• Title/Summary/Keyword: 소규모 인원

Search Result 31, Processing Time 0.026 seconds

A Study of Usability Analysis on 'Low-Budget' Mobile Game Development (저비용 모바일 게임 개발사례 분석을 통한 사용성 연구)

  • Ahn, Duck-ki;Kim, Suk-rae
    • Journal of Digital Convergence
    • /
    • v.17 no.6
    • /
    • pp.355-363
    • /
    • 2019
  • This study is an analytical case study focusing on 'low-budget' mobile game development centered on both short-term development and small-scale collaboration. This study set up the assumption of four months as development period limited by three developers along with step by step productional documentation. In the previous study, we set up the responsibilities of the development personnels to analyze the effective process of the practical production. Furthermore, the study analyzed the usability verification of both advantages and disadvantages for conducting the quantitative survey with developer's feedbacks. The study is to provide the essential guideline for 'low-budget' development group with effective pipeline.

우리나라동굴의 환경변화에 관한 연구

  • 홍시환
    • Journal of the Speleological Society of Korea
    • /
    • v.21 no.22
    • /
    • pp.1-16
    • /
    • 1990
  • 동굴은 그 내부 규모에 따라서 최대 체동인원이 달라져야 한다. 소규모의 동굴속에 많은 관광객이 들어서면 동구가 좁아 외기와의 신진대사가 안되어 가벼운 두통이나 현기증을 느끼게 된다. 굴소는 보통 23%가 대기중에 존재하여야 생물의 생존에 아무런 지장이 없는 것인데 이보다 농도가 높아도 생물에 영향을 준다. 만일 60% 이상의 고농도가 되면 간염이나 순환계 장애가 일어나며 특히 인내성이 적은 동물은 수일만에 태반이 사망할 수도 있다.

  • PDF

Application Plan of Flooding Forecasting and Warning System by Site Type of Excavation Work (굴착공사현장 수재해 예방을 위한 침수 예·경보 시스템 적용방안에 관한 연구)

  • Wang, Jeong Ah;Park, Jong Pyo;Lee, Woo Jin;Jun, Hwan Don
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.379-379
    • /
    • 2022
  • 기후변화로 인해 집중호우, 돌발 홍수 및 태풍의 규모가 대형화되고 있고, 이에 따른 수재해 피해 사례도 증가하는 추세이다. 특히 건설 현장 중 굴착공사 현장에서의 침수로 인한 사고는 인명피해로 이어질 가능성이 더 크기 때문에 더욱 주의가 필요하다. 하지만 현재 국내에서 실질적으로 굴착현장에 적용하기 위한 침수 대응 예측 시스템 및 구체적인 침수 예경보 체계, 기준, 매뉴얼은 존재하지 않는 실정이다. 따라서 본 연구에서는 굴착공사현장의 수재해 예방을 위한 침수 예·경보 시스템의 적용방안을 제시하였다. 또한 경제적이고 효과적인 측면을 고려하여, 공사현장 규모에 따라 적용하는 침수 예·경보 시스템을 이분화하여 소규모 공사현장에는 Track A, 대규모 공사현장에는 Track B 침수 예·경보 시스템을 적용하도록 제안하였다. 이러한 이유는 소규모 공사현장의 특성상 전체 공사비가 작고 운영되는 장비와 인력이 제한적이므로 침수 예·경보에 필요한 비용과 인력 투입이 어려울 수 있기 때문이며, 또한 대피가 필요한 전체 인원이 대규모 현장에 비해서는 적기 때문에 비교적 신속하고 원활한 대피가 가능할 것이라고 판단하였기 때문이다. 본 연구에서는 각 시스템별 적절하다고 판단되는 예·경보 기준을 제시하였다. Track A에서는 강우법에 의한 최소한의 경보시스템으로 필요한 안전목표를 달성할 수 있도록 고려하였고, Track B에서는 현장인원 대부분이 성인 남성임을 고려하여, 성인 남성의 부상을 유발할 수 있는 수심(H)과 유속(V)의 곱을 척도로 하는 한계 H·V곡선을 기준으로 운영되는 경보시스템을 제안하였다.

