A Case Study of Collapse and Reinforcement for Large Span Waterway Tunnel at Thrust Fault Zone (스러스트 단층대에서의 대단면 수로터널 낙반 및 보강 사례)

  • Kim, Young-Geun;Han, Byeong-Hyun;Lee, Seung-Bok;Kim, Eung-Tae
    • Tunnel and Underground Space
    • /
    • v.21 no.4
    • /
    • pp.251-263
    • /
    • 2011
  • The geomechanical characteristics of rock and the structural geological feature of the fault should be studied and examined for the successful construction of large-span tunnel. In this case study, that is a important case for the tunnel collapse and reinforcement during the construction for the waterway tunnel at large thrust fault zone in schist, we carried out geological and geotechnical survey for make the cause and mechanism of tunnel collapse. Also, we have designed the reinforcement and re-excavation for the safe construction for collapse zone and have carried out successfully the re-excavation and finished the final concrete lining.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

A study on the maintenance methods of the multi-purpose double-deck tunnel (다목적 터널의 기능별 유지관리 방법에 대한 고찰)

  • Moon, Hoon-Ki;Song, In-Cheol;Kim, Jae-Won;Lee, Hye-Yoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.1
    • /
    • pp.83-93
    • /
    • 2017
  • Recently, the development of multi-purpose tunnel that has functions of roads and waterways has been attention for efficient utilization of underground space. However, there is no study on the multi-functional tunnels behavior for the convert of iterative function and change of water pressure. In this study, the vulnerable section was analyzed due to repeated functional change. A basic review was implemented for the operation of the multi-purpose double-deck tunnel. Also, the vulnerable section for convert of iterative function of multi-functional tunnel has been analyzed by simulation. Management of multi-functional tunnel should considered in various analyzed and some problems. The criteria for management of multi-functional tunnels is proposed.

A Study on Efficiency Improvement through Productivity Analysis Based on TBM Operation Data (TBM공법 적용 현장별 생산성 분석을 통한 효율성 개선 방안)

  • Park, Hong Tae;Song, Young Sun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.71-77
    • /
    • 2010
  • This study presented the operation method through of productivity on eight analysis work items (TBM boring, cutter check and exchange, TBM maintenance, succeeding facilities, reinforcement in tunnel, operation alternation, a tram car) which have developed equipment at WRITH with TBM a waterway tunnel works. It was inquired lose time with analyzed result by work items and removed lose time. It was analyzed TBM boring length, TBM boring length percentage and TBM boring length time. This study analyzed TBM operation utility factor of a foreign work with TBM operation boring length percentage, a monthly average boring length, pure boring length percentage etc. and assumed a monthly average boring length and a monthly average boring length of rise forecast. Based on analyzed Data, TBM boring has been forecasted propriety pure boring length at compressive strength $675{\sim}1662kgf/cm^2$.

서울 남부순환 도로, 관악터널 설계

  • 지왕률;박성록;황기수;정해성;이철수
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2002.03a
    • /
    • pp.19-26
    • /
    • 2002
  • 서울시에 건설될 새로운 내부 남부순한 도로는 제2 성산대교와 서쪽의 주요 고속화 도로를 연결하는 초고속 도로망을 구축할 것이다. 노선연장은 지하구조물 10.4km를 포함하여 총 34.8km에 달한다. 도로망이 완성되면 수도 서울 중심가의 심한 교통체증은 상당부분 완화 될 것이다. 공사비 7000억원에 이르는 대규모의 서울 남부순환 도로는 3차선 병렬터널 3개 공구를 포함하는 것으로 계획되어졌다. 이들 터널은 3차선, 일방향, 병렬터널로서 계곡부를 관통하며 굴착공법은 대부분 발파공법으로 계획되어져 있다. 가장 긴 관악터널은 지질조건이 복잡하며 따라서, 이런 지반에 적용성이 좋은 발파공법에 의한 굴착으로 계획되어졌다. 특히, 갱구부는 지질상태가 매우 불량하여 풍화암 자연상태로 설계하는 것이 불가능하였다. 설계자들은 터널 화재와 교통사고 등과 같은 터널내에서의 긴급상황에 대한 최적의 대책 수립에 중점을 두어야만 했다. 관악 터널 상부에 위치한 수로관을 통과하는 방법을 찾는 것이 당면 최대 관건이었다. 또한, 갱구부 주변지역의 환경을 보존하고 현장의 자연적인 아름다움 을 유지하기 위하여 굴착량을 최소화하는 공법선정이 중요하였다.

  • PDF

A STUDY ON THE ANALYSIS ZONE OF MOUNTAIN TWIN WATER TUNNELS (산악지 쌍글 수로터널 해석에 대한 고찰)

  • Baek, Yeong-Sik;Kim, Hong-Taek;Im, Su-Bin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.21-26
    • /
    • 1993
  • Using the well-known FLAC program an analylical parametric study was made to investigate the horizontal and vartical solution zone applied to the mountain water tunnel analysis. In the analyses two different heights(30m, 130m) of overburden soils measured from the center of a tunnel and three different coafflclants of lateral earth pressures(0.25, 0.75, 0.5) were adopted. Also the effected of plliar width between twin tunnels, having two different heighte of overburdon soils as well as different soil conditions, were analyzed.

  • PDF