• Title/Summary/Keyword: 수력발전

Search Result 327, Processing Time 0.033 seconds

A study on I & C system for newly hydro power plant (최신 수력발전소의 I & C system에 관한 연구)

  • Lee, Jung-Whan;Kwon, Hyuk-Jung;Cho, Nam-Bin
    • Proceedings of the KIEE Conference
    • /
    • 1998.07b
    • /
    • pp.737-739
    • /
    • 1998
  • This presentation describes an experiment to intergrated control, protection and measurement system configulation at KOWACO's Yongdam hydro-power station currently constructed by discrete electronic and electromechenical devices. The experiment is designed to exploit existing microcomputer technologies, digital signal processors, m/w&fiber optic communications. The theory of operation and advantages of the intergrated approach are discussed.

  • PDF

China's Western Region Development and IT Policy (중국의 서부대개발과 IT 정책)

  • Chun, H.W.
    • Electronics and Telecommunications Trends
    • /
    • v.18 no.6 s.84
    • /
    • pp.85-92
    • /
    • 2003
  • 중국은 경제개방 이후 남부 및 동부 연해를 중심으로 고도성장을 이룩하였으나 서부지역은 개발이 지체되어 지역격차가 심화되었다. 중국정부는 균형발전과 내수진작 및 소수민족 거주지역의 정치안정을 도모하기 위해 서부대개발을 추진하고 있다. 4대프로젝트(천연가스 연결, 수력발전소 건설, 양자강수로 황하연결, 환경보호 위한 식목사업) 외의 정보통신부문은 IT 기술 확대적용, 정보화 촉진, 광대역 네트워크 구축, 무한의 광통신밸리, 사천성의 서부실리콘밸리, 서안의 중국판 실리콘밸리 구축 등이 있고, 시장확대와 신규수요 창출로 우리에게 새로운 기회를 제공하고 있다.

Determination of the Optimal Contract Amount of the Hydropower Energy Considering the Reliabilities of Reservoir Inflows (저수지(貯水池) 유입량(流入量)의 신뢰도(信賴度)를 고려한 최적(最適) 계약전력량(契約電力量)의 결정(決定))

  • Kwon, Oh Hun;Yoo, Ju Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.2
    • /
    • pp.141-149
    • /
    • 1993
  • Production of hydro-energy is random in its output amount due to the characteristics of the reservoir inflows. Therefore, it is necessary to provide the rationality in determining the amount of energy for a supply contract. This study presents a methodology for determining reasonably reliable amount of the energy supply considering the energy sale-incomes associated with the penalties which are subject to inflow-reliabilities. The objective function consists of the returns of energy sales and the risk-loss function to reflect statistically relevant risks. A range of the coefficient of the risk-loss function was figured out by its sensitivity analysis. The risk-loss herein means the penalty which should be paid by the energy supplier in case that the level of the energy supply is behind the contracted amount. And the reliability of reservoir inflow is defined by the exceedance probability of the inflow. The log-normal distribution was accepted as the probability density function of monthly inflows on the level of significance at 5%. Golden-ratio searching was applied to identify the optimal reliability and Incremental Dynamic Programming was used to maximize generation of the hydro-power energy in reservoir operation. The algorithm was the applied to the Daechung multi-purpose reservoir and hydro-power plant system in order to verify its usefulness.

  • PDF

Development of a Linked Operation System for Improving Water Supply Capacity of Dams (댐 용수공급능력 향상을 위한 연계운영 체계 개발)

