A Development of the Virtual Mockup System(ViMS) for a System Design Review of Aircraft (항공기 체계 설계 검토용 가상목업시스템 개발)

  • Kim, Cheon-Young;Park, Young-Keun;Kim, Sung-Rae;Kim, Mun-Yeol;Reu, Tae-Kyu
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.4
    • /
    • pp.97-104
    • /
    • 2007
  • In this paper, we have proposed an integrated aircraft development environment which can support virtual design and development for Systems Engineering and IPPD(Integrated Product and Process Development). We have also proposed the ViMS(Virtual Mockup System) which can perform a system design review on an integrated aircraft development environment. The ViMS is an integrated virtual design support system with immersive design review functionality to make a virtual mockup instead of a physical mockup through the virtual reality technology. The functionality of the ViMS consists design data management, design technology, design verification, and design assessment. We have described the detailed development artifact, case studies and conclusions of using the ViMS functionality.

Evaluation of Vibration and Structural Performance of an Innovative Sliding Step Steel Stair Using Full-Scale Mock-up Test (실물대 목업실험에 의한 슬라이딩스텝 철골계단의 진동 및 구조성능 평가)

  • Kim, Sung Yong;Lee, Cheol Ho;Kim, Na Eun;Cho, Sung Sang;Chung, Woon Ok
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.6
    • /
    • pp.511-522
    • /
    • 2014
  • In this study, an innovative steel stair system is presented which enables rapid erection and high quality control in both residential and office building construction. This system features two lightweight steel stringers of box shape, bolted connections easy to absorb construction tolerance, and stair steps movable transversely (or sliding steps) such that the work space needed for concrete stairway wall could be easily provided. In this type of stairway system, other than providing robust connecting details, ensuring vibration performance is especially important since this system may be vibration-sensitive due to lightweight nature and/or probable low damping. To tackle these issues, a series of full-scale mock-up tests were conducted by using box-shape stringer members with or without concrete-fill. The connection system was shown to be sufficiently stiff and strong, or it remained elastic even under the 160% of service load level. Among the seven stringer alternatives, five exhibited satisfactory vibration performance according to the related North American and European acceptance criteria.

A performance test of an halon fire extinguishing system for a helicopter engine (헬기 엔진실 할론 소화시스템 성능평가)

  • Choi, Byung-Il;Han, Yong-Shik;Do, Kyu-Hyung;Kim, Myung-Bae;Bae, Hak-Sung;Seo, Seok-Joo
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.180-187
    • /
    • 2009
  • 한국형 헬기 개발사업 (KHP)에서 개발 중인 한국형 기동 헬기(KUH)의 엔진실에 적용되는 소화시스템의 성능평가를 수행하였다. 사용된 소화약제는 할론 1301 이며, 국방규격에 맞게 설계 되었다. 실물모형의 엔진 목업을 제작하여 소화시스템을 배치하고, 화재 소화실험과 할론 농도 측정 실험을 수행하였다. 실험 결과 설계된 소화시스템은 엔진실 내부의 화재를 효과적으로 소화시켰으며, 국방 규격에서 요구하는 분사 시간 조건 및 농도조건을 만족함을 확인 하였다.

  • PDF

Fabrication and Constructability of a General-Purpose Manufactured Precast Concrete Double Wall (범용 생산설비를 활용한 PC 더블월 제작 및 시공성에 관한 연구)

  • Park, Soon-Jeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.465-476
    • /
    • 2023
  • This study introduces the development of a precast concrete double-wall, applicable to basement construction in apartment buildings. Unlike traditional precast concrete double walls, the developed double-wall doesn't require specialized manufacturing equipment such as a lathe. The constructability of these advanced technologies was validated through a full-scale mock-up test using the precast concrete double wall. The test specimens were constructed to represent a structural wall with a thickness of 250mm. It was observed that the quality of the in-situ concrete, filled between two single panels of 110mm thickness each, was excellent. The construction efficiency of the developed double-wall system for basement construction in an apartment building was also examined. Expert interviews about installation times of precast concrete elements were conducted to evaluate the speed of the basement floor's installation. The results showed that installation of precast concrete elements, including the proposed double walls, could be completed within 20 to 29 days for a basement in an apartment building. This indicates a three-fold increase in construction efficiency compared to traditional methods relying on in-situ casting.

Study on Work-Efficiency in feild of PFB(POSCO E&C Fire Board) for High Sterength Concrete Spalling Control (고강도 콘크리트 폭렬제어를 위한 PFB(POSCO E&C Fire Board) 공법의 현장 시공성에 관한 연구)

  • Kim, Woo-Jae;Park, Dong-Cheol;Yang, Wan-Hee;Lee, Sea-Hyun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.961-964
    • /
    • 2008
  • There are researches in progress on ensuring the safety of the high impact concrete in case of fire which is a current rising social problem and this research institute also developed PFB technology, the explosion preventing technology. PFB technology is to apply POSCO E&C Fire Board, a fireproof board, with an adhesive agent on the construction site, and this technology passed 3-hour fireproof test and this technology was proven from a previous research that the temperature of main root is maintained under $200^{\circ}C$. Therefore, tests on basic contents was performed in this research before the actual construction, with a full scale of wooden prototype to apply PFB technology to actual construction sites and the tests were done on the workability of fireproof board, the adhesive power, the resistance against imprint of wooden nail, the heat conductivity and etc. As the results of these tests, PFB technology was proven to have an excellent workability at a construction site and to be easy for processing and also, this technology was proven to have a great resisting power against imprint of wooden nail. Therefore, this research has confirmed that PFB technology has no problem to be applied on a construction site.