중국 Top-Down 공법의 특징과 시공사례 분석 (Characteristics and Case Analysis of Top-Down Construction in China)

  • 방광수;임홍철;이해출;송지윤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.41-44
    • /
    • 2009
  • Top-Down construction is becoming a popular construction method in China as there is a growing need for building high-rise structures in crowded urban areas. This paper deals with the explanation and analysis of characteristics of Top-Down construction in China. In China, usually construction site is relatively large or sometimes huge compared to that in Korea. Thus, as the high-rise portion of the building needs to be constructed first and fast, island method is used at the center p망t of the building. In the meanwhile, the remaining area of the building is constructed using Top-Down method to provide working area for equipments and workers. Also, the case studies of construction examples are provided in this paper. The purpose of this paper is to promote international understanding and interaction between neighborhood countries for the utilization of Top-Down construction.

  • PDF

현장 조건에 따른 Top-Down 공법 사례분석에 관한 연구 (Analysis of Cases Using Top-Down Construction Method Under Various Site Condition)

  • 신현정;신규철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.197-199
    • /
    • 2011
  • To utilize the Top-Down construction method, it is required to analyse building area, floors, and soil conditions to choose the three basic elements of retaining wall, base column, and floor structure. The purpose of this research is to compare the methods of Top-Down with other construction methods. The research method is to analyse the project conditions of Top-Down project cases. The aim is to develop a method of selecting alternatives, considering construction characteristics, work schedule, supporting methods, foundation types.

  • PDF

CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례 (Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method)

  • 이정배;임인식;김동현;오보환;하인호;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

CWS공법(buried wale Continuous Wall System)의 개발에 관한 연구 (Study on Development of CWS (buried wale Continuous Wall System) Method)

  • 이정배;임인식;천성철;오보환;하인호;임홍철
    • 한국건축시공학회지
    • /
    • 제6권2호
    • /
    • pp.81-89
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved qualify and reduction of construction period can be obtained from CWS method.