• Title/Summary/Keyword: 수압 시스템

Search Result 185, Processing Time 0.026 seconds

Development of Automation System of Water-Hydraulic and Leakage Test for Pressure Vessel (압력용기 수압 및 기밀시험 자동화 시스템 개발)

  • 이원희;김동수;이승현;김광영
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1672-1675
    • /
    • 2003
  • In this study, we developed full automation test system for pressure vessel. This pressure vessel containing oxygen, nitrogen and carbon is widely used in industrial field. The test items of pressure vessel are divided into three branches which is weight measurement, water-hydraulic, and leakage test. After leakage test is completed, cleaning and dry progress is carried out. And control system is consist of three controller which is PLC, monitoring system and database system. PLC is control all of system. Monitoring system measures weight, pressure, flow etc and display to all conditions. Database system stores tested data. we design system to control all test modules in communication by a second period with three control modules. Finally, we verified this system by field test.

  • PDF

Development and Performance Test of the KSLV-I KM Case (KSLV-I KM 케이스 개발 및 성능 시험)

  • Kil, Gyoung-Sub;Lee, Mu-Guen;Lee, Kyung-Won;Cho, In-Hyun
    • Aerospace Engineering and Technology
    • /
    • v.6 no.2
    • /
    • pp.188-196
    • /
    • 2007
  • A composite case was designed to satisfy the required condition of KSLV-I kick motor system. we performed the structure and combustion tests to insure the reliability of the case before the production of the flight model. The hydraulic, vacuum and non destruction testes as the structure test were carried out to confirm the strength of the components of the case and the characteristics of the thermal and structure were investigated through the ground combustion test.

  • PDF

EGS Power Generation and Hydraulic Stimulation (EGS 지열발전과 저류층 수리자극 기술)

  • Min, Ki-Bok;Song, Yoonho;Yoon, Woon-Sang
    • Tunnel and Underground Space
    • /
    • v.23 no.6
    • /
    • pp.506-520
    • /
    • 2013
  • While geothermal energy provides the only base-load power among renewable energy sources, its development has been carried out predominantly in volcanic area. EGS (Enhanced Geothermal System) is a ubiquitous technology that can allow the geothermal power generation virtually in any area. This manuscript introduces the current state-of-the-art of EGS development in the world and presents the hydraulic stimulation technology and associated microseismicity which are key technical component in EGS. Finally this paper suggests the key research areas required in Korea for further development of EGS.

Analysis of hydraulic system for seawater desalination plant through piping analysis program (배관 해석 프로그램을 통한 해수담수화 플랜트 수압 시스템 분석)

  • Choi, Jihyeok;Choi, Yongjun;Yang, Heungsik;Lee, Sangho;Choi, June-Seok
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.3
    • /
    • pp.221-230
    • /
    • 2020
  • In actual seawater desalination plant, the pressure loss due to frictional force of pipe is about 3~5 bar. Also, the pressure loss at pipe connection about 1~3 bar. Therefore, the total pressure loss in the pipe is expected to be about 4~8 bar, which translates into 0.111 to 0.222 kWh/㎥ of energy when converted into the Specific Energy Consumption(SEC). Reducing energy consumption is the most important factor in ensuring the economics of seawater desalination processes, but pressure loss in piping is often not considered in plant design. It is difficult to prevent pressure loss due to friction inside the pipe, but pressure loss at the pipe connection can be reduced by proper pipe design. In this study, seawater desalination plant piping analysis was performed using a commercial network program. The pressure loss and SEC for each case were calculated and compared by seawater desalination plant size.

Detecting Multiple Leaks in Water Pipe Networks (상수관망 내 다중누수 탐지를 위한 모형 개발)

