An Investigation of Environmental Management Costs in the Construction Sites (건축공사 현장의 환경관리비 실태 조사)

  • Kim Sung-Jin;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.588-591
    • /
    • 2004
  • Recently as people's values are changing from development into quality of life, the needs of environmentally friendly construction are gradually increasing, also popular discontent about the construction pollution such as the noise and vibration cause by construction machinery is increasing. Even though it is impossible to eliminate construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. The first step solving these matters is that the necessary sum of expense must be secured as the environmental budgeting method regarding Environmental management costs. To provide an efficient budgeting method, a interview with the person in charge of environment management was conducted. and the environmental management costs were analyzed through the historical data.

  • PDF

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

A Method of Assigning Weight Values for Qualitative Attributes in CBR Cost Model (사례기반추론 코스트 모델의 정성변수 속성가중치 산정방법)

  • Lee, Hyun-Soo;Kim, Soo-Young;Park, Moon-Seo;Ji, Sae-Hyun;Seong, Ki-Hoon;Pyeon, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2011
  • For construction projects, the importance of early cost estimates is highly recognized by the project team and sponsoring organization because early cost estimates are frequently a foundation of business decisions as well as a basis for identifying any changes as the project progresses from design to construction. However, it is difficult to accurately estimate construction cost in the early stage of a project due to various uncertainties in construction. To deal with these uncertainties, cost estimates should be made several times over the course of the project. In particular, early cost estimates are essential process for successful project management. For accurate construction cost estimates, it is necessary to compare cost estimates with actual costs based on historical project data. In this context, case-based reasoning (CBR), which is the process of solving new problems based on the solutions of similar past problems, can be considered as an effective method for cost estimating. To obtain this, it is also required to define the attribute similarities and the attribute weights. However, no existing method is capable of determining attribute weights of qualitative variables. Consequently, it has been a well-known barrier of accurate early cost estimates. Using Genetic Algorithms (GA), this research suggests the method of determining the attribute weight of qualitative variables. Based on building project case studies, the proposed methodology was validated.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

Increasing Hosting Capacity in KEPCO Distribution Feeders (배전선로의 분산 전원 상시 연계용량 기준 상향 타당성 연구)

  • Cho, Sung-Soo;Sim, JunBo;Lim, Hyeon-Ok;Kim, HyeonJin;Kim, Seong-Man;Ju, Sang-Do;Song, JongHyup
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.4
    • /
    • pp.311-321
    • /
    • 2019
  • With Korean Government's Renewable energy 3020 plan and 8th Basic plan for long-term power supply, renewable energy industries in Korea are active and catching attention from many relevant industry's relations. Especially with Interconnection guarantee policy established in Oct, 2016, DERs interconnection delay due to lack of allowable distribution hosting capacity is happening and reduction of reinforcement cost for distribution system where 70 % of DERs in South Korea are installed became one of important issues of KEPCO. Therefore, KEPCO needed to extract reasonable solutions to increase feasible hosting capacity of distribution feeders in order to reduce reinforcement cost under the condition of no matter in distribution system operation. This paper proposes feasible hosting capacity of distribution feeders that can be adopted and the status of DER installation in distribution system, PV output data, minimum load in distribution feeders as well as capacity of distribution lines have been investigated and analyzed in proof of the proposal.

Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings (공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.415-422
    • /
    • 2014
  • There is growing difference between a planned value and an actual cost for increasing as an risk of construction cost. A construction cost index is an alternative to redeem a problem, but it is still very difficult to reduce an actual differential as a price fluctuation. Furthermore an existing theory of a construction cost index is overly complex, and is unsuitable for using in working-level. This study suggests an optimum correction rate in respect of a total construction cost. It is analyzing the actual cost of 53 public buildings that the Public Procurement Service ordered. The objects are main processes that include architectural works, mechanical works, electrical works, telecommunication works, and service facilities. It is compared a total construction cost based on absolute error rate using the median from frequentist principle. For this, it is selected the suitable regression model and set a correction rate.

