• Title/Summary/Keyword: 시공 일정 관리

Search Result 104, Processing Time 0.023 seconds

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.

An Automated and Intelligent Process for Construction Supply Chain Management Utilizing Ubiquitous Technologies (USN 기술을 활용한 지능형 건설물류관리 프로세스)

  • Lee, Woo-Jae;Lee, Nam-Su;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.756-761
    • /
    • 2007
  • The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.

  • PDF

Real-time monitoring system for management of chemically management of chemically contaminated water pipeline (유해화학물질 이송관로 파손누수 실시간 감시 기술)

  • Kim, Joon-Seok;Yoon, Byoung-Jo;Seo, Jae-Soon
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2015.11a
    • /
    • pp.195-196
    • /
    • 2015
  • 유해화학물질 이송관로의 실시간 유지관리를 위하여 파손사전 예방감시를 위한 이중구조 파이프 제작, GIS관망 구축을 위한 측량 및 시공 속성정보 수집을 위한 스마트 폰 앱 프로그램 개발, 실시간 감시를 위한 서버프로그램 개발을 수행하였다. 또한, 파일럿규모의 야외시험시설을 구축하여 시스템 동작여부를 확인하였다. 파손 예방은 파이프에 부착된 센서 케이블을 통하여 감지하도록 하였고, 누수는 압력센서를 일정한 간격으로 설치하여 시험하였다. VRS 측량장비와 스마트폰을 연계할 수 있는 앱 프로그램으로 실시간 자료 수집을 수행할 수 있도록 하였고, 감시 서버프로그램을 통하여 실시간 감시 및 알람이 가능하도록 하였다.

  • PDF

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Estimating of Optimal Allowed Distance for Reducing Vibration and Noise Problems by Pile Driving after Drilling Method in Deep Foundation Work (천공 후 말뚝타격공법의 진동 $\cdot$ 소음 문제 해소를 위한 적정 이격거리 산정 방안 연구)

  • Park Hong-Tae;Kang Lee-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.152-163
    • /
    • 2005
  • Pile driving work causes a vibration problem in the construction site using pile foundation and often causes civil affairs by construction noise around the construction site. For the vibration and noise problems, the driving after drilling method rather than the direct driving method is being generalized for reducing vibration and noise. However, this method also causes civil affairs when the driving work is operated in adjacent area. This study suggests a criterion for evaluating an optimal allowed distance for pile driving work by the driving after drilling method. Actual surveys of vibration and noise for pile driving work in seven construction sites were used for developing regression analysis equations. The results can be a standard to estimate the allowed distance to avoid vibration and noise problems in pile driving work for deep foundation.

Investigation on Level of Emergency Treatment Performance on Building Construction Sites in Jeju (제주지역 건설현장의 응급처치 대응수준에 대한 조사연구)

  • Kang, Soon-Min;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.211-219
    • /
    • 2012
  • On January 27, 2005, the central government of the Republic of Korea designated Jeju Island as an Island of World Peace based on Article 12 of the Special Act for the Jeju Free International City, and the WHO designated Safe Community Jeju in July, 2007. Whenever an industrial accident occurs on Jeju Island, reports in the media raise the question of whether Jeju is a safe city or not. But due to the characteristics of construction sites in Jeju, it is very difficult to employ workers of a certain level. For the safety of workers, it is also thought that owners should make a decisive investment to introduce an education and reward system in order to improve the consciousness level of workers. This research focuses on first-aid on construction sites. It then surveys the level of construction safety management, and suggests improvements in construction safety control and first-aid.

A Parametric Study on Effects of Column Shortening Analytical Correction Using Measured Results in RC Tall Buildings (RC 고층 건물에서 계측 결과를 이용한 기둥축소 해석보정의 효과에 대한 변수 연구)

  • Song, Eun-Seok;Kim, Jae-Yo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.4
    • /
    • pp.38-47
    • /
    • 2020
  • A parametric study for analytical correction using measurement results was performed to minimize errors in the predictions of column shortening in RC tall building. The parameters of the column shortening analytical correction are the execution standard of analytical correction, the value of the analytical correction, and the measurement location, and the analytical correction models with the parameters were applied to the construction sequence analysis of a 41-story RC building to compare and analyze the correction effect according to the parameter. The reduction ratio of the error value for each floor was compared with the number of corrections and the total corrected value, and it was confirmed that the error tended to be minimized when the execution standard of analytical correction was performed based on a regular interval, when the analysis correction value was corrected by the error value, and when the measurement position was measured every floor. From this, it was confirmed that the most appropriate analytical correction model can be derived by applying multiple analytical correction models to the actual analysis model.

Project management service for Kazakhstan Express Residence (카자흐스탄 익스프레스 레지던스 PM 프로젝트 사례 발표)

  • Jung, Jae-Ho;Park, Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.19-24
    • /
    • 2007
  • Due to the decreasing of Korean Construction market situation, recently a lot of medium & small size contractors, engineering firms and consulting firms are extending their business area to overseas market. To compare with 80${\sim}$90's situation at that time only Contractor provide service to overseas but in recent, there are number of Design, CM/PM and other consulting services which provide service to overseas. With this figures, the number of nation also increased from middle east and South east asian area to central asia and african nations and among them Kazakhstan has became as new market for the construction industry based on it oil money and up stream of real estimate market. Based on this fact, we will explain one of our recent project case for PM service in Almaty, Kazakhstan to show others who have interest to do business in their.

  • PDF

Effect of Freezing and Thawing on Adhesion of Cement Concrete with Coarse-sand Coated FRP (규사코팅 FRP와 콘크리트 부착특성에 동결융해가 미치는 영향)

  • Lee, Gyu Phil;Park, Kwang Phil;Hwang, Jae Hong;Kim, Dong Gyou
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.2
    • /
    • pp.117-123
    • /
    • 2013
  • As fiber reinforced polymer (FRP) material is appled for a curved structure such as tunnel, FRP material must has a curved shape. Until now, the curved FRP material has been producted by hand-lay-up or filament winding work. It is impossible for mass production of the curved FRP material by these methods. Also, the quality of product by these methods is lower than that by pultrusion method. New pultrusion method and equipment had been developed for production of FRP material with steady curvature. The objective of this study is to evaluate the effect of freezing and thawing on adhesion of cement concrete with coarse-sand coated FRP in repair and reinforcement of cement-concrete structure using curved FRP material.