• Title/Summary/Keyword: 시공 시뮬레이션

Search Result 265, Processing Time 0.029 seconds

Performance Measurement Method and Case Study for BIM based Construction Simulation System (BIM기반의 건축시공시뮬레이션 시스템 성능분석 방법 및 사례연구)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.15-23
    • /
    • 2013
  • Because that construction project is usually uncertain and the plan of it changes frequently, it is difficult to make a reliable and feasible plan for it. As the BIM technology is developed, we can simulate the future of the construction project visually and make more reliable plan. However, data production efficiency is not so high, it is used just for animation and presentation usage. Although, a lot of construction simulation systems are developed, it is difficult to measure performance of them. In this study, we defined the construction simulation work process and the scenarios to measure performance of them. The performance measurement method using simulation process scenario can make possible benchmark test of them.

Simulation Function of Railway Station Project by Virtual Construction Technology (가상건설기법에 의한 철도역사 시설물 시공시뮬레이션 기능 구축)

  • Kang, Leen-Seok;Moon, Jin-Seok;Kwon, Jung-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.433-440
    • /
    • 2008
  • Virtual construction methodology enables to construct project facility from design phase to construction phase in 3D virtual environment. It is a technique that can solve problems of construction in virtual construction process. This study suggests some methodologies of virtual construction and developed a system for a railway station in Honam express railway project based on suggested methodologies. This study developed layout review and layer simulation functions. Those functions can improve the effectiveness of 3D simulation and the virtual construction system can be used as a verification tool for construction process of various construction projects.

The Simulation Function Analysis for BIM based construction planning (BIM기반 시공계획의 시뮬레이션 기능 분석 연구)

  • Jun, Ki-Hyun;Kim, Chang-Seob;Yun, Seok-Heon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.95-98
    • /
    • 2011
  • 건설공사 프로젝트는 사전 기획 단계, 설계, 계약, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주체에 의해 프로젝트가 진행되고 각 분야 간의 원활한 의사소통을 통한 협력 작업으로 일을 진행한다. 그러나 각 단계별 참여주체간의 협업이 어렵고 정보교류가 원활하지 못한 문제점들이 있다. 또한 건설공정은 현장여건의 변화와 불확실성으로 인해 예측이 어렵고, 보다 신뢰성이 있는 계획의 부재로 인하여 각종 세부 공정들 간의 간섭을 유발하고 계획된 일정을 준수하기 어려워 불필요한 비용의 낭비와 공사기간의 증가를 야기한다. 이러한 낭비요인을 최소화하고 건축 프로젝트를 진행하는데 있어서 효율성을 높이기 위해서는 시공계획 단계의 신뢰성을 높여야 한다. 따라서 시공전의 계획 단계에서부터 4D 시뮬레이션을 통하여 이러한 문제점들을 파악하고 개선하는 것이 중요하다. 본 연구에서는 BIM기반의 시뮬레이션 프로그램의 기능분석을 통하여 효율적인 적용과 발전과정을 알아보고자 한다.

  • PDF

A study on construction simulation of road tunnel using Decision Aids for Tunneling (DAT) (터널의사결정체계 (DAT)를 이용한 도로터널의 시공 시뮬레이션 연구)

  • Min, Sangyoon;Kim, Taek Kon;Einstein, H.H.;Lee, Jun S.;Kim, Ho Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.161-174
    • /
    • 2003
  • Applicability of the Decision Aids for Tunneling (DAT) technique is investigated in this study to better understand the efficiency of the decision making process during tunnel construction. For this, a traffic tunnel under construction is adopted and information on the construction procedure, i.e., overall geology, unit cost and construction time for each excavation process, is provided periodically. Various scattergrams in which cost-time simulation results are plotted are obtained according to the simulation methods and final prediction on the construction time/cost is made. It is found that the uncertainty in the cost distribution is greater than the uncertainty in the time distribution for each cycle simulation and the uncertainties in time and cost for the one time simulations are comparable. Future work will be concentrated on the updating scheme using the face mapping data and various parametric studies will also be performed.