  • Choi, Jeongwook;Jeong, Gimoon;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.92-92
    • /
    • 2020
  • 최근 지진 발생 빈도와 규모가 증가함에 따라 지진재해에 취약한 지하구조물의 내진성능 향상 및 신속한 복구에 관한 연구가 활발히 진행되고 있다. 대표적인 지하구조물 중 하나인 상수관망은 음용수를 안전하고 원활하게 공급하는 사회기반시설물로써 대부분의 시설물이 지하에 매설되어 있어 지진재해에 매우 취약하다. 지진으로 인해 상수관망 내 누수 및 파손 등의 피해가 발생할 경우, 물 공급이 중단되어 경제적 손실과 사회 전반적인 불편이 우려되므로 피해 관로의 신속한 파악과 복구가 이루어져야 한다. 상수관로에 발생하는 피해는 크게 누수와 파손으로 구분할 수 있다. 관로가 파손된 경우 용수가 표층으로 새어나오기 때문에 탐지가 용이하지만, 누수의 경우 표층으로 드러나는 피해가 없어 탐지 및 수리가 어려운 단점이 있다. 이러한 누수가 장기간 방치될 경우, 해당 시스템의 유수율 감소로 인한 경제적인 손실과 더불어 공급수압의 저하, 그리고 오염물 침투의 위험이 존재한다. 이러한 피해를 막기 위해서는 신속히 누수 지점을 파악한 후, 피해 관로의 교체 혹은 보수가 이루어져야 한다. 현장에서 누수를 직접 탐지하는 방법은 정확도가 높은 반면, 많은 인력과 장비 그리고 비용이 소모되는 단점이 존재한다. 따라서 현장 누수탐지에 앞서 컴퓨터를 이용한 간접 누수탐지 기법이 지속적으로 개발될 필요가 있다. 본 연구에서는 현장 누수탐지의 탐지효율을 향상시키기 위해 수압, 유량 등의 관측 데이터와 수리해석 모의 및 최적화 기법을 활용한 컴퓨터 기반의 다중누수 탐지모형을 개발하였다. 개발 모형은 국내에서 운영 중인 소블럭 상수관망시스템에 적용하여 검증하고 탐지효율을 분석하였다. 컴퓨터 모의를 이용한 다중누수 탐지모형은 지진이나 홍수와 같은 대규모 재난 발생 후, 상수관망시스템의 신속한 복구 및 운영 정상화를 위한 도구로 활용될 수 있을 것으로 기대한다.

  • PDF

Application of Resistivity/SP Monitoring Technique to Maintenance of Water Utilization Facilities (수리시설물의 유지관리를 위한 비저항/SP 모니터링기법 연구)

  • Park, Sam-Gyu;Kim, Jung-Ho;Seo, Goo-Won;Won, Jong-Geun;Kim, Byung-Ho
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.71-76
    • /
    • 2005
  • The subject of this paper is research into the application of resistivity/SP monitoring to detecting the water leakage of water utilization facilities. For this purpose, we installed a comprehensive monitoring system consisting of resistivity/SP measurement, inclinometer, piezometer, and water gauge at an embankment, Using this monitoring system, we monitored the various kinds of measurement data and compared the resistivity structures and SP variations that of hydrological and engineering data in order to investigate the water leakage and stability of the embankment. The variations of resistivity and SP at the embankment were provided from the monitoring data and we could accurately locate the portions of which resistivities and SP have sharply changed, Furthermore, we could estimate the stability of the embankment more effectively and quantitatively by jointly interpreting the monitoring data of resistivity and SP, water level, pore water pressure, and subsurface displacement. The monitoring experiments in this study led us to the conclusion that for the efficient maintenance of the water utilization facilities, monitoring the resistivity and SP data would be much more preferable to performing the just one-time measurements.

  • PDF

Application of Electrical Resistivity Monitoring Technique to Maintenance of Embankments (저수지의 유지관리를 위한 전기비저항모니터링 기법 응용)

  • Park Sam Gyu;Kim Jung-Ho;Seo Goo Won
    • Geophysics and Geophysical Exploration
    • /
    • v.8 no.2
    • /
    • pp.177-183
    • /
    • 2005
  • The subject of this paper is research into the application of electrical resistivity monitoring to detecting the water leakage of water utilization facilities. For this purpose, we installed a comprehensive monitoring system consisting of resistivity measurement, inclinometer, piezometer, and water gauge at an embankment. Using this monitoring system, we monitored the various kinds of measurement data and compared the resistivity structures and that of hydrological and engineering data in order to investigate the water leakage and stability of the embankment. The variant images of electrical resistivity at the embankment were provided from the monitoring data and we could accurately locate the portion of which resistivities have sharply changed. Furthermore, we could estimate the stability of the embankment more effectively and quantitatively by jointly interpreting the monitoring data of resistivity, water level, pore water pressure, and subsurface displacement. The monitoring experiments in this study led us to the conclusion that for the efficient maintenance of the water utilization facilities, monitoring the resistivity data and hydrological data would be much more preferable to performing the just one-time measurements.

