A new method for water level measurement method and its verification results are described. In this method, water surface in motion can be detected by temporal variation of pixel arrangement in successive digital images including the boundary between the staff gauge and the water surface. Laboratory and field tests were conducted for the two cases in which the staff gauge was contaminated by dirt or transparent due to clear water. The result shows water level can be accurately measure by this method for these two cases. It is expected that the accuracy of previous image stage gauge will be improved by the new method.
We applied a slope-stability analysis method, considering infiltration by rainfall, to the construction site where an express highway is being extended. Slope stability analysis that considers infiltration by rainfall can be classified into three methods: a method that considers the downward velocity of the wetting front, a method that considers the upward velocity of the groundwater level, and a method that considers both of these factors. The results of slope stability analysis using $Bishop^{\circ}{\Phi}s$ simplified method indicate that the safety factor due to the downward velocity of the wetting front decreases more rapidly than that due to the upward velocity of the groundwater level. For the third of the above methods, the safety factor decreases more rapidly than for the other two methods. Therefore, slope stability during rainfall should be analyzed with consideration of both the downward velocity of the wetting front and the upward velocity of the groundwater level.
Recently, the frequency of typhoons have increased due to the effects of climate change. As a result, in mountain streams, it has caused streamflow increase upstream and frequent water surface elevation downstream. This study analyzed the effects of the heavy rainfalls caused by Typhoon Sanba, which had a direct impact on Korea between September 17 and 18, on the water level variations downstream in mountainous streams. In addition, the drainage basin of Samcheok Oship stream was chosen as the object of this study. This study analyzed the flood level by applying HEC-RAS model. The observed water level measured in 2012 and the water level simulated by HEC-RAS model showed similar results. In addition, the simulation results showed the maximum flood level was 5.32m the mean flow velocity was 2.33m/sec and the maximum channel water depth was 7.51m. The analysis showed that the heavy rainfalls caused by Typhoon Sanba had an impact on the water surface elevation in Oship stream. The final results from this study will give a reasonable and important data to perform the Design of Hydraulic Structure.
Kim, Yun-Tae;Shim, Jae-Hyun;Chung, Jae-Hak;Ahn, Jae-Chan
Journal of the Korean Society of Hazard Mitigation
/
v.4
no.3
s.14
/
pp.51-60
/
2004
Urban flood damage has been caused by drainage deficiency. One of the methods to solve this problem is to construct detention basin and Pumping station and to pump out the water to the river. However, because of rapid urbanization, the capacity of drainage pipelines is sometimes not sufficient enough during the rainy season. Therefore, even though we have enough pumping stations, the inflow of surface water never reaches to the detention area, causing floods in urban area. This research is to find improvement of urban drainage system, estimating drainage pipeline risk. Also, eight models for a computer program were developed for practical use. The models were verified changing precipitation duration, intensity, design period, time distribution model, and etc. This verification was processed focusing that the model can regulate the water level in the detention basin and minimize the effect downstream. As a result Fuzzy models were found to be efficient to lower the water level in detention basin, and decreased about 8 cm in water level of downstream.
Journal of the Korean Society of Groundwater Environment
/
v.5
no.2
/
pp.110-115
/
1998
In this paper, the sensitivity of the leachate level is analyzed using the program HELP to reduce the high leachate level on the landfill. Hydraulic parameters analyzed were porosity, field capacity, wilting point and initial water content of cover soil and waste. Also, the influence of the difference between the initial water content and the field capacity on the leachate level in the landfill was analyzed. The results of the sensitivity analysis show that the increase of the porosity and the wilting point decreases the leachate level, while the increase of the field capacity and the hydraulic conductivity increases the leachate level. Major parameters to the change of the leachate level were the hydraulic conductivity in the case of cover soil and the porosity, the field capacity and the initial water content in the case of waste.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.2135-2139
/
2007