  • PDF

Expression method of simulation which is execution of media facade (미디어파사드 시뮬레이션 표현방법)

  • Lee, Chang-Jo;Ha, Dong-One;Han, Tae-Woo
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.14 no.5
    • /
    • pp.91-101
    • /
    • 2009
  • This study's purpose is to revive pre-construction situation earlier than construction of media facade using light-emitting diode, and analyze the strong and weak points of simulation image making process and technology, including lots of expressing methods. Exterior building decoration that was originated from Super Graphic led to the LED construction with a trend of increased night activities of these days. Initial Super Graphic was just in the level of deciding what to do with simple CAD drawings, but today's media facade construction is not so simple as the previous ones. This is because of the problems that should think about balances between neighboring environment and buildings, including high construction costs. According to survey results, media facade construction simulation's various expressing methods, its processes of analysis, and its strong & weak points will suggest standards for its size of construction and simulation purpose, including recommending suggestions that can respond rapidly by clients' diverse demands.

Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader (시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임)

  • Han, Ye-Ryeong;Park, Hee-Sung;Chang, Chul-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.105-111
    • /
    • 2009
  • Construction equipment is a very important factor for successful construction. Also, the cost for construction equipment is a major part of the cost of construction. Therefore, the estimation of the equipment cost is a critical task in construction planning. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability and cost. Although the performance of the equipment has improved over time, the variables in the formula have not been updated in a timely manner. Therefore, this paper has analyzed the preceding research, and performed several site visits to measure the cycle time of a backhoe and a loader. Construction equipment production rates were calculated with collected cycle times and variables given in 'Standard Unit Labor'. In addition,production rates were estimated considering the circumstances of various sites with the simulation program 'crystal ball.'

Visualizing Construction Process Linking Process Simulation (프로세스 시뮬레이션을 연계한 건설공정 시각화)

  • Kim, Yeong-Hwan;Jung, Pyung-Ki;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.73-79
    • /
    • 2006
  • Even though graphical simulation is very useful for construction planning, the application of graphical simulation has a limitation in dealing with objects without fixed form like earthmoving process. In this case, the mathematical/statistical simulation about the productivity of the whole processes based on the numerical data of working time, waiting time and working capacity of using equipment becomes effective. The mathematical/statistical simulation is not fully utilized in the field of construction due to the difficulties of creating process models and securing trust the numerically expressed results of simulation. In this research, the output of discrete-event simulation programs which are the most common mathematical/statistical simulation tool for construction processes were analyzed for the purpose of earthmoving process visualization. The purpose of this research is to develop a graphical simulation system that can help the construction planner select most suitable equipment and construction methods through the visualize the numerical simulation results of the working time, the queuing time as well as the amount resources etc.

Works - Zero Energy House _ Shibaura Institute of technology (작품 - 제로에너지하우스(ZEH) _ 시바우라공과대학)

  • Kim, Myoungkeun
    • Korean Architects
    • /
    • s.569
    • /
    • pp.102-121
    • /
    • 2016
  • 일본의 시바우라공과대학에서 에네마네하우스 공모전에 참여해 제안했던 제로에너지하우스(ZEH)로 요코하마에서 시공한 후 해체하여 후쿠시마에 재설치해 활용한 프로젝트이다. 시바우라공과대학은 설계단계에서부터 BIM을 활용해 에너지 분석 및 시공을 위한 각종 시뮬레이션을 수행하였으며 특히 시공 후 전시기간이 끝난 후 재설치를 위한 조립시스템 검토에 유용하게 활용하였다. 이를 통해 에너지 효율과 지속가능성을 BIM을 통해 향상시킨 모범적인 사례이다.

  • PDF

Construction Process Analysis of Han-Ok for BIM Based Modern Han-Ok Construction Simulation (BIM 기반의 현대식 한옥 시공시뮬레이션 구현을 위한 한옥 공정분석 연구)

  • Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.3-10
    • /
    • 2011
  • Currently, technologies for industrialization and dissemination for Han-Ok are developed actively. Also BIM technologies are actively developed. However, it is difficult to find the research and study cases for construction method and process for Han-Ok. BIM is the technology for managing information with element as a unit for building design, construction and management, and it is closely related to Han-Ok using assembling method for building construction. We analyzed the basic construction processes for IK-Gong and MinDoRi house, typical types of Han-Ok. Also we developed the Work Breakdown Structure of construction process for Han-Ok and suggested the method for construction simulation using BIM. Simple BIM model of Han-Ok which is Ik-Gong type is used for case study. It was possible to link automatically between 3D elements objects and construction activities about 95% in the case study. More studies of construction method for various type of Han-Ok and rules for link between elements and construction activities are required for Industrialization and dissemination of Han-Ok.

Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment (공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kim, Min Ju;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.68-69
    • /
    • 2015
  • Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.