Proposal of Youngjong-do 112 Block Demo-Plant for Application of Smart Water Grid (SWG 적용성을 위한 영종도 112블록 데모플랜트 구축 방안)

  • Han, Kuk Heon;Park, Hyun Ki;Kim, Young Hwa
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.108-108
    • /
    • 2016
  • 스마트워터그리드(Smart Water Grid; 이하 SWG)란 현재 직면에 있는 물 부족, 물 안보, 물 복지 등 물에 대한 문제를 ICT 기술을 활용하여 물관리의 새로운 패러다임을 제시할 수 있는 융합 기술이다. 즉, SWG는 기존의 수자원 관리 시스템의 한계를 극복하기 위해 첨단 정보통신기술을 이용하는 고효율의 차세대 인프라 시스템으로 다양한 수원을 활용하고 물을 효율적으로 배분 관리 운송하여 수자원의 불균형을 해소하고, 첨단센서네트워크를 이용해 용수관리 전분야에 걸쳐 양방향 실시간으로 용수정보를 감시 대응하여 용수관리와 에너지 효율의 최적화된 메가시티(mega-city)에 적합한 지능형 물관리가 가능할 것으로 예상되는 시스템이다. 따라서 국토교통부 과제로 추진중인 SWG 연구단에서 개발한 스마트 워터 기술을 영종도 112 블록에 적용하여 지역주민의 물복지 향상 및 물 사용자에 대한 소비자 만족도를 높이는데 목적을 두고 데모플랜트를 구축 방안을 수립하였다. 영종도 112블록(인천 운서동 및 운북동 일원)은 인천 공촌정수장에서 해저관로를 지나 영종통합 가압장에서 가압 후 공항신도시배수지에서 물을 공급받고 있는 지역으로 면적은 $17.41km^2$, 인구는 약 17,000명, 물사용량 $8,000m^3$/일, 총관로연장 약 55km, 유수율이 겨우 73.2% 지역이다. SWG 적용성 평가를 위해 영종도 112 블록에 유수율 제고 및 운영비용 저감을 목적으로 데모플랜트를 구축하였다. 스마트 계측을 위해 스마트미터 469개(15~20mm), 디지털미터 172개(25~200mm), 누수유무센서 1개소, 다항목 수질측정기 1개소, 유량계 3개소, 수압계 5개소, AMI 시스템 641개 및 물효율 운영프로그램과 물정보 App서비스 기능으로 구성하였다. 물효율 운영프로그램은 실시간 수요량 예측, 배수지 운영에 따른 취수량, 송수량, 펌프 대수조합 및 운전스케줄링이 가능한 경제적 물공급 스케줄링, 관망상태 감시 및 제어(실시간 유량/수압 분석을 통한 누수분석) 기능이 탑재되어 통합운영센터에서 운영할 계획이다. 데모플랜트 운영을 통해 수자원의 효율적인 배분 및 공급, 유지관리 향상, 운영 비용 최소화 등의 결과를 바탕으로 신도시 및 기존도시의 물관리 정책수립에 활용할 수 있을 뿐만아니라 시간적 공간적 불균형 해소 및 물시장 발전에 크게 기여할 것으로 사료된다.

  • PDF

Assessment of the Anchor Head System Embedded in the Ground Surface (지표면에 근입한 앵커두부처리 시스템의 적용성 평가)

  • Min, Kyoung-Nam;Bae, Woo-Seok;Ahn, Kwang-Kuk;Jeong, Ku-Sic
    • The Journal of Engineering Geology
    • /
    • v.22 no.1
    • /
    • pp.49-58
    • /
    • 2012
  • Anchor heads a recommonly exposed to surface weathering processes that cause physical damage by vibration and external forces. This study presents a new method of anchor-head installation that uses near-surface embedding based on analyses of concrete block failure. ABAQUS 3D numerical modeling performed to compare this method with the standard technique and to analyze the distribution of displacement and the stress pattern. In addition, application of the method to a real-world case was tested by in-situ measurements. The results show a maximum vertical stress of 9.73 MPa and vertical displacement of 1.34 mm. Field tests indicated that displacement of a concrete block was 3 to 4 times greater than that of an embedded bearing plate.

A Numerical Study on Hydraulic Behavior in a Fractured Rock Medium with Hydromechanical Interaction (수리역학적 상호작용을 고려한 균열암반매질에서의 수리학적 거동에 대한 수치적 연구)

  • Jeong, Woochang;Park, Youngjin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.2
    • /
    • pp.61-68
    • /
    • 2009
  • This paper presents the numerical investigation for the hydraulic behavior of a fractured rock mass with a hydromechanical interaction which may be considered during the in-situ hydraulic injection test. These experiments consist in a series of flow meter injection tests for fractures existing along an open hole section installed in a borehole, and experimental results are applied for testing a numerical model developed to the analysis and prediction of such hydromechanical interactions. Field experimental results show that conductive fractures form a dynamic and interdependent network, that individual fractures cannot be adequately modeled as independent systems, that new fluid intaking zones generate when pore pressure exceeds the minimum principal stress magnitude in that borehole, and that pore pressures much larger than this minimum stress can be further supported by the circulated fractures. In this study, these characteristics are investigated numerically how to influence the morphology of the natural fracture network in a rock mass by using a discrete fracture ntework model.

  • PDF