현재 한국농촌공사에서는 농업용수의 효율적인 관리를 위하여 물관리자동화사업을 시행하고 약 8만ha를 대상으로 418개의 수리시설을 전동화하였다. 물관리자동화사업에서의 물관리는 공급자 위주로서 이미 결정되어진 물의 양을 시기에 따라 적절하게 공급하여 주며 이를 계측하고 제어하기 위한 시설이다. 그러나 현재 실제로 물관리가 일어나는 곳을 말단포장으로서 급수물꼬의 개폐에 따라 농업용수의 공급과 단절이 이루어지고 있다. 이러한 사실에 착안하여 본 연구에서는 급수물꼬를 논의 담수심에 따라 자동으로 개폐시키는 자동물꼬, 논의 담수심과 수로의 유황상황을 체크하여 정보전달을 수행하는 수로수위측정 및 담수심 측정장치, 상기의 논과 수로의 유황정보에 의하여 논에 물을 공급하는 태양광 전동수문, 수로의 수위증감에 따라서 수로의 수압을 일정하게 형성시켜 용수공급을 원활하게 해주며 또 기존의 제수문과는 다르게 항상 수위를 일정하게 유지하면서도 하류방향으로 물을 공급해주는 무동력 자동수문을 개발하여 시스템으로서 구성하여 설치하였다. 현재 담수심 측정 및 수로수위측정장치로부터의 정보전달은 무선으로 하며 이 정보를 기초로 하여 태양광 전동수문의 모터제어부에서 판단을 하여 수문의 개폐를 지시한다. 또한 무동력 자동수문의 경우에는 부력부가 별도로 설치되어 있어서 주수부를 통하여 수로내 수위와 같은 레벨로 물이 유입되고 이를 플로트가 감지하여 수문비 후방에 설치되어 있는 밸런스 웨이트를 제어하여 수문을 개폐한다. 본 무동력 자동수문은 수위를 유지하는 설정수심을 자유로이 변경할 수 있도록 주수부를 개량하였으며 부력부에 오물유입이 되지 않도록 스크린을 주수부의 물유입장소에 설치하였다. 현재까지 시스템의 작동상황에 대한 성능은 양호하다. 다만 향후의 문제점으로서 시스템이 설치된 지역과 설치되지 않은 지역과의 용수사용량을 비교분석하는 작업으로 본 시스템의 경제적 효과 및 효율성을 증명할 필요가 있으며 본 시스템의 실용화시 시스템 사용방안에 대해서는 대규모 평야부와 저수지 지구의 물공급특성이 다르기 때문에 이를 감안한 시스템 구성을 할필요가 있다.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.173-177
/
2007
현재 농업용수 이용량은 158억$m^3/yr$로 우리나라 전체 수자원이용량의 48%에 해당되며 하천유지수량을 제외하였을 경우 61%에 해당된다. 농업용수의 이용은 노후화된 농업수리시설과 관리기술 부족 등의 원인으로 이용효율이 낮은 것으로 추정되고 있다. 그러나 이러한 현황을 뒷받침해 줄 측정 및 조사자료가 부족한 실정이다. 농업용수의 물관리 연구는 장기간의 신뢰성 있는 수문자료의 획득이 절대적으로 필요하고 실제 현장에서의 물관리 상황을 조사파악하는 것이 중요한다. 이러한 자료의 축척은 체계적이고 일관되게 수행되어야 한다. 이를 위하여 한국농촌공사에서는 2000년에 경기도 용인에 위치한 이동저수지 유역을 종합시험지구로 선정하여 운영하게 되었다. 이동시험지구는 경기도 용인시, 평택시, 안성시, 사이에 위치한 전형적인 농촌지역이다. 저수지와 양수장 시설이 복합적으로 운영되어 농업용수를 공급하는 지구로 농업용수의 물관리 연구 수행을 위해 적합한 지역이다. 이동시험지구에 강우계, 저수지 수위계, 하천 수위계, 수로 수위계를 설치하여 운영하고 있으며 정기적으로 유지 관리 및 자료수집을 함으로써 신뢰성 있는 농촌지역 수문자료를 축척하고 있다. 이동시험지구의 운영은 농업용수 물관리와 관련된 체계적이고 신뢰성 있는 장기간의 수문자료를 축척하고 축척된 현장 자료의 분석을 통해 물관리 기초자료를 계량화 하는데 그 목적이 있다. 본 연구의 목적은 실제 농업용 저수지의 용수공급 운영에 따라 하천에서의 유출특성에 대한 조사를 통하여, 농업용저수지가 하천에 미치는 영향을 파악하고자 한다. 시험지구 덕성교 하천수위관측지점의 하천유출율은 65 %, 재인교 하천수위관측지점의 경우 하천유출율은 60 %를 나타내었다. 이동유역의 경우 상류에 저수지가 있으며 저수지의 시기별 저수상태와 강우량에 따라 유출에 영향을 받고 있다. 1월에 상류 저수지의 저수상태가 만수를 유지하고 있었으며 예년에 비하여 많은 강우가 발생하여 저수위 조절 차원에서 인위적으로 방류한 양이 많았기 때문으로 추정할 수 있다. 두 지점의 1월 유출이 100 % 이상인 것은 동절기 하천 결빙으로 인한 유량파악이 힘든 것으로 나타났다. 1월의 하천수위는 계측기에 기록된 수위값으로 유량을 산정한 것이다. 3월, 10월, 12월의 유출이 많은 것은 전월말 발생한 강우의 영향으로 크게 나타났다.
We examined temporal variations in and relationships among groundwater level, groundwater temperature, and electric conductivity, and estimated groundwater recharge at Jeju Island. The time lag and regulation time of groundwater level data revealed that monitoring well in Ansung (JM-AS) has the highest auto-correlation. The cross-correlations for electric conductivity-water level, precipitation-water level, and air temperature-water temperature revealed that monitoring well in Seogwi-2 (JR-SG2) (electric conductivity-water level), monitoring well in Hamo (JD-HM) (precipitation-water level), and monitoring well in Wonjongjang-2 (JT-WJJ2) (air temperature-water temperature) had the highest cross-correlations. The average groundwater recharge ratio was 39.61%, and the average groundwater recharge amount was 1,153,490,407 $m^3/yr$, which is consistent with the results of previous studies.
A modeling was performed to predict the groundwater recovery in the vicinity of the waterway tunnel area using a groundwater flow model MODFLOW. The model was calibrated to reproduce measured groundwater levels and observed flow rates into the tunnel prior to lining, and then used for flow simulation under transient condition. Model predictions under steady-state condition revealed that if tunnel conductance had been reduced by 25% to 90%, groundwater levels would recover between 8% and 72.4% of their initial levels and flow into the tunnel will decrease between 5.5% and 82.7%. In case of 75% tunnel condutance ruduction in transient simulation. most of wells were predicted to recover within 20 years or so. The complete recovery for the wells with the groundwater level over 70 m was found to be impossible. For the 90% tunnel conductance reduction, all wells were found to be recovered within 15 years.
Recently, land subsidence and sinkhole are generated due to a change in the groundwater level in the city. For this reason, the necessity for management of stable underground water level is on the rise. In this study, it was conducted for the underground structure that passes through the lower of bus transfer center construction site to examine the influence on the stability for underground structures to changes in the groundwater level and effective stress, the coupled finite element analysis and structural analyses were performed to evaluate stability for underground structure. It is to secure stability for underground structures according to underground water level declines. In this way, effective construction management will be made by previewing and forecasting the influence on the ground behavior and adjacent structures due to changes in the groundwater level.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.