  • PDF

The Process Improvement for A Small Organization using CMMI (CMMI를 이용한 소규모 조직의 업무프로세스 개선)

  • Choi, Jong-Sup;Seo, Jung-Hae
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.623-630
    • /
    • 2005
  • 통상 규모가 작고 프로세스가 정착이 되지 않은 소규모 조직에서는 조직원 개인의 능력에 따라 조직의 성과가 좌우되는 경우가 일반적이다. CMMI는 조직의 능력과 성숙도를 판단하는 기준을 제시함으로써 조직이 프로세스를 개선하는데 도움을 준다. 그러나 CMMI는 모델 자체에서 요구하는 실천사항(practices)이 많아, 소규모 조직에 이를 적용하는 것은 상당한 부담이 되는 면이 있다. 이 논문에서는, 한국 육군의 전투실험소가 인원 규모가 작고 프로세스가 정착되어 있지 않아, CMMI를 이용하여 규격화되고 정형화된 실험소 프로세스를 정립하는 방안을 제시하였다. 실험소의 규모를 고려하여 실험소 프로세스로서 CMMI의 4개 프로세스를 벤치마킹하여 적용하기를 제시하면서 이를 이용한 실험소 능력의 성숙도를 측정하는 방법도 제안하였다.

  • PDF

A Software Process Certification Model of Small sized Software Development Using Scrum (스크럼을 활용한 소규모 소프트웨어 개발 기반의 소프트웨어 프로세스 인증 모델)

  • Song, In-Oh;Rhew, Sung-Yul;Lee, Sung-Eun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.4
    • /
    • pp.215-223
    • /
    • 2011
  • It is difficult to apply a Software Process Certification to small scale project, because of much activities and documents for manage project and guarantee the qualities in small manpower. This paper presents optimized Software Process Certification Model for small scale software development, a combine Scrum with essential elements of NIPA's(National IT industry Promotion Agency) SP-Certification model. The proposed model defined minimum Activities and Documents for SP Certification. The model that I showed consists of 16 Processes and 58 Activities, and 39 Artifacts are created. As a result of having compared proposed model with a Standard Process of Small Business, I confirmed that a small scale project's burden reduced because Activity decreased 38% and Document decreased 20%. In order to verify the validity of the proposed model, applied it in two small scale projects, and compare with the project by Scrum process only, it finished that systematic management was possible without additional manpower, and reached SP-Certification level 2.

A Study on Effective Test Processing of Small Game Development Projects (소규모 게임 개발 프로젝트의 효과적인 테스트 프로세싱에 관한 연구)

  • Ha, Yoo-Jin;Lee, Min-Su;Jung, Eun-bi;Kim, Hyo-Nam
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2019.07a
    • /
    • pp.67-68
    • /
    • 2019
  • 소규모 인원으로 구성한 게임 개발 프로젝트에서 품질 관리를 수행할 때 폭포수 개발과 같은 전통적인 개발 방법론을 적용하는데 많은 어려움이 있다. 이에 대한 대안으로 상황에 따라 적용할 수 있도록 일부 과정을 수정하여 스크럼 방식의 애자일방법론을 제시한다. 본 논문에서는 소프트웨어 개발에 적용하는 애자일 기법을 게임 개발에 맞춘 테스팅 방식을 적용하여 실제 개발 과정에서 효과적으로 사용할 수 있는 방식인지를 검증하고 제안한다.