Analysis of hydraulic Characteristics of Close-to-nature Creek Improvement (자연형 소하천정비사업 수리특성분석)

  • Yeon, Gyu-Bang;Kim, Yang-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.444-448
    • /
    • 2005
  • 자연형 이동소하천 시범사업은 축제공, 배수공, 구조물공, 조경공 등의 공종과 자연석 쌓기, 식생축조블록, 그린리버(환경)블록, 스톤넷, 친환경 돌망태, 식생매트, 환경블록 H형, 반딧불 블록, 지오그린셀, 자연석 3단쌓기 호안 등 9개의 다양한 호안공법이 적용되어 2003년 5월부터 공사를 시작하여 2003년 12월에 준공하였다. 본 자연형 이동소하천 정비시범사업에서는 공사 전$\cdot$$\cdot$후에 "수질, 유량, 홍수량 측정 및 수리분석 그리고 생태계, 하천수리"에 대한 모니터링 사업을 현재까지 계속적으로 수행하고 있다. 본 연구는 자연형 소하천정비 시범사업 중에서 유역 내 2004년의 홍수로 인하여 발생한 세굴$\cdot$퇴적 등의 하상변동과 하천형태의 변화특성을 분석한 것이다. 또한 2003년도에 시공되어 설치 완료된 9개의 호안 공법의 적응도를 분석하였다. 소하천 특성을 고려한 올바른 하천정비가 이루어지기 위해서는 적용하고자 하는 공법들에 대한 치수 안전성 및 신뢰성이 확보되어야 한다. 다양한 자연형 소하천 정비실적 및 적용사례가 부족한 국내의 실정을 고려할 때 국내 소하천 특성에 적합한 치수 안전성을 갖추면서 소하천의 환경기능을 향상시킬 수 있는 소하천 정비공법의 개발을 위한 지속적이고 일관성 있는 수리$\cdot$수문자료의 축적을 위한 연구와 모니터링이 이루어져야할 것이다.

  • PDF

Case Study on Development of Residential Building Cost Index Compilation Model (주택원가지수 산정모델 작성 사례연구)

  • Cho Hun-Hee;Lee Yoo-Seob;Kang Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.220-226
    • /
    • 2003
  • The Residential Building Cost Index which presents price variation of construction resources required in a residential building project in single value, has been compiled to evaluate appropriate level of the price variation. This research reviewed the compilation methodology for Residential Building Cost Index based on comparative analysis on domestic statistics and proposed the Residential Building Cost Index through a variety of case studies. It would facilitate monitoring the price variation of a residential building cost and contributes to enhancing the applicability of construction cost data.

2006년도 추계 학술강연회

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.12 s.197
    • /
    • pp.41-48
    • /
    • 2006
  • 대한설비건설협회 대전∙충남도회(회장 성열구)와 대한설비공학회 대전∙충청지회, 한국설비기술협회 대전∙충청지회 등 설비관련 3개 단체가 공동으로 지난 10월 24일 한국에너지기술연구원 국제회의실에서 ‘2006년도 추계 학술강연회’를 개최했다. 이날 강연회에서 특히 대한설비건설협회 김경회 상임이사가 발표한「설비건설 관련법령 개선방안」을 통해 건산법 개정 현황과 대한설비건설협회의 노력 등을 자세하게 설명함으로써 참석자들의 박수갈채를 받았다. 또한 대한설비건설협회 황영환 부장은「적산제도 현황 및 정책방향」을 통해 실적공사비제도의 추진배경과 운영방향, 공공 건설공사 예정가격제도, 예정가격 결정기준 등을 자세하게 설명하여 참석자들의 이해를 도왔다. 본지는 이날 발표된 내용 중「설비건설 관련법령 개선방안」과「적산제도 현황 및 정책방향」을 게재한다.

  • PDF

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.