  • Yong Hyeon Gwon;Soo Deok Hwang;So Hyun Choi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.398-398
    • /
    • 2023
  • 하천시설의 관리규정(하천법 제 14조)에서는 댐, 보 등의 하천시설물은 하천시설의 관리규정을 정하고 있으며 홍수 재해 방지와 수자원의 효율적인 운영을 위하여 필요시 둘 이상의 하천시설 간 유기적인 연계운영에 관한 관리규정을 정할 수 있다고 명시하고 있다. 또한, 댐과 보등의 연계운영규정(환경부 훈령 제1348호)에서는 댐, 보, 둑높임농업용저수지 등 하천시설에 준하여 시설의 연계운영을 실시할 수 있으며, 갈수 및 홍수로 인한 재해 방지 및 수자원의 효율적인 운영을 위한 방안 마련이 시도되고 있다. 이에, 환경부와 한국수력원자력(주)에서는 한강수계 발전용댐 다목적 활용에 관한 협약을 체결하여 발전용댐의 운영계획 및 발전용댐과 다목적댐간 연계 운영계획을 수립하고 있다. 이에, 발전용댐과 다목적댐간 연계 운영을 통해 최적의 용수공급능력을 파악하고자 한다. 본 연구에서는 팔당댐 상류유역에 위치한 댐의 용수공급능력을 분석하기 위해 댐 모의운영과 물수지 모형을 구축하였다. 해당 분석체계를 활용하여 화천댐, 소양강댐, 충주댐을 연계한 운영체계를 구축하여 용수공급능력을 평가하였다. 본 연구결과를 활용하여 용수공급능력 증대를 위한 연계운영 최적화 방안을 마련하고, 가뭄 등 비상상황 발생 시 용수공급조정 및 댐간 연계운영 수립 계획에 반영될 수 있을 것으로 판단된다.

  • PDF

Coupled Effectiveness of Dam and River Improvement Project (댐과 하천정비사업의 연계 효과 분석)

  • Lee, Gwang-Man;Lee, Eul-Rae;Lee, Yo-Sang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1616-1620
    • /
    • 2009
  • 댐이 건설된 이후 운영편익은 여러 가지 이유로 원래의 목적이나 목표를 달성하는데 어려운 상황이 발생하게 된다. 실제 대부분의 다목적댐의 경우 홍수기에 댐 하류 하천의 환경변화로 계획된 홍수량을 적절히 방류하지 못하는 사례가 늘고 있으며 이로 인해 유효 저수용량을 충분히 활용하지 못해 이수측면에서도 계획공급량을 충족시키지 못하는 경우가 발생하고 있다. 이는 하천이 댐에서 조절된 홍수량을 안전하게 하류로 배수시키는데 필요한 통수능을 충분히 확보하지 못하고 있기 때문이다. 이의 주요 원인은 댐 하류하천의 침식이나 제방상태가 부실하여 하천이 설계홍수량을 소통시키는데 많은 장애 요인을 갖고 있기 때문이다. 결국 하천의 통수능은 홍수조절과 관련된 댐 운영의 제약조건으로 작용하게 되어 댐 운영측면에서는 큰 손실을 야기하게 된다. 본 연구에서는 기존 다목적댐의 홍수기 운영제약조건으로 작용했던 하류의 통수능 개선을 통한 유효저수용량의 복원에 따른 기대효과를 분석하였다. 이를 통하여 댐의 유효저수용량 확보에 가장 큰 장애요인이라 할 수 있는 댐 직하류에서 계획홍수량의 일정 유량을 피해없이 방류할 수 있는 통수능 개선을 통해 이수목적의 유효저수용량의 회복이 현재의 운영여건에 비해 용수공급과 수력발전으로 대표되는 이수목적의 추가적 편익이 어떻게 발생하는지를 평가하였다.

  • PDF

Flow pattern simulation at Intake tower of reservoir (저수지 취수탑지점의 수체거동 모의)

  • Lee, Yo-Sang;Kim, Yu-Ri
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.924-928
    • /
    • 2009
  • 국내의 다목적댐 저수지는 물이 흐르는 하천에 용수공급, 홍수조절 및 수력발전을 위해 만든 구조물로 형성된 저류상태를 의미한다. 이러한 수체의 유동에 영향을 미치는 가장 중요한 요소로는 유입수와 저수지에서 하천으로 방류되는 방류수이므로 본 연구에서는 유입수와 방류수에 의한 수체의 유동만을 고려하였다. 대상지는 용담댐 유역중 취수탑이 있는 지점으로 길이는 약 1,250m이고 폭은 평균 375m 정도의 크기를 갖고 있는 지형이다. 대상 지역에서 저수지 수체의 흐름특성을 평가하기 위해 SMS-RMA2 모형을 적용하였으며 용담댐 저수지 구역에 대한 1m 간격의 등고선을 가지고 대상지역에 대하여 격자를 구성하였다. 격자 크기는 평균 길이 방향으로 43m, 폭 방향으로 15m 크기로 구성하였으며 유속이 상대적으로 빠른 취수탑 부근은 좀더 세밀하게 구성하였다. 4년간 수문자료를 분석하여 이 지역의 흐름을 년중 크게 3가지로 구분하였다. 수체거동이 급변하는 여름 강우기 후에 저수지에 물이 풍부한 경우의 흐름, 봄철 저수지 물이 풍부하지 않은 상태에서 주자천으로 부터의 유입은 최하인 상태의 경우 그리고 강우기에 짧은 기간 나타나는 주자천 위주 흐름의 경우로 구분하여 모의하였다. 각각의 경우 전체적인 흐름장은 확연히 다르게 나타났으며 이런 결과로 볼 때 수체의 흐름은 상하류의 유입량 변화에 따라 항상 흐름은 변화하는 것으로 평가되었으나, 저수지 수체의 흐름 속도는 모두 0.05$^{\sim}$1.5cm/sec 정도로 모의된 것은 수체적 대비 방류량이 적어서 나타나는 현상으로 평가되었다.

