• Title/Summary/Keyword: 시간기준정비

Search Result 48, Processing Time 0.025 seconds

Development of the Preventive Maintenance Template for Static Exciter in the Nuclear Power Plant (원자력발전소 정지형 여자기의 예방정비기준(PMT) 개발)

  • Chin, Soo-Hwan;Park, Jin-Youb;Hong, Young-Hee
    • Journal of Energy Engineering
    • /
    • v.20 no.2
    • /
    • pp.154-162
    • /
    • 2011
  • PMT(Preventive Maintenance Template) is a standardized maintenance program that describes maintenance items & period as operation condition to increase component reliability at the component level. The existing maintenance programs are focused on time based maintenance to inspect and repair component depend on fixed period. But recently, we have developed advanced maintenance program(named PMT) to increase reliability and optimize maintenance program of the plant significant component. This paper presents how to develop the PMT for nuclear power plant's static exciter.

Development the Preventive Maintenance Template of the Nuclear Steam Turbine based on EPRI PMBD (EPRI의 예방정비기초자료에 근거한 원전 증기터빈의 예방정비기준 개발)

  • Lee, Byoung Hak;Lee, Hyuk Soon
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.1
    • /
    • pp.1-8
    • /
    • 2010
  • The existing maintenance program is focused on time-based maintenance to inspect and repair components according to maintenance period, rather than condition-based maintenance or predictive maintenance. The preventive maintenance template of the steam turbine has been developed for optimizing maintenance procedure and improving reliability and availability of the steam turbine of nuclear power plants based on EPRI PM template methodology and EPRI technical reports about preventive maintenance.

  • PDF

Effect of maintenance of drainage ditches for various uses of paddy fields (논의 다각적 활용을 위한 용배수로 정비 효과)

  • Yi, Hyangmi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.514-514
    • /
    • 2022
  • 쌀 공급과잉이 사회적 문제가 되면서 논에 타작물 재배를 위한 논의 다각적 활용 시스템 구축이 매우 중요해지고 있다. 정부는 이러한 논의 다각적 활용을 위해 2020년에 우리나라 최초의 농지범용화 시범사업 지구를 선정하였다. 전북 김제시 옥성지구는 농지범용화 시범사업 지구로 선정되어 용·배수로 정비가 실시되었다. 따라서 본 연구에서는 전북 김제시 옥성지구 용배수로 정비의 효과를 살펴보기 위해 시범사업 전후의 주요 영농여건 변화 실태를 살펴보았다. 이를 위해 본 연구에서는 농업경영체 DB, 흙토람 등을 이용해 옥성지구 일대 수혜 필지와 비수혜 필지를 추출하고, 각 필지별 실제 경작자 명단을 작성 후 1:1 면담 조사를 실시하였다. 옥성지구 농지범용화 시범사업 면적은 총 50.4ha인데, 169개 필지로 구성되었다. 이 중에서 129개 필지의 총 69명의 경작자 명단이 작성되었다. 그리고 본 연구의 조사에 총 30명이 참여했고, 이 가운데 수혜구역과 비수혜구역의 논을 동시에 경작하고 있는 9농가를 대상으로 논의 다각적 활용을 위한 용·배수 정비 전후의 성과를 조사하여 분석하였다. 첫째, 9농가는 모두 논콩을 재배하고 있다. 이들의 평균 논콩 재배면적은 2020년 1.76ha에서 2021년에는 2.22ha로 증가했다. 그리고 논콩 10a 당 생산량을 살펴보면, 2020년 355.8kg/10a에서 2021년에는 567.2kg/10a로 사업 전후 논콩 단수가 211.4kg/10a 증가했다. 평균 우리나라 전국 콩의 생산량이 203kg/10a, 전북 248kg/10a(2021년 기준)인데 반해 농지범용화 시범사업 지구의 논콩 생산성은 전국 평균보다 높은 것을 알 수 있다. 따라서 논의 다각적 활용을 위한 용배수로 정비를 통해 평균 단수는 211.4kg/10a 증가하기 때문에, 용배수로 정비는 논타작물 생산성 향상에 기여하고 있는 것을 알 수 있다. 둘째, 논의 다각적 활용을 위한 용배수로 정비 이전에 평균 침수 시간은 24시간 이내였다. 이러한 침수로 인해 논콩 재배농가들은 대부분 논타작물 재배의 어려움을 겪었다. 하지만 용배수로 정비 후 평균 침수 시간은 3시간 이내로 단축되었다. 이러한 침수시간 단축은 논콩 생산비 절감으로 이어져 용배수로 정비 후 시범사업 수혜 농가들의 논콩 직접생산비는 10a당 210,200원으로 전년 대비 34,250원/10a 감소하였다.

