• Title/Summary/Keyword: 승인절차

Search Result 130, Processing Time 0.022 seconds

전자조달 추진현황 및 계획

  • 변희석
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.11-24
    • /
    • 2001
  • 인터넷을 통해 언제 어디서나 입찰참가/집행가능 전자서명법에 의한 공인인증 적용 [참고 :전자관인]국정원 승인 암호화 절차를 매건 입찰별도 적용 조달청뿐만 아니라 모든 공공기관 공동 활용 가능(중략)

  • PDF

Regulatory Pathways for Siting and Permitting Offshore Wind Facilities (해상풍력발전시설의 부지 및 허가에 관한 승인절차)

  • Yang, Hyoung-Seon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.1
    • /
    • pp.71-77
    • /
    • 2014
  • According to the increasement of demand for energy around globe, the concern degree of advanced countries for ocean energy including offshore wind power becomes excited. In domestic case, the government set up a goal that jumps up to the third ranked powerful nation of offshore wind in the world until 2020 and announced "The plan for 2.5-gigawatt wind farm off the south-west coast by 2019". Also the legal basis was created in order to support development of offshore wind power as 'A law on development, use, supply and promotion for New energy and renewable energy' was established by law. However to promote offshore wind power projects, there are much difficulties that developers should be applied by permitting use of public water surface and regulations of several domestic public institution. Therefore in this paper, we suggested an alternative to promote efficient offshore wind power projects by comparative analysis between domestic and foreign on regulatory pathways for siting and permitting offshore wind facilities.

Certification Procedure and Technical Standards of Terminal Equipment in Canada (캐나다의 단말장치 형식승인제도 및 기술기준 동향분석)

  • Kim, Y.T.;Sohn, H.
    • Electronics and Telecommunications Trends
    • /
    • v.9 no.3
    • /
    • pp.117-138
    • /
    • 1994
  • 기술의 발전과 함께 경제적 측면에서 전기통신은 사회기반구조의 중추적인 일부로 자리잡고 있으며, 궁극적으로는 전세계적인 단일 통신시장이라는 기치아래 각국의 통신시장 개방요구가 점차 확산되고 있다. 이와 맥을 같이 하여 가장 큰 시장을 형성하는 서비스의 최종이용자 장치 즉 단말장치에 대한 규제가 완화되어가고 있는 등 통신시장은 세계화 추세에 있다. 이의 일환으로 자국의 통신질서 유지를 위해 적용되고 있는 단말장치 형식승인제도에 대해 양국 또는 다국간의 국제적 차원에서 상호 공통으로 적용가능한 상호인증제도를 위한 전략수립에 비중을 두고 활동이 전개되고 있다. 본고는 우리나라 전기통신과 깊은 관계를 유지하고 있는 미국 중심의 북미자유무역협정(NAFTA) 체결국중에서 최근 신전기통신법 통과로 관심을 모으고 있는 캐나다에 대해 인증절차와 인증 기술기준 등을 포함한 형식승인제도 전분야를 분석하고 향후 수립될지 모르는 캐나다와의 상호인증을 위한 기초자료로 활용코자 한다.

해외건설공사 수행절차(6) - 시공단계(施工段階)

  • 해외건설협회
    • 월간 기계설비
    • /
    • no.11 s.220
    • /
    • pp.44-47
    • /
    • 2008
  • 많은 난관을 극복하고 조기착공에 성공한 후에, 우선적으로 고려할 사항은 주공정(Crtical Path) 을 관리하는 것이다. 주공정(critical Path)의 초기 작업에 필요한 자재, 장비, 인원의 준비를 재점검하고 하도급추진을 하는 한편, 계약서상의 요구조건, 승인사항에 미흡한 점이 없는지를 검토하고 보완한다. 계약서상의 요구사항을 미비하거나 무시했을 경우, 반드시 그에 상응하는 경제적 대가를 치루어야 한다는 것을 명심해야 한다. 시공을 하기 위해서는 자재승인 후 작업도면(Working Drawing/ Construction Drawing/ Shop Drawing)의 승인을 받고, 작업방법(Method Statement)을 제출하고, 설명화 Presentation) 및 시험시공(Demonstration 또는 Mockup)을 거쳐 감리자의 시공허락을 받아야 하며 각종 Test를 통해 품질관리를 실행해야 한다. 시공지는 시방서에서 요구하는 품질이 보장되는 범위 내에서, 최대한 공기를 단축할 수 있도록 공사초기부터 노력을 해야 하며, 공사의 모든 과정에서 항상 claim 여부, 공기내 준공, 하자 Zero, 최단 시일 내에 최대의 기성취하에 역점을 두고, 이에 장애요인을 해결하는 것으로 공사를 진행해야 한다.

