $4.82{\times}10^{-3}$. As a result, the SIFs were unsuitable for the needed RRF, although they were capable of satisfying their target SIL 2. So, different PST intervals from 1 to 4 years were applied to the SIFs. It was found that the PFD of SIFs was $2.13{\times}10^{-3}$ and the RRF was 469 at the PST interval of one year, and this satisfies the RRF requirements in this case. It was also found that shorter interval of PST caused higher reliability of the SIF.

화학반응기의 안전성 향상을 위한 예방조치 개선에 관한 연구 (A Study on the Improvement of Preventive Measures for Improving the Safety of Chemical Reactor)

  • 변윤섭
    • 한국가스학회지
    • /
    • 제24권4호
    • /
    • pp.32-38
    • /
    • 2020
  • 화학반응기에 발생한 화재·폭발 사고사례를 기반으로 화학반응기에 설치되어 있는 예방조치의 문제점을 분석하였다. 화학반응기는 다품종의 화학제품을 생산하며, 반응폭주시 급격히 상승하는 압력을 해소하기 위해 파열판을 설치하고 파열판의 기능을 유지하기 위해 배출물질을 대기로 배출하도록 허용하고 있어 화재·폭발사고가 발생하였다. 이를 개선하기 위한 방안으로 안전건전성수준(SIL3)을 기반으로 한 안전계장시스템(SIS)을 화학반응기의 예방조치로 적용하였다. 화학반응기의 원재료를 적하하는 배관에 긴급차단밸브를 직렬로 2개 설치하여 반응폭주시 긴급차단밸브 2개 중 1개만 작동하여도 원재료 공급을 차단할 수 있도록 하고, 반응응제제 공급배관에는 자동 ON/OFF 밸브를 병렬로 설치하여 반응폭주시 1개의 밸브만 열려도 반응억제제가 투입될 수 있게 하였다.