  • PDF

A Framework for Investment Justification and Economic Operation- (한국의 다목적댐 수력발전 체계-투자의 정당화와 경제적 운영-)

  • 이승규;박용삼
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.12 no.1
    • /
    • pp.157-157
    • /
    • 1987
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

Hydro-electric Power Generation System of Multi-purpose Dams in Koresa - A Framework for Investment Justification and Economic Operation - (한국의 다목적댐 수력발전 체계 - 투자의 정당화와 경제적 운영 -)

  • 이승규;박용삼
    • Korean Management Science Review
    • /
    • v.12 no.1
    • /
    • pp.157-173
    • /
    • 1995
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

  • PDF

Experiments on Efficiency of Standing Type Waterwheel with Narrow Canal for Micro/Small Scale Hydro Power Plant (초소수력발전용 좁은 수로 고정형 수직수차 성능실험)

  • Kim, Dong-Jin;Lee, Kyong-Ho;Ahn, Kook-Chan;Kim, Bong-Hwan;Lee, Chi-Woo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.11 no.5
    • /
    • pp.104-108
    • /
    • 2012
  • Recently, small scale hydropower needs to be developed due to its clean, renewable and abundant energy resources. However, suitable draft of hydro-turbine body in combination with differences in wheel blade shapes is not determined yet in the range of small hydropower and it is necessary to study for the effective draft in combination with type. Therefore, watermill shaped of 250mm diameter. hydro-turbine aiming 20 watt class generator is adopted in this study because of its simple structure and high possibility of applying to small hydropower. The result shows that effective draft for the turbine body is variable concerning the size of turbine and flow rate of water. Thus, the difference of water depth between fore and aft turbine body contributes to the increase of torque, angular momentum and power output.

A Comparative Study of Monthly Inflow Prediction Methods by using Stochastic model and Artificial Neural Network model (추계학적 모형과 신경망 모형을 이용한 월유입량 예측기법 비교 연구)

  • Kang, Kwon Su;Heo, Jun Haeng
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.1208-1212
    • /
    • 2004
  • 다목적댐을 효율적이고 체계적으로 운영하기 위해서는 수문순환에 대한 지역별, 기간별 이해와 더불어 댐저수지로의 정확한 유입량 산정이 필요하다. 수문모델링을 비교하기 위해서는 개념적 모형과 추계학적 모형으로 나눌 수 있는데 개념적 모형은 상당히 많은 입력요소로 말미암아 사용자로 하여금 이해를 하는데 있어서 어려움을 겪을 수 밖에 없는 실정이나 추계학적 모형은 확률적 철상 및 기초적 예측이론을 습득하게 되면 쉽고 간단하여 검토를 용이하게 할 수 있는 장점이 있다. 수자원시스템의 설계, 계획, 운영에 있어서 핵심적인 수문변수의 미래거동의 보다 나은 추정치가 필요하다. 예를 들어, 수력발전, 레크리에이션 이용과 하류지역의 오염희석과 같은 다중 목적을 유지하기 위하여 다목적댐을 운영할 때에, 다가오는 미래시간에 대한 계획된 유입량의 예측이 요구된다. 예측의 목적은 미래에 발생한 정확한 예측을 제공하는 것이다. 따라서 월유입량 예측을 위해 추계학적 모형(ARMA(1,1), ARMAX, TFN, SARIMA)과 신경망 모형(BP, CASCADE 등)의 적용을 통해 한강수게 주요 다목적댐에 가장 적합한 방법을 선정하고자 하는데 본 연구의 목적이 있다.

  • PDF