Abstract
During precise survey on the top of High rise buildings and civil structures, optical surveying equipments like a Total Station are not recommended to use because of some reasons that uneasier alignment with reflectors located at the top of building, increasing error depends on increasement of observation distance and unavailable dynamic positioning etc. Recently various GPS positioning methods have been applied to this job however almost of them are post-processing method which is required much longer time during for whole process includes stake-out, cross checking, fixing positions and final inspections. Therefore, in this study, we applied with RTK surveying system which allows stake-out and inspection in realtime to avoid delaying of construction schedule and also applied with Quasi Static RTK measurement and network adjustment to get a high accuracy within a few millimeters in structure positioning to achieve a successful management for process and quality control of the project. As a result, very high accurate surveying for structures within approx. 2mm in realtime has been achieved when surveyor conduct a network adjustment using least square method for 4 base lines created by Quasi Static RTK data and we expect this method will be applied to construction survey for high rise buildings and civil structures in the future.
초고층 건물이나 고가 구조물 상부의 정위치 측설에 주로 사용되어 왔던 광학식 TS장비는 시준선 확보의 어려움, 장거리 관측에 따른 오차의 증가 및 동적관측의 어려움 등으로 인하여 사용성이 많이 떨어지므로 최근에는 GPS를 이용한 측량방법이 제시되고 있다. 그러나 기존의 GPS측량방법들은 대부분 후처리 방법으로서 측설, 검측, 위치조정 및 확인측량 등 일련의 과정에서 시간이 과다 소요되는 문제점이 있다. 따라서 본 논문에서는 RTK측위 기법을 적용하여 실시간으로 구조물의 위치를 검측하고 조정함으로써 측량으로 인한 공사의 중단을 최소화 하고, 준스태틱 RTK기법에 의한 고정밀의 측정값을 기반으로 망조정을 통해 수 mm 이내의 높은 정확도로 시공좌표를 결정함으로써 공정관리와 품질관리를 모두 충족시킬 수 있는 방법에 대해 실험 하였다. 실험결과 130m 이상 높이의 고가 구조물 상층부에서 사변망을 이루는 4점의 준스태틱 RTK 관측점을 최소제곱법으로 망조정 하면 약 2mm 내외의 정확도로 구조물 측설이 가능하므로 향후 초고층 건물이나 고가 교량등의 시공측량에 널리 적용될 수 있을 것으로 사료된다.