• Title/Summary/Keyword: 시공실태

Search Result 172, Processing Time 0.016 seconds

A Study on the Ordering Status of Traditional Landscape Design Service in Cultural Heritage (문화재의 전통조경설계용역 발주실태 연구)

  • Kim, Min-Seon;Kim, Choong-Sik;Lee, Jae-Yong
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.39 no.3
    • /
    • pp.33-41
    • /
    • 2021
  • This study identified the scale that traditional landscape design has taken up by analyzing a total of 1037 services for design of cultural heritage that had been ordered by the government agencies from 2018 to 2020, and has drawn characteristics of traditional landscape design focusing on major cases. The results are as follows. First, the number of order cases for traditional landscape design has shown differences annually in the services of design of cultural heritage, but the design amount has been found to have the similar average annually, which confirmed that the same level has been maintained each year. It was found that the number of cases of traditional landscape design requiring responsibilities or participations of landscape engineers for 3 years in the entire design had a high proportion of approximately 26%. Second, the traditional landscape design has required professional knowledge and experiences of landscape engineers that could not be replaced by the business operator for design of cultural heritage consisting of architects. The expertise has been shown differently depending on types of construction. First, the topographical design for the work to build a foundation has required understanding of ground shapes and its elevations and professional knowledge on calculation of the amount of the earth work and the remains maintenance technique etc. The plantation design has required basic knowledge on growth characteristics of trees and the environment for growth and understanding of the vegetation landscape of the past. Meanwhile, the design for traditional pavement and traditional landscape structures and facilities has required the expertise on traditional materials that are different from the modern ones and their processing and construction methods. The understanding of changes to water paths and ecosystem, the principles of fluids, and characteristics of each type of fluid was essential for the design for the ecological landscape work including the maintenance of a water system such as rivers etc. As such, the traditional landscape design has a scale accounting for approximately one fourth of the entire cultural heritage design and requires the expertise differentiated from other fields. This improves the provisions of the current law on limiting the actual design, suggesting the need for the establishment of a traditional landscape design company so that all traditional landscape designs can be carried out by landscape engineers.

Optimum Management Plan for Soil Contamination Facilities (특정토양오염관리대상시설의 최적 관리방안에 관한 연구)

  • Park, Jae-Soo;Kim, Ki-Ho;Kim, Hae-Keum;Choi, Sang-Il
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.2
    • /
    • pp.293-300
    • /
    • 2012
  • This study was to investigate the unsuitable rate of the storage facilities, the changes in corrosion process over time after installation according to the status, the time to install the facilities, years elapsed after facilities installation, inspection of methods and motivation, and so on, based on the results of the inspection at the petroleum storage facilities conducted by domestic soil-relate specialized agency to derive optimal management plans which meet the status of soil contamination facilities. The results showed that the facilities more than 5 years after the initial leak test at the time of the installation need to be inspected periodically by considering costs of leak test and remediation of polluted soil. The inspection period can be decided by cost and leak test methods showing discrepancies for the results obtained from individual test whether it was direct or indirect. To compensate these matters, we suggested that the direct inspection method on regular schedule is recommended. On the other hand, the inspection can be voluntarily completed to ease burden of the results by inspection or equivalent level to this inspection method. Also, it may need improved construction supervision and performance test system to minimize the occurrence of the nature defects in installing the facilities as well as the upgrade program for the facilities during intervals of inspection period.