A calculation method on the loss of labor productivity due to change orders (설계변경으로 인한 작업 생산성 손실 산정방법)

  • Jeon Yong-Deok;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.295-300
    • /
    • 2001
  • Additional costs as well as schedule delay are occurred due to change orders in today's construction projects. Additional costs, overhead calculation methods are of various types. In a foreign country cases, many claims related to the loss of labor productivity quote research statistics data. In domestic cases, the study of the reason why the loss of labor productivity occurs and its effect have not been performed. Therefore, this paper analyzes factors affecting lost productivity and a methodology is presented to estimate the lost productivity.

  • PDF

A Methodology or Variable Cost for Reactive Power (무효전력의 변동비 산정 방법론)

  • Ma, Sam-Sun;Yoon, Yong-Beum;Kho, Kyung-Ho;Jung, Young-Bum
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.189-191
    • /
    • 2006
  • 전력시장의 도입과 함께 그동안 전력사업자가 자체적으로 운용하였던 계통보조서비스를 이제는 각 발전사에게 할당하여 공급하는 체계가 됨에 따라 이에 대한 적절한 보상이 주요 이슈화 되고 있다. 헌재 주파수제어나 예비력확보 등은 보상되고 있지만 무효전력 조정에 대해서는 아직까지 아무런 보상책이 없어 무효전력의 공급을 기피할 가능성이 있다. 그동안 무효전력의 최적비용에 대해서는 최적조류계산이나 한계송전손실계수 산정 등에 의해 각 모선별로 산정하는 방법은 연구되고 있지만 각 발전기의 변동비 측면의 접관은 실재 적용 가능한 현실적인 방법임에도 이에 대한 연구가 적었다. 여기서는 무효전력의 변동비를 산정하기 위해 손실에 따른 부가적 에너지를 구하고, 무효전력 운용 유지보수 비용 및 수명 저하에 따른 비용요소를 고려한다. 이 연구방법의 특징으로는 발전기측의 자료를 사용하여 각 발전기의 무효전력 공급에 따른 변동비를 산정할 수 있어 무효전력 공급에 대한 각 발전기별 보상을 할 수 있는 방법이다.

  • PDF

A study on the social cost estimation of the tunnel section enlargement method considering traffic flow (교통흐름을 고려한 터널단면 확대 시공기술의 사회적 손실비용 산정에 관한 연구)

  • Lee, Seung Soo;Kim, Dong-Gyou;Seo, Jong Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.487-497
    • /
    • 2015
  • Using existing tunnel for section enlargement and remodeling is being considered as an optimal alternative in order to solve traffic jam in tunnel. The existing method has been performed while blocking the traffic flow. Recently, New enlargement method was developed which can maintain traffic flow during the construction by using protector. It can minimize social loss due to keeping traffic flow. On the other hand, installing and operating protector can cause economic disadvantages. So, social cost estimation considering traffic flow should be considered for relevant economic evaluation of tunnel section enlargement methods. This paper presents the social cost estimation method of tunnel section enlargement methods considering traffic flow. In addition, to compare economic efficiency existing method with new method, suggested method was applied to Maebong Tunnel.

Status of the Universal Service Obligation and the Intangible Benefits (주요국 보편적서비스 제도 및 무형편익 적용 현황)

  • Baek Hyunmi;Byun Jaeho;Cho Eunjin;Song Yeonkyung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.10a
    • /
    • pp.627-630
    • /
    • 2004
  • 본 고에서는 국내 보편적서비스 제도와 해외 보편적서비스 제도를 개괄적으로 정리한 후, 최근 보편적서비스 제도에 있어서 이슈를 짚어보고자 한다. 각국의 보편적서비스에 관한 개요, 범위, 비용 산정, 손실보전 방법을 기본적으로 분석, 비교하고 최근 비용 산정에 있어 주요한 이슈로 부각되고 있는 무형편익 적용에 관한 각국의 입장과 방법론의 문제점을 살펴보고자 한다.

  • PDF

Optimum Life-Cycle Cost Design of Steel Bridges (강교의 생애주기비용 최적설계)

  • Cho, Hyo-Nam;Lee, Kwang-Min;Kim, Jung-Ho;Choi, Young-Min;Bong, Youn-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.4 s.65
    • /
    • pp.341-358
    • /
    • 2003
  • This paper proposed a general formulation of Life-Cycle Cost (LCC) models and LCC effective design system models of steel bridges suitable for practical implementation. An LCC model for the optimum design of steel bridges included initial cost and direct/indirect rehabilitation costs of a steel bridge as well as repair/replacement costs, loss of contents or fatality and injury losses, road user costs, and indirect socioeconomic losses. The new road user cost model and regional socioeconomic losses model were especially considered because of the traffic network. Illustrative design examples of an actual steel box girder and an orthotropic steel deck bridge were discussed to demonstrate the LCC effectiveness of the design of steel bridges. Based on the results of the numerical investigation, the LCC-effective optimum design of steel bridges based on the proposed LCC model was found to lead to a more rational, economical, and safer design compared with the initial cost-optimum design and the conventional code-based design.