  • PDF

A Case Study on Improvement of Records Management Reference Table by Reorganizing BRM : The case of Reorganization of Seoul's BRM and Records Management Reference Table (BRM 정비를 통한 기록관리기준표 개선사례 서울시 BRM 및 기록관리기준표 정비사례를 중심으로)

  • Lee, Se-Jin;Kim, Hwa-Kyoung
    • The Korean Journal of Archival Studies
    • /
    • no.50
    • /
    • pp.273-309
    • /
    • 2016
  • Unlike other government agencies, the city of Seoul experienced a three-year gap between the establishment of a function classification system and the introduction of a business management system. As a result, the city has been unable to manage the current status of the function classification system, and this impeded the establishment of standards for records management. In September 2012, the Seoul Metropolitan Government integrated the department in charge of the standard sheet for record management with the department of function classification system into a new department: "Information Disclosure Policy Division." This new department is mainly responsible for record management and information disclosure, and taking this as an opportunity, the city government has pushed ahead with the maintenance project on BRM and Standards for Record Management (hereby "BRM maintenance project") over the past two years, from 2013 to 2014. The study was thus conducted to introduce the case for the improvement of standards for record management through the BRM maintenance project by mainly exploring the case of Seoul. During the BRM maintenance project, Seoul established a unique methodology to minimize the gap between the operation of a business management system and the burden of the person in charge of the BRM maintenance project. Furthermore, after the introduction of the business management system, the city government developed its own processes and applied the maintenance result to the system in close cooperation with the related departments, despite the lack of precedence on the maintenance of the classification system. In addition, training for the BRM managers of the department has taken place twice -before and after the maintenance-for the successful performance of the BRM maintenance project and the stable operation of the project in the future. During the period of maintenance, newsletters were distributed to all employees in an effort to induce their active participation and increase the importance of records management. To keep the performance of the maintenance project and to systematically manage BRM in the future, the city government has mapped out several plans for improvement: to apply the "BRM classification system of each purpose" to the service of the "Seoul Open Data Plaza"; to reinforce the function for task management in the business management system; and to develop the function of a records management system for the unit tasks. As such, the researchers hope that this study would serve as a helpful reference so that the organizations-which had planned to introduce BRM or to perform the maintenance project on classification system-experience fewer trials and errors.

Simulation Analysis to Optimize the Management of Military Maintenance Facility (군 정비시설 운용 최적화를 위한 시뮬레이션 분석 연구)

  • Kim, Kyung-Rok;Rhee, Jong-Moon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.2724-2731
    • /
    • 2014
  • As the future national defense plan of government focus on advanced weapon system, military maintenance facility becomes more important. However, military maintenance facility has been managed by director's experience and simple mathematical calculation until now. Thus, the optimization for the management of military maintenance facility is suggested by more scientistic and logical methods in this study. The study follows the procedure below. First, simulation is designed according to the analysis of military maintenance facility. Second, independent variable and dependent variable are defined for optimization. Independent Variable includes the number of maintenance machine, transportation machine, worker in the details of military maintenance facility operation, and dependent variable involves total maintenance time affected by independent variable. Third, warmup analysis is performed to get warmup period, based on the simulation model. Fourth, the optimal combination is computed with evolution strategy, meta-heuristic, to enhance military maintenance management. By the optimal combination, the management of military maintenance facility can gain the biggest effect against the limited cost. In the future, the multipurpose study, to analyze the military maintenance facility covering various weapon system equipments, will be performed.

Determination of an Optimal Repair Number with Achieved Availability Constraint at RND Stage (연구개발 단계에서 성취 가용도를 고려한 최적 수리횟수 결정모델에 관한 연구)

  • Lee, Jae-Won;Lee, Kye-Kyong;Na, In-Sung;Park, Myeong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.89-98
    • /
    • 2008
  • A preventive maintenance model, caller FNBM($\alpha$, $\delta$, $\gamma$)model, is proposed to decide an optimal repair number under achieved availability requirements(r) along with taking two types of failures (repairable or irrepairable) into account. In this model, the current system is replaced by a new one in case when it doesn't meet the achieved availability requirement, even though it is repairable failure; Otherwise it is replaced in time of the first irrepairable failure. Assumed that the j-th failure is repairable with probability ${\alpha}_j$ minimal repairs are allowed for repairable failure between replacements. Expected cost rate for preventive maintenance model is developed using NHPP(Non-Homogeneous Poisson Process) in order to determine the optimal number $n^*$, also numerical examples are shown in order to explain the proposed model. Since the proposed FNBM($\alpha$, $\delta$, $\gamma$)model includes Park FNBM model(1979) and Nakagawa FNBM(p)model(1983) this proposed model is thought to be better than previous model, especially for weapon system which requires availability as primary parameter.