  • PDF

Improvement of the Risk Evaluation Methods for Small Bridges When Investigating the Small Public Facilities (소규모 공공시설 조사 시 소교량의 위험성 평가 방법 개선)

  • Jaesung Shin;Kyewon Jun;Jungsoo Rho
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.2
    • /
    • pp.33-47
    • /
    • 2023
  • Under the "Act on Safety Control of Small Public Facilities (enacted in 2015)", each local government selects and conducts annual safety inspections for small public facilities. Among small public facilities, small bridges pose high risks and are heavily utilized by local residents, making them challenging to manage due to their large numbers and limited resources. Therefore, there is a need for a rational selection method that considers the management capacity of local governments, as well as the establishment of objective risk evaluation and maintenance planning for small hazardous facilities. In this study, we propose a selection method based on structural and functional classification of small bridges, considering the management capacity of local governments. Additionally, we present quantitative evaluation indicators for ten risk evaluation criteria, aiming to facilitate objective risk evaluation.

Suggestions on Expanding Admission Number of Medical School (의과대학 정원 확대에 대한 제언)

  • Eun-Cheol Park
    • Health Policy and Management
    • /
    • v.34 no.2
    • /
    • pp.120-128
    • /
    • 2024
  • From February to now 2024, there continues to be controversy over the expansion of admission number to medical school. Some of the controversy arises from a mix of present and future time points. In the present time point, the controversy over whether physicians are some shortages or not has various aspects. Some aspects are presented as evidence of the physician shortage and others as non-shortage. Also, the presenting evidence of shortage is being disputed, and so is the evidence of the contrary. This controversy over whether there is a shortage or not in the present time point makes it difficult to reach a consensus. In 10 years, the shortage of doctors will increase due to the rapid increase in the elderly population, so the admission number of medical schools will need to be increased. However, the increase must be such that there is minimal deterioration in the quality of medical education. More admission numbers should be allocated to medical schools with a high quality of medical education. This study suggests that large-scale medical schools increase the admission number by 20%-30%, and small-scale medical schools increase the admission number by 40%-50%, if so, the total increasing number is 760 to 1,066. If the 2,000-person increase is enforced, the quality of medical education must be carefully evaluated and the results should be reflected in adjusting the admission number of medical schools. In 20 years later, the admission number of medical schools will have to be reduced. This is because the physician supply is changing to a linear function and the physician demand (medical care demand) is changing to a quadratic function. Even if the current number is maintained, there will be an excess of doctors from 2048, so the medical school admission number must be reduced and its size will be reduced to about 2,000, a 30% reduction from the current number. Because the same reduction rate for all medical schools will result in many small-scale medical schools, the M&A (mergers and acquisitions) strategy should be considered with 40 medical schools and 12 Korean medical schools. In Korea, the main contributor to estimating physician demand is the change in population structure. Due to the rapid decrease in the total fertility rate, future population projections are uncertain. The recent rapid increase in healthcare utilization should be reexamined in the forecasting of physician demand. Since the various factors that affect the estimate of doctor supply and demand are unclear, the estimate of physician supply and demand must be continuously conducted every five years, and the Health Care Workforce Committee must be established and operated. The effects of increasing the admission number of medical schools should be evaluated and adjusted annually.

A Defect Management Process based on Open Source Software for Small Organizations (소규모 조직을 위한 오픈 소스 소프트웨어 기반의 결함 관리 프로세스)

  • Han, Hyuksoo;Oh, Seungwon
    • Journal of KIISE
    • /
    • v.45 no.3
    • /
    • pp.242-250
    • /
    • 2018
  • For high-quality software development, it is necessary to detect and fix the defects inserted. If defect management activities are not properly performed, it will lead to the project delay and project failure due to rework. Therefore, organizations need to establish defect management process and institutionalize it. Process standard models handle defect management in the area of project monitoring and control. However, small organizations experience difficulties in implementing and applying defect management process in a real situation. In this paper, we propose a defect management process for small organization which is designed in accordance with the characteristics of a small projects such as few participants and short development period. The proposed defect management process will be based on a tool chain with open source software such as Redmine, Subversion, Maven, Jenkins that support a defect management process and SW Visualization in systematic way. We also proposed a way of constructing defect database and various methods of analyzing and controlling defect data based on it. In an effort to prove the effectiveness of the proposed process, we applied the process and tool chain to a small organization.