Application of probabilistic VE/LCC Analysis Models for Quay Wall Structures (안벽구조물의 확률론적 VE/LCC 분석모델 적용방안)

  • Ahn, Jong-Pil;Lee, Cheung-Bin;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.71-79
    • /
    • 2007
  • It is common that the analysis of VE/LCC is performed in design phase of quay wall structures. The analysis is mainly executed based on experience and engineering sense of expert considering the selection of construction method, construction and maintenance cost. Recently there are increasing demands on the analysis that includes uncertainty and vulnerability of input parameters, for this purpose, fuzzy reliability based probabilistic VE/LCC analysis model for quay wall structures is suggested. In VE/LCC analysis for quay wall structures, the application of probabilistic analysis method give very similar results compare with those of deterministic analysis method. It is anticipated that the methodology proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the probabilistic life cycle cost and value analysis.

A Study on the Selection of a Bridge Structure Type Using DEA and LCC (DEA기법과 LCC개념을 활용한 교량형식 선정 방법에 관한 연구)

  • Han, Sam-Heui;Kim, Jong-Gil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.4
    • /
    • pp.101-111
    • /
    • 2013
  • In this study, DEA (Data Envelopment Analysis) was carried out on the four bridges, which have the same extension (L=1,615m), in order to select the most superior, economical method of construction using the LCC concept of each bridge structure in the case of the Ulsan-Pohang double track railway which is scheduled to be constructed. DEA models were analyzed with the CCR model, which was designed for the evaluation of relative efficiency of each model. The initial construction costs, maintenance costs, indirect costs (user costs + indirect loss of social costs), and life cycle costs were used as input variables, and average duration was applied as the output variable. LCC was applied to calculate the input variables, and to get the costs of LCC, 100 years of period and 4.83% of real discount rate were applied, and the costs are classified into initial construction, maintenance, user, and indirect loss of social cost. The analysis results showed that the Method 2 and 3 were evaluated as the most efficient, and the other alternatives were evaluated as the following order; Method 1, the default, and Method 4.

Improving the Estimation Method of Traffic Congestion Costs (교통혼잡비용 추정방법의 개선방안 연구)

  • Jo, Jin-Hwan;Hwang, Gi-Yeon
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.1
    • /
    • pp.63-74
    • /
    • 2010
  • Recently, there has been increasing demand from academic society in Korea for the improvement of current traffic congestion cost estimation methods. The purpose of this study is to suggest a better way to estimate congestion cost followed by in-depth review regarding traffic congestion. The key improvements proposed in this study include: 1) adding social externality to congestion cost, 2) integrating the green house and environmental pollution impacts with congestion costs, 3) taking non-recurrent traffic congestion costs into account for the assessment, 4) revising the criteria to determining the level of traffic congestion speed, and 5) deciding how to limit congestion measurement period. It is found meaningful that the improvements, notwithstanding difficulties in their real case application, provide invaluable insights in our efforts to change the meaning of congestion cost in an era of sustainable growth.

Economical Optimum Forest Road Density with five Cost Variable (5가지 비용변수를 이용한 경제적 측면에서의 적정임도밀도 산정)

  • Park, Soo-Kyoo;Kang, Gun-Uh
    • Journal of Korean Society of Forest Science
    • /
    • v.99 no.1
    • /
    • pp.1-8
    • /
    • 2010
  • The optimum forest road density was calculated with the method which is used in Europe on the investigation site in Korea. The economical optimum forest road density at the minimum total transport cost was 10.51 m/ha. The total transport cost was calculated 235,354 won/ha per year. The forest road construction cost amounted to 99,693 won/ha per year in case of the depreciation period of 30 years and the interest rate of 3%, the forest road maintenance cost amounted to 14,502 won/ha per year, the logging cost amounted to 99,564 won/ha per year, the cost of footpaths amounted to 18,142 won/ha per year, the cost by the loss of the production area amounted to 3,454 won/ha per year.

A Study on the Cost Estimation in Case of Termination in the Building Construction Contract (건축공사 계약해지에 따른 비용산정에 관한 연구)

  • Lee, Ho-Il;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.95-102
    • /
    • 2003
  • Financial difficulties and claims frequently stop construction works and cause subsequent contract cancellations. However, as the criteria to assess costs have not been established, many cases of legal disputes over the assessment of cancellation costs are taking place and the concerned parties are suffering the loss of time and money. Therefore, the present research aimed at developing a rational and systematic model of cancellation cost assessment following the cancellation of contracts. The research was carried out in the following methods and scopes. 1 ) The research was focused on the assessment of fair cancellation costs from constructors' side for contracts cancelled by any causes for which the owners have liability. 2) To obtain basic materials about cancellation cost assessment methods, contracts, claims, contract cancellations and construction-related laws at home and abroad were examined. 3) A cost assessment model was developed for systematization and efficient operation of cancellation cost assessment, and the reliability and efficiency of the proposed model was verified through a case study. The conclusions drawn from the research are as follows. The importance of the cancellation cost assessment model was confirmed as, using the cancellation cost assessment model, direct cancellation cost and indirect cancellation cost could be assessed systematically, the number of disputable items could be reduced because reasonable evidences of actual spending were presented, and the loss of constructors could be minimized because systematic and rational cost assessment became possible for many disputable cases of indirect cancellation cost, which the constructors had been unable to prove so far though having spent.