A Study on Measurement Accuracy of Theodolite System(III) - A Measurement System Accuracy depending on a Distance of Scale Bar on the Distance 3 m between two Theodolites (데오드라이트 시스템의 측정 정확도에 대한 연구(III) - 시준거리 3 m에서 기준자 거리에 따른 측정 정도)

  • Yoon Yong Sik;Lee Dong Ju;Yoon In Jin
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.14 no.2
    • /
    • pp.48-54
    • /
    • 2005
  • The theodolite system consists of two theodolites, a scale bar and a target bu. A measurement accuracy of theodolite system is affected by a measurement distance of each equipment. This study was performed fir measuring an accuracy when the distance from theodolite to scale bar was changed 2~ 6 m on two theodolites distance 3 a The results showed thai the measurement accuracy could be $\pm$0.021 mm when the distance from theodolite to target was 2,3 and 6 n Specially, it was found that the maximum measurement accuracy was 10.017mm on theodolite collimation distance 3m and the distance 4 m of the theodolite and scale bar.

A Study on Measurement Error Factors of Theodolite System (데오도라이트 시스템의 측정 오차 요인에 대한 연구)

  • 윤용식;이동주
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.12 no.4
    • /
    • pp.36-42
    • /
    • 2003
  • Theodolite measurement system is non-contacted 3-dimensional measurement system. The system accuracy is ${\pm}0.5mm$or better for distance 0~100m. And the system is used for the measurement of a product of middle and large scale. This study is performed for the measurement error factors of the system. We could know that the main measurement error factors are temperature, illumination and skill. Also, we performed the study for the effect according to the height difference of scale bar.

Availability Evaluation of Quasi Static RTK Positioning for Construction of High Rise Buildings and Civil Structures (고가(高架)구조물의 정위치 시공을 위한 준스태틱RTK 측위의 적용성 실험)

  • Kim, In-Seop
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.19 no.4
    • /
    • pp.119-126
    • /
    • 2011
  • During precise survey on the top of High rise buildings and civil structures, optical surveying equipments like a Total Station are not recommended to use because of some reasons that uneasier alignment with reflectors located at the top of building, increasing error depends on increasement of observation distance and unavailable dynamic positioning etc. Recently various GPS positioning methods have been applied to this job however almost of them are post-processing method which is required much longer time during for whole process includes stake-out, cross checking, fixing positions and final inspections. Therefore, in this study, we applied with RTK surveying system which allows stake-out and inspection in realtime to avoid delaying of construction schedule and also applied with Quasi Static RTK measurement and network adjustment to get a high accuracy within a few millimeters in structure positioning to achieve a successful management for process and quality control of the project. As a result, very high accurate surveying for structures within approx. 2mm in realtime has been achieved when surveyor conduct a network adjustment using least square method for 4 base lines created by Quasi Static RTK data and we expect this method will be applied to construction survey for high rise buildings and civil structures in the future.