  • PDF

Development of Multiple Regression Models for the Prediction of Flood Control Capacity with Land Use Plan in the Development of Complex Area (단지개발에서 토지이용계획을 고려한 홍수조절용량 예측 다중회귀모형 개발)

  • Park, Yong-Soo;Lee, Chung-Hee;Park, Young-Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.740-745
    • /
    • 2006
  • 최근 중 소규모의 도시개발, 택지개발, 유통단지, 산업단지, 주택단지 조성 등의 단지개발이 급속히 증가하고 있으며, 이에 따라 재해영향평가 및 사전재해영향성 검토도 증가하고 있는 실정이다. 단지개발은 보통 지구지정 또는 기본계획을 수립하여 개발계획 승인을 받고 실시설계를 통하여 실시계획을 승인을 받는 절차를 갖는다. 이에 효율적인 토지이용계획을 위하여 개발계획 승인전에 수십 회의 토지이용을 변경하고 또한 실시계획승인 전에도 토지이용계획은 수회의 변경을 통하여 이루어진다. 이에 재해영향평가 및 사전재해영향성검토를 초기단계에서 수행하는 실무자들은 토지이용계획의 빈번한 변경으로 인하여 저류지 규모 산정에 어려움을 가지고 있다. 단지개발의 토지이용계획 특성상 투수지역이 다소 있는 단지, 투수지역인 공원 녹지, 불투층인 도로 주차장으로 주로 구성된다는 공통점이 있다. 따라서 최근의 심의 완료된 재해영향평가보고서들을 인용, 각 단지개발의 토지이용계획도를 고려한 저류지 홍수조절용량을 산정하는 경험적이고 통계적인 다중회귀모형을 개발하였다. 금회 유도된 다중회귀모형식은 재해영향평가 및 사전재해영향성검토를 수행하는 실무자에게 행정계획단계뿐만 아니라 개발사업단계에서도 신속하게 저류지 규모를 개략 산정하고, 비전문가인 검토자가 신속히 홍수조절용량의 적정성을 검토하는데 매우 효과적으로 사용될 것으로 판단된다.

  • PDF

Status of Aviation Part Market and PMA/EPA (부품승인(PMA/EPA) 제도와 항공부품시장 동향)

  • Jeong, Bong-Gu;Jin, Young-Kwon
    • Current Industrial and Technological Trends in Aerospace
    • /
    • v.7 no.2
    • /
    • pp.106-114
    • /
    • 2009
  • Until now, The Market of aviation parts had led by OEM(Original Equipment Manufacturer) parts because of aviation industry's nature required higher reliability and safety. But recently, The interest about PMA parts in aviation market is increasing continuously with various environmental changes, such as economic stagnation, oil price rise, development of the manufacture technique and newly rising market of Asia-Pacific region. Actually, after 2006, FAA PMA approval parts are increasing at a rate of around 40,000 parts per year and 2.5% of PMA parts penetration, in 2007, in Asia-Pacific market is forecast to enlarge up to 8% in 2017. So, this paper introduces the process requirements of FAA PMA / EASA EPA and the status of PMA market in order to enhance understanding for certification for aviation parts and to review a new PMA market.

