Since the reliability of results by the existing analyzing method is low, in the case of for excavation performed in urban area whose stability is of great importance, construction control based on field monitoring is always necessary. But the field monitoring reflects only the behavior of construction process that has already been carried out, and it has limitations in predicting the behavior of the expected construction process, which is practically more important for construction control. In this study, construction control system for excavation which can predict the behavior of the expected processes during construction with high degree of accuracy, is developed by adopting inverse analysis. The inverse analied applied field monitoring results to excavation analysis can improve the reliability of predicted results. The developed system uses an elasto-plastic soil spring model for the excavation analysis and the minimization of least squared errors between measured displacements and calculated displacements for the inverse analysis. All the required processes for construction control can be performed as an integrated work within the system reflecting real time application and user's convenience. Their applicabilitis are confirmed by two case studies.
This paper presents the results of a research performed to investigate the finite element modeling approach for GESC (Geogrid-Encased Stone Column) method in soft ground within the framework of stress-pore pressure coupled analysis. GESC reinforcement mechanism and construction method was first examined and model verification of stone column on the results of FE analysis was identified. The results indicate that the 3D FE analysis and membrane elements play the most important role in the soft groung using GESC. Based on the results, a modeling method was suggested for stress-pore pressure coupled finite element modelling of GESC in soft ground.
Yu Na Park;Inwook Heo;Jae Hyun Kim;Khaliunaa Darkhanbat;Sung-Bae Kim;Kang Su Kim
Journal of the Korea institute for structural maintenance and inspection
/
v.27
no.5
/
pp.130-138
/
2023
In this study, experimental and analytical studies were conducted on the structural performance of permanent steel formed wide beams in construction stage. Four specimens were fabricated with different rib spacings of the side steel formwork and fixing plate depths, and experimental tests were performed to investigate the effects of variables on the structural performance. Also, an finite element analysis model of the steel permanent formwork wide beam was proposed based on the test results. Using the proposed model, parametric studies were performed with variables including rib spacing of the bottom and side steel formwork, spacing, depth, and thickness of the fixing plate to derive optimized details. Furthermore, an artificial neural network model was developed to easily estimate the deformation of the steel permanent formwork wide beam with various details.
Journal of the Korea institute for structural maintenance and inspection
/
v.23
no.5
/
pp.96-103
/
2019
Middle-rise reinforced concrete residential buildings account for a large portion of the Korea, and structural performance analysis are needed for problems that could occur during the construction of such buildings. Thus, a middle-rise reinforced concrete residential building with 25 stories are selected as a sample model for structural performance analysis. The structural analyses are performed by dividing a sample model into the construction stage models of the 5th, 10th, 15th, 20th and 25th floors and the completion stage models with the design completed. For the comparisons of structural performances, Eigenvalue analysis results and lateral-load-resisting capabilities and structural design performances of structural members are analyzed. As a result of analyses, it was confirmed that both the construction and completion stage do not exceed KBC criteria limits at the lateral displacement and story drift ratio, and structural design performances of structural members confirm structural safety in all components except for some members of the wall. Therefore, it was concluded that if structural stability is obtained during the completion stage of a middle-rise reinforced concrete residential building, structural stability is secured under construction.
The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel
excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t) = a[1-exp(-bt)].
KSCE Journal of Civil and Environmental Engineering Research
/
v.14
no.1
/
pp.171-178
/
1994
The skin friction on single piles was investigated by using an analytical study and a numerical analysis. The emphasis was given to the variation of skin friction on piles based on the load transfer mechanism developed for the consolidation of a surrounding soft clay. Local yield or slip at the pile-soil interface was taken into account by specifying a limiting value of shear stress. The response of a single pile was analyzed and compared to the results of field case study. Based on the results obtained, it is shown that the skin friction on a pile increases as the degree of consolidation increases and the ultimate axial forces result from the long term behavior of clay corresponding to the end of the consolidation. It is also found that the analysis using one-dimensional consolidation theory as well as two or three-dimensional non-linear analysis gives relatively reasonable results.
