• Title/Summary/Keyword: 시공방법론

Search Result 161, Processing Time 0.032 seconds

A Study on Analysis and Assessment of the LCCO2 Emissions for Building Construction by Using the Life Cycle Assessment Methodology (전과정평가 방법론을 이용한 건물의 전과정 탄소 배출량 평가 및 분석에 관한 연구)

  • Cho, Su-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.259-260
    • /
    • 2016
  • Recently, world-wide focusing on the interest for the reduction of greenhouse gas emissions associated with climate change and global warming, South Korea also has set up a national greenhouse gas reduction target and action plans seeking to achieve them. In particular, in the construction area, to encourage green building certification of the building and carbon labeling acquisition of building products, in order to reduce the environmental impact caused by the industrial activities have been in steady efforts. Therefore, this study estimates the life cycle carbon footprint of building construction materials applied to carbon emissions reduction technology and analyzes the results. Through the CO2 emissions analysis in construction phase and maintenance phase of the building, it provides basic resource for future research expansion and establishes a step-by-step whole life cycle carbon emissions reduction plan in new construction and existing buildings.

  • PDF

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions

Implementing Activity-based LCA Model for Carbon Dioxide Emission Analysis and Allocation of Environment Cost (세부 공정별 CO2 배출 분석 및 환경비용 원가배분을 위한 Activity-based LCA 모델의 도입 - 커튼월 공사를 중심으로 -)

  • Lim, Ji-Youn;Yi, June-Seong;Shin, Seung-Woo;Son, Jeong-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.78-88
    • /
    • 2012
  • As worldwide efforts to reduce global warming gases, the construction Industry is endeavoring to diminish carbon dioxides emissions. Especially, by introducing the LCA methodology to the industry, A variety of related studies to measure the emission of carbon dioxides have been conducted. However, when the conventional LCA methodology is applied to the construction projects, some limitations have been reported. To overcome the restrictions derived from the industry characteristics, this research suggested the Activity-based LCA model by applying the Activity-based Costing (ABC), which breaks down the whole life cycles into more detailed stages. By implementing the newly developed model, forecasting accuracy of $CO_2$ emission was elevated, and the critical control points on carbon dioxides were established. Through the case study of aluminium curtain-wall system, this research verified the usefulness of the Activity-based LCA.

Designs of Pipe Fitting with Three Dimensional Measurement and Kinematic Constrained Equations (파이프 체결을 위한 3차원 측정 및 기구적 구속조건 기반의 설계 방식)

  • Yang, Jeong-Yean
    • The Journal of the Korea Contents Association
    • /
    • v.22 no.3
    • /
    • pp.54-61
    • /
    • 2022
  • Ship is a huge system including a variety of pipe arrangements. Pipes are installed according to the design layout, however the end poistion of pipes are not well matched owing to its measurement and construction errors. In this situation, the customized pipe fitting is frequently designed to connect with both pipes, the position of which are manually measured. This paper focused that these two coordinates are measured by point cloud from RGBD sensor and the relative transformation induced by positional and orientational differences is calculated by inverse kinematics in robotics theory. Therefore, the result applies for the methodology of the pipe connection design. The pipe coordinate that is estimated by the matching and the probabilistic RANSAC method will be verified by experiments. The kinematic design parameters are computationally calculated by using the minimum degree of freedom that connects both pipe coordinates.

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

Safety analysis for the tunnel adjacent to the pier (교각에 근접한 터널의 안정성 평가)

  • Lee, Sun-Bok;Yoon, Ji-Son
    • Journal of the Korean Geophysical Society
    • /
    • v.7 no.4
    • /
    • pp.313-324
    • /
    • 2004
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t) = a[1-exp(-bt)].

  • PDF

A study on the performance-based design methodology for tunnels through case study on the tunnel built by the prescribed design (사양중심의 터널 설계 사례 연구를 통한 성능기반 터널 설계 방안에 관한 고찰)

  • Hur, Jin-Suk;Kim, Seung-Ryull;Hwang, Je-Don;Seo, Young-Wook;Jung, Myung-Keun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.4
    • /
    • pp.415-429
    • /
    • 2013
  • Performance-based design is becoming a key word for structure design in architectural and civil engineering spheres. In this paper, the need of the performance-based design, especially for tunnels, was enhanced by case study on the largely deformed cut-and-cover arch tunnel built by the prescribed design. In addition, this paper introduces effective method of subdivision on tunnel performance to help field engineer's comprehension. Case study dealing with the issue of typical backwards problem in geotechnical engineering was examined. First of all, the outline of the damaged culvert as well as the surrounding embankment is in detail described. The background, together with the cause of damage, is discussed based on the results of site investigation. Secondly, it was attempted to elucidate the deformation mechanism of the embankment by means of numerical analysis, and the countermeasures are proposed. Finally, the stability of the embankment with the countermeasures was evaluated.

A Study on the Utilization of BIM Model using Vertex Data-based Division Method (정점데이터기반 분할기법을 활용한 BIM모델의 활용 방안 연구)

  • Jae-Yeong, Hwang;Jae-Hee, Lee;Leen-Seok, Kang
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.123-134
    • /
    • 2023
  • The BIM (Building Information Modeling) model created in the design stage can be used for prior review and schedule management for the construction stage. However, in the case of actual BIM application cases, additional work is required, such as creating a new model suitable for the construction stage, rather than using the 3D model in the design stage, due to the difference in the purpose of use between the design stage and the construction stage. Therefore, in this study, a division function of BIM model is proposed as a method of recycling it in the construction stage without a remodeling process. In addition, the application to the actual BIM model and the 4D CAD system linkage of the divided object and the comparison with the existing division method are used to verify the usability.