UAV LRU Layout Optimizing Using Genetic Algorithm (유전알고리즘을 이용한 무인항공기 장비 배치 최적 설계)

  • Back, Sunwoo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.48 no.8
    • /
    • pp.621-629
    • /
    • 2020
  • LRU layout is a complex problem that requires consideration of various criteria such as airworthiness, performance, maintainability and environmental requirements. As aircraft functions become more complex, the necessary equipment is increasing, and unmanned aerial vehicles are equipped with more equipment as a substitute for pilots. Due to the complexity of the problem, the increase in the number of equipment, and the limited development period, the placement of equipment is largely dependent on the engineer's insight and experience. For optimization, quantitative criteria are required for evaluation, but criteria such as safety, performance, and maintainability are difficult to quantitatively compare or have limitations. In this study, we consider the installation and maintenance of the equipment, simplify the deployment model to the traveling salesman problem, Optimization was performed using a genetic algorithm to minimize the weight of the connecting cable between the equipment. When the optimization results were compared with the global calculations, the same results were obtained with less time required, and the improvement was compared with the heuristic.

Heuristic Method for RAM Design of Multifunctional System (다기능 시스템의 RAM 목표값 설정을 위한 휴리스틱 기법)

  • Han, Young-Jin;Kim, Hee-Wook;Yun, Won-Young;Kim, Jong-Woon
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.2
    • /
    • pp.157-164
    • /
    • 2012
  • When designing a multifunctional system consisting of many components performing many functions or missions, it is important to determine the reliability, availability, and maintainability (RAM) of the system and components, and we consider system availability to be the optimization criterion. For given intervals of mean time between failure (MTBF) and mean time to repair (MTTR) of the components, we want to determine the values of MTBF and MTTR for all components that satisfy the target availability. A heuristic method is proposed for finding near-optimal solutions through simulation. We also study numerical examples to check effects of model parameters on the optimal solutions.

Building Bearing Fault Detection Dataset For Smart Manufacturing (스마트 제조를 위한 베어링 결함 예지 정비 데이터셋 구축)

  • Kim, Yun-Su;Bae, Seo-Han;Seok, Jong-Won
    • Journal of IKEEE
    • /
    • v.26 no.3
    • /
    • pp.488-493
    • /
    • 2022
  • In manufacturing sites, bearing fault in eletrically driven motors cause the entire system to shut down. Stopping the operation of this environment causes huge losses in time and money. The reason of this bearing defects can be various factors such as wear due to continuous contact of rotating elements, excessive load addition, and operating environment. In this paper, a motor driving environment is created which is similar to the domestic manufacturing sites. In addition, based on the established environment, we propose a dataset for bearing fault detection by collecting changes in vibration characteristics that vary depending on normal and defective conditions. The sensor used to collect the vibration characteristics is Microphone G.R.A.S. 40PH-10. We used various machine learning models to build a prototype bearing fault detection system trained on the proposed dataset. As the result, based on the deep neural network model, it shows high accuracy performance of 92.3% in the time domain and 98.3% in the frequency domain.

Analysis of Degradation Mechanism for Single Crystal Blade and Vane in Gas Turbine (가스터빈 단결정 블레이드 및 베인의 손상거동 분석)

  • Song, Kyu-So;Kim, Doo-Soo;Lee, Han-Sang;Yoo, Keun-Bong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.35 no.5
    • /
    • pp.549-554
    • /
    • 2011
  • Recently, technical advances have been made in high efficiency gas turbine power plants. In domestic gas turbine facilities, the material properties of the blade and vane are degraded by the daily start-stop operations arising from the thermo mechanical cycle. We surveyed the time dependent degradation of the HP blade and vane to gather basic data for life assessment and damage analysis. The EOH(equivalent operating hours) of the blades were 23,686, 27,909, and 52,859 and the EOH of the vanes were 28,714 and 52,859, respectively. With increased operating hours, the shape of the primary ${\gamma}$' precipitate transformed from cubic to spherical, and its average size also increased. The leading edge area of the blades and the center of the vanes had the worst morphology, and this tendency agrees with the microhardness results. The thickness of the thermally grown oxide at the outer surface of the bond coat increased with increased operating hours.