과연 콘크리트 구조물에 있어서 누수 균열은 문제가 되는 것일까? 이에 대해 설계, 구조 시공, 재료(콘크리트), 방수, 품질 및 안전의 관련 전문가는 여러 가지 이견을 말하고 있다. 또한 콘크리트 구조물에 관계하는 발주자, 건축주, 사용자, 시공자의 입장도 상황에 따라 다르게 해석하고, 평가하고 있다. 예를 들면 일반적으로 발주자(건축주 등)는 시공자에게 누수 균열은 하자이므로 무조건 보수할 것을 요구하는 반면 사용자(언론 포함)가 문제를 제기할 때(공공공사의 경우) 발주자는 이에 대해 크게 문제되지 않는다고 답변하는 경우도 많다. 어떤 기술자는 콘크리트의 누수 균열은 피할 수 없는 사항이므로 근본적으로 해결할 수 없으므로 완벽한 시공 및 보수는 어렵고, 다만 전체적인 누수량이 어느 정도 이하가 되도록만 관리할 뿐이라고 말하고, 또한 지하 구조물의 누수 균열은 피할 수 없어, 누수를 시각적으로 가리기 위한 보호벽을 쌓아 관리하는 것이 당연하다고 말하는 기술자도 있다. 그럼에도 불구하고 일반 사용자들은 무조건 누수균열이 없어야 한다고 의견을 제시하고 있다. 특히 언론에 구조물 누수의 문제가 수시로 보도되어 관계자 및 관련 건설기술자들의 자존심이 크게 훼손되고, 이를 보수하기 위한 비용이 엄청나게 지출되고 있음을 볼 때 적당히 간과해서는 안될 문제임에는 틀림없다.(중략)
The structural behavior of concrete girder in bridges constructed by free cantilever method is time-dependent due to creep and shrinkage of concrete. The constraint effects of longitudinal movement of concrete girders can introduce unfavourable moment into piers. This study is aimed at proposing a method to reduce the moment of piers in bridge constructed by free cantilever method. The method are systematically composed of time-dependent structural analysis of bridges and loading of control force during construction of bridge. Numerical analyses are carried out depending on the parameters such as amount of control force and flexibility of pier. Time-dependent structural behavior shows that moment of pier increases according as pier height decreases. Also, moment of pier decreases when control method are applied. Numerical result of the study represents that time-dependent moment of piers can be controlled effectively by employing the proposed method.
KSCE Journal of Civil and Environmental Engineering Research
/
v.7
no.1
/
pp.141-150
/
1987
The Soyanggang Dam completed in 1973 was well instrumented during construction period. The measured results for stresses and movements of the embankment have already been published elsewhere, but theoretical analyses have not been made until now. This study intends to analyze the stress and deformation behavior of the embankment numerically which have been subjected to the load of materials during construction and water load during impounding. The constitutive law used for the analyses is hyperbolic model developed by Duncan et al., and a nonlinear incremental finite element analysis simulating its contruction steps is. used in this study. Hyperbolic parameters for each Zone are estimated from literature. The results obtained from the theoretical analyses clearly show deformation characteristics and stress vectors in arbitrary section of the dam. The analytical results ate well agreed with the measured deformations at the maximum cross section, however, there are some discrepancy in horizontal movements and in stresses generated in the core zone. From the numerical analyses and its comparison with the measured values, it is charaterized that relatively large construction settlements occurred in core zone, overburden pressure in the core zone was considerably reduced by arching effect, and tension zones might occur near both abutments because of the large horizontal displacement.
Journal of Korean Tunnelling and Underground Space Association
/
v.15
no.4
/
pp.415-429
/
2013
Performance-based design is becoming a key word for structure design in architectural and civil engineering spheres. In this paper, the need of the performance-based design, especially for tunnels, was enhanced by case study on the largely deformed cut-and-cover arch tunnel built by the prescribed design. In addition, this paper introduces effective method of subdivision on tunnel performance to help field engineer's comprehension. Case study dealing with the issue of typical backwards problem in geotechnical engineering was examined. First of all, the outline of the damaged culvert as well as the surrounding embankment is in detail described. The background, together with the cause of damage, is discussed based on the results of site investigation. Secondly, it was attempted to elucidate the deformation mechanism of the embankment by means of numerical analysis, and the countermeasures are proposed. Finally, the stability of the embankment with the countermeasures was evaluated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.