  • PDF

The Development of a Railway Safety Maturity Model and Estimate Procedures (철도 안전성숙모델 개발 및 평가절차 방안)

  • Lim, Kwang-Kyun;Yeum, Diogjong;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.195-202
    • /
    • 2014
  • The newly updated Rail Safety Act is required to build a comprehensive railway safety management system with corresponding accreditation regulations for the purpose of safe railway operations. However, such efforts would not be enough to achieve a successful safety-performance solely without being in place of an appropriate level of safety cultures in an organization. No research was taken place to propose a safety culture maturity model and its estimate procedures in Korean railway industries. The research reviews a variety of safety maturity models applied in many other industries and the process of conducting surveys in order to propose a framework of railway safety maturity estimates, with a set of railway safety elements. This research is expected to contribute in diagnosing weak areas and finding their appropriate treatment, along with in placing the railway safety certificate program from 2014.

수지 사람들의 판교 투자 대안은 '광교'

  • Lee, Eun-Suk
    • 주택과사람들
    • /
    • s.190
    • /
    • pp.70-75
    • /
    • 2006
  • 강남 대체지로 스포트라이트를 받는 판교 신도시에 비해 비교적 주목을 덜 받아왔던 광교 신도시. 판교 신도시가 주목받는 동안 절차부심하며 지난해 12월 30일 개발계획 승인을받고 본격적인 사업 시행에 나선 광교 신도시에 세간의 관심이 모아지고 있다. 청약 경쟁률이 높은 판교 신도시 대신 친환경 자족도시 개발로 각광을 받고 있는 광교 신도시 현장을 다녀왔다.

  • PDF

내화유리에 관한 명확한, 단순한, 안전한, 그리고 일괄된 해결책

  • Jeong, Tae-Yeong
    • 방재와보험
    • /
    • s.108
    • /
    • pp.42-46
    • /
    • 2005
  • 차염성과 전면 단열성을 제공하는 내화유리는 어떠한 환경 속에서도 사람과 재산에 대해 효과적인 보호수단이 될 수 있도록 개선, 발전될 가능성을 많이 가지고 있다. 부드럽거나 강한 충격 후에도 안전하게 남아있게 될 적충된 내화유리에서 방출되는 가스의 독성에 대한 고려가 선행된다면 실질적 안전성은 더욱 증대될 것이다. 또한 장래 내화유리 적용에 대한 일관성을 유지시키고 승인된 표준에 따라 통일된 규격과 CE-마킹 절차를 충족시킨다면 최종 소비자는 효과적인 보호를 보증받을 것이다.

  • PDF

Efficiency Improvement of Environmental Assessment Procedure through Introduction of Screening (스크리닝 도입을 통한 환경평가 절차 효율화 방안)

  • Shin, Kyung-Hee;Cho, Kong-Jang;Yim, Hyo-Sook
    • Journal of Environmental Policy
    • /
    • v.10 no.1
    • /
    • pp.129-150
    • /
    • 2011
  • This paper proposes an improvement to differentiate assessment procedure for projects in consideration of their environmental impact as a means to improve efficiency in environmental impact assessment ("EIA") procedure. The targets of analysis were limited to lower impact projects. The current EA system in Korea has already attempted to introduce separate proceedings for certain projects.Tangible results from these efforts, however, have been limited. Other countries have adopted a "screening" system to determine whether EIA is applicable to a particular project, and if so, what procedure will be used therein. Therefore, this study suggests the screening as the process wherein need for EIA is determined with respect to projects which have undergone Prior Environmental Review System(PERS) and which appear to have comparatively negligible environmental impact. In this case, EIA can be omitted and the developer can then draft a mitigation plan instead. This study found that exempting certain projects deemed as having low environmental impact can considerably shorten the duration required for both environmental assessment and consultation, thereby improving efficiency. Other expected effects from the adoption of this screening include reduction in delays in project execution due to environmental assessments and reduced red tape through the provision of increased autonomy to developers and the approving